Belvelly Port Facility Marino Point In the townlands of Marino, Belvelly and Oldcourt Cobh, Co. Cork
CONDITIONALPlanning application 19/6783
Cork - Cork County Council
Proposed Development
Demolition, site infrastructure improvements, and utility upgrade works to stabilise the existing site and to provide capacity for future industrial development proposals at the Belvelly Port Facility. Demolition will comprise site clearance and demolition of all existing derelict super structures, including prill tower, concrete tanks, workshops, stores and office buildings; sub structures including foundations and floorslabs; and redundant services including piperacks, sumps and sea water cooling pipe. Site infrastructure improvements will comprise
- i.Infilling of the lagoon located at the north east of the site using a combination of imported material and suitable site-won demolition material
- ii.Site levelling works and construction of a flood protection revetment along the northern and north western perimeter of the site
- iii.Upgrade of existing main site entrance and provision of new emergency access along the north eastern frontage of the site; new internal road layout and site lighting along the new roads
- iv.Development of a new railway connection along the eastern boundary and restoration of the former rail siding at the north east of the site
- v.Widening of access road and bridge to the jetty
- vi.Tree planting along the northern and western boundary. Utility upgrade works will comprise
- vii.Provision of surface water drainage system, which includes treatment and disposal via outfalls to Cork Harbour
- viii.Provision of a foul effluent drainage system, on-site treatment via a wastewater treatment plant and discharge along the path of an existing outfall into Cork Harbour
- ix.Provision of fire water infrastructure along the new internal roadways and on the jetty
- x.Provision of site services, including potable water supply, new electrical infrastructure including a 10kV on-site substation and ducting for extra-low voltage and low voltage connection points
- xi.Diversion of natural gas, methanol and mains water pipelines. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning authority with the application. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.
Application Timeline
Application received
22 Nov 2019
Decision: CONDITIONAL
22 Jul 2020
Decision due
29 Jul 2020
Application Details
- Location
- Belvelly Port Facility Marino Point In the townlands of Marino, Belvelly and Oldcourt Cobh, Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 22 November 2019Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 22 July 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Demolition of existing cottage and construction of two storey dwellinghouse
Donegal Cobh
Demolition of cottage and construction of two storey dwellinghouse
Donegal Cobh
Construct a one and a half storey dwelling, incorporating existing foundations constructed under planning permission ref: 07/6850, install a waste water treatment plant and carry out ancillary site works
Donegal Cobh Co Cork
Two storey dwellinghouse
Donegal Cobh
Two storey dwellinghouse
Donegal Cobh
The demolition of ‘Summerlea Lodge’ (also known as ‘Summerlea House’, ‘Cluneveen’, or ‘Kilty House’) and adjacent outbuilding including associated site works.
Donegal (Townland) Carrigaloe Cobh Co. Cork
Planning Permission for (a) conversion of existing domestic garage ( part of existing bungalow ) to a bedroom and study and (b) new single storey rear and side extension to house a kitchen and living area, both (a) and (b) are to form a Granny Flat as part of existing bungalow.
Donegal Hill, Donegal, Cobh, Co. Cork, P24 P622
Retention of existing single storey extension and Permission for internal and external alterations, refurbishment and construction of extensions, including first floor extension to existing single storey dwelling, a new site entrance and associated site works including cantilevered decking; the proposed extensions will include a sitting room on ground floor and two bedrooms with bathroom on first floor; the alteration refers internally to the re-organisation of the existing layout and externally to the change of material and appearance on existing finishes; the associated site works include a cantilevered decking, a new boundary wall along the public footpath and landscaping
"The Bungalow" Carrigaloe Donegal Cobh
Retention of a hard standing area for open storage of plant hire machinery
Belvelly Cobh .
1 no. prefabricated classroom
Star of the Sea Pembroke Passage West
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?