Carleton Wharf O'Briens Place Youghal Co. Cork
UNCONDITIONALPlanning application 19/6685
Cork - Cork County Council
Proposed Development
Alter and change the use of part of the existing ground floor reception and services area to provide 2 no. two bedroom apartments including new windows and doors located within an architectural conversation area- Extension of duration of permission granted under Planning Reference: 14/58005.
View the full application file on the council's planning portal →Application Timeline
Application received
13 Nov 2019
Decision: UNCONDITIONAL
9 Jan 2020
Decision due
16 Jan 2020
Application Details
- Location
- Carleton Wharf O'Briens Place Youghal Co. Cork
- Applicant
- N/A
- Application Type
- EXTENSION OF DURATION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 13 November 2019
- Status
- APPLICATION FINALISED
- Decision
- UNCONDITIONAL
- Decision Date
- 9 January 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Alter and change the use of part of the existing ground floor reception and services area to provide 2 no. two bedroom apartments including new windows and doors located within an architectural conversation area.
Carleton Wharf O'Briens Place Youghal Co Cork
To construct new extension to rear of existing dwelling and associated site works
Coastguard Station Youghal Co. Cork.
The change of use from retail to pre-school, modifications to the internal layouts and minor alterations to external elevations and associated ancillary site works to an existing retail unit.
O'Brien' Place Carleton Wharf Youghal Co. Cork
Permission to carry out works to the Green Park Comminutor Station, O' Briens Place, Youghal, Co Cork. The development involves modification of the existing comminutor station as part of the Youghal Main Drainage Scheme works include: Construction of a new storage and/wet well and associated valve chamber adjacent to the existing structure; Refurbishment of the existing structure to accomodate new pump control and odour management systems: New pumping, instrumentation and ordour management systems.
O' Briens Place Youghal Co. Cork
The re-surfacing of the existing parking area to provide a new car-park and wash-down facility for Coast Guard vehicles and associated site works.
Youghal Coast Guard Station Youghal-Lands Youghal Co. Cork
The re-surfacing of the existing parking area to provide a new car-park and wash-down facility for coast guard vehicles and associated site works.
Youghal Coast Guard Station Youghal-Lands Youghal Co. Cork
The demolition of rear wall and existing extensions of the above and the construction of a two storey rear extension to form 1 no. terraced dwelling. This work includes the replacement and restoration of windows to the front/roadside elevation of the protected structure and associated site works
6/7 Coast Guard Station Youghal
The renovation of an existing storage shed and the construction of an extension to the rear of the shed within the curtilage of a protected structure
6/7 Coastguard Station South Abbey Youghal.
The demolition of an existing storage shed, and the construction of a new storage shed bounding the site of a protected structure.
6/7 Coastguard Station Youghal
Retention of dormer windows to front and rear, bay window to rear and 2 no. windows to side of South Abbey House (PROTECTED STRUCTURE.)
South Abbey House South Abbey Youghal
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?