Rossmore Quarry Carrigtwohill Co. Cork
Conditional PermissionPlanning application 20/4124
Cork - Cork County Council
Proposed Development
The development will consist of the installation of a readymix concrete batching plant, ground limestone processing plant, ground limestone storage building (c. 240 m2), closed circuit settlement system and all ancillary works, within an application area of c. 0.85 hectares at the existing quarry landholding.
Application Timeline
Application received
31 Jan 2020
Decision due
4 Nov 2020
Decision: Conditional Permission
4 Nov 2020
Grant issued
9 Dec 2020
Application Details
- Location
- Rossmore Quarry Carrigtwohill Co. Cork
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 31 January 2020Other applications received that week
- Status
- Application Closed
- Decision
- Conditional Permission
- Decision Date
- 4 November 2020
- Grant Date
- 9 December 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of concrete batching plant with associated silos and hoppers, storage bays, concrete reclaimer, washout lagoons, control cabin, truck parking and all associated site development works at existing quarry
Rossmore Carrigtwohill
The development consists of the continued use of the existing asphalt plant, the existing storage shed (837 sq. metres), and associated infrastructure and structures permitted under P. Ref. S/02/5476 (ABP Ref. PL04.203762); P. Ref. 14/04061; and P. Ref. 14/06489 (ABP Ref. PL04.244651) within an application area of 1.605 Hectares.
Rossmore Carrigtwohill Co. Cork
Permission for provision of covered storage shed over existing aggregate storage bays within the existing quarry site. The shed will be c.917.7m2 with a maximum ridge height of c.11.8m
Rossmore Quarry Rossmore Carrigtwohill Co.Cork
An increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under Planning Reg. Nos. 18/06874, 19/5050 and 20/04589), from 100 no. days per annum to 150 no. days per annum, within an application area of 1.605 Hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
The development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref’s 18/06874 and 19/5050), from 60 no. days per annum to 100 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
Development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref. 18/6874), from 40 no. days per annum to 60 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
An increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under Planning Reg. Nos. 18/06874, 19/5050 and 20/04589), from 100 no. days per annum to 150 no. days per annum, within an application area of 1.605 Hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
The application site comprises an existing asphalt plant (permitted as part of overall quarry development under Cork County Council Planning Ref. No. 02/5476, and An Bórd Pleanála Ref. No. PL04.203762) The proposed development seeks to provide for the extension of opening hours of asphalt plant to allow operations on site between 0600 hours and 1900 hours Mondays to Fridays and between 0700 hours and 1600 hours on Saturdays; occasional operations outside of normal working hours up to a maximum of 40no. days per annum. The proposed development will not result in any increase in the permitted output rate of existing quarry, which will be maintained at a rate of 250000 tonnes per annum
Rossmore Carrigtwohill Co.Cork
Construction of concrete batching plant with associated intake hopper, storage bunkers, lagoons, weighbridge office, weighbridge, wheelwash, concrete reclaimer, bottlewash, concrete yard, vehicular entrance and associated site development and landscaping works
Rossmore Carrigtwohill
Divert section of existing overhead line and erect 2 no. 15m and 1 no. 12m 38kV steel masts
Rossmore Carrigtohill
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?