← Back to search

Curryclogh Bandon Co. Cork

INCOMPLETED APPLICATION

Planning application 20/4514

Cork - Cork County Council

Proposed Development

A dwelling house, detached garage, wastewater treatment system, new vehicular entrance and other ancillary services.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Mar 2020

  2. Decision due

    5 May 2020

Application Details

Location
Curryclogh Bandon Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
10 March 2020
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
5 May 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
20/4876CONDITIONAL30 Apr 2020

A dwelling house, detached garage, wastewater treatment system, new vehicular entrance and other ancillary services.

Curriclough, Curryclogh t.d Bandon Co. Cork

214m
24/5184INCOMPLETED APPLICATION24 Jun 2024

Permission for (a) demolition of a side wing to an existing dwelling house, (b) construction of an extension to the existing dwelling house, (c) elevational changes to the existing dwelling house to provide for additional windows, (d) change of use of existing farm out buildings to 2 no. residential apartments for short-term letting use, (e) construction of additional floor area and elevational changes to incorporate new windows and doors to align with proposed apartment layouts, (f) installation of a wastewater treatment unit and associated percolation area and (g) all associated site works

Curryclogh Bandon Co. Cork

214m
24/5488Conditional Permission6 Aug 2024

Permission for (a) Demolition of a side wing to an existing dwelling house, (b) Construction of an extension to the existing dwelling house, (c) Elevational changes to the existing dwelling house to provide for additional windows, (d) Partial demolition of existing farmyard buildings and change of use of existing farm out buildings to 2 no. residential apartments for short-term letting use, (e) Construction of additional floor area extra over to the existing footprint of the farmyard outbuildings and elevational changes to incorporate new windows and doors to align with proposed apartment layouts, (f) Installation of a wastewater treatment unit and associated percolation area and (g) All associated site works.

Curryclogh Bandon Co Cork

269m
23/4976CONDITIONAL16 May 2023

Disconnect an existing wastewater system and install a new wastewater treatment system and all associated site works.

Gurteen House Gurteen Bandon Co Cork

269m
23/4613INCOMPLETED APPLICATION31 Mar 2023

Permission to disconnect an existing waste water treatment system and install a new wastewater treatment system and all associated site works

Gurteen House Gurteen Bandon Co.Cork

278m
05/1631CONDITIONAL18 Mar 2005

Conversion of outhouse to self contained dwelling, alterations and two storey extension with mezzzanine floor to existing dwellinghouse and installation of proprietary treatment plant and associated site works

Gurteen House Gurteen Bandon

286m
24/4602WITHDRAWN9 Apr 2024

Permission for the refurbishment and extension to an existing derelict Gate Lodge, (NIAH Reg No 20909643), new wastewater treatment plant and all associated site works.

Gurteen Gate Lodge Gurteen Bandon Co. Cork

517m
08/4630CONDITIONAL7 Feb 2008

Construction of single storey 100 bed nursing home, single storey storage /services building, car park area and internal roadways, underground water tank for fire fighting purposes and all associated site works

Curryclogh Bandon

517m
13/5784REFUSED13 Sept 2013

Construction of 100 bed nursing home, single storey storage/service building and carpark area - Extension of duration of permission granted under Planning Reg. No. 08/4630

Curryclogh Bandon

546m
22/4334CONDITIONAL17 Feb 2022

The construction of a detached domestic garage.

Curryclogh Bandon Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?