Proposed Development
The importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a temporary new haul road. A Natura Impact Statement (NIS) has been prepared and submitted to the authority with this application.
View the full application file on the council's planning portal →Application Timeline
Application received
22 Nov 2019
Decision: REFUSED
24 Jan 2020
Decision due
27 Jan 2020
Application Details
- Location
- Gortacrue Midleton Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 22 November 2019
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 24 January 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling. The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Ballyspillane West Gortacrue Carrigogna Midleton, Co. Cork
3.43km of grid connection infrastructure on the public road to connect the approved Ballyspillane West Solar Farm (Planning Reference 175498) to the Midleton 110kV ESB Substation, comprising the laying of underground electricity cables and associated infrastructure and horizontal directional drilling. The proposed development will also include a customer substation which is proposed to relocate the substation consented within the associated solar farm development (PA Ref: 175498). The ESBN MV customer substation is to be located near the site entrance to the east, to align with the connection route to the national grid. Based on new ESB Networks design standards, two options have been considered for the design of the proposed substation. A Natura Impact Statement will be submitted to the Planning Authority with the application.
Ballyspillane West Gortacrue Carrigogna Midleton, Co. Cork
Demolition of extension, construction of one and half storey and single storey extension to dwelling, septic tank and percolation area
Gortacrue, Midleton
Dwelling, garage, septic tank, percolation area, well, new site entrance & associated site works
Gortacrue Midleton
Dwellinghouse and garage
Broomfield East Midleton
Dwellinghouse, partially one-and-a-half storey, partially dormer style, partially single storey, detached garage, septic tank and associated site works
Broomfield East Midleton
Part one-and-a-half storey, part dormer style and part single storey dwellinghouse, detached garage and associated site works
Broomfield East Midleton
Installation of a cattle underpass, soiled water tank and associated works.
Gortacrue Midleton Co. Cork
Dwellinghouse and inststallation of septic tank
Broomfield East Midleton
Construction of sunroom extension to dwelling
Ballyspillane West Midleton
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?