← Back to search

Baltydaniel West Td Mallow Co. Cork

CONDITIONAL

Planning application 20/4602

Cork - Cork County Council

Proposed Development

Permission for retention of the following: (1) 2 No. Extensions to the rear of existing dwelling, (2) extension to the rear of existing domestic garage, (3) a domestic store room, (4) a domestic shed and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 Mar 2020

  2. Decision: CONDITIONAL

    30 Jun 2020

  3. Decision due

    13 Jul 2020

  4. Grant issued

    4 Aug 2020

Application Details

Location
Baltydaniel West Td Mallow Co. Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
24 March 2020Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
30 June 2020
Grant Date
4 August 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

84m
17/4193CONDITIONAL1 Feb 2017

The construction of new waste water treatment plant including (a) Control building, (b) over-ground glass lined steel SBR (Sequential Batch Reactor Wastewater Treatment process) tank, (c) overground precast concrete sludge holding tank, (d) underground balance tanks, (e) underground pump sump, (f) compound fencing and gates, (g) relocation of existing containerised kiosk (to be used for the storage of equipment and bunded containers of liquid additives for use in treatment process) (h) de-commissioning of existing wastewater treatment plant and (i) all ancillary works associated with the proposed development to serve their existing manufacturing plant

Baltydaniel West and Baltydaniel East Mallow Co.Cork

222m
16/5772CONDITIONAL15 Jul 2016

Construction of an extension to the side of an existing two storey dwelling, alterations to front elevations to include new windows, the addition of 4 no. roof lights and all associated site works.

Baltydaniel West Mallow Co. Cork

224m
25/6112Invalid - Prepare Letters6 Oct 2025

Permission to: a) Demolish single storey sun room to south west elevation of the existing two storey dwelling house, b) Make minor alterations to the fenestration of the existing south east and north east elevations of the existing dwelling house, c) Construct a new single storey extension to the south west elevation of the existing two storey dwelling house, d) Construct a new single storey extension to the south east elevation of the existing two storey dwelling house, e) Install a new percolation area and all associated site works.

Baltydaniel West, Mallow, Co. Cork, P51HH39

314m
06/13022CONDITIONAL6 Dec 2006

Construction of slatted shed

Baltydaniel East Mallow

315m
11/6684CONDITIONAL22 Dec 2011

Construction of extension to existing dairy, new agricultural shed to cover existing slurry pit and cow collection yard and incorporating a new cubicle area and straw bedded area

Baltydaniel East Mallow Co. Cork

318m
12/6597CONDITIONAL20 Dec 2012

Extension to agricultural shed incorporating extension to milking parlour, new dairy and new pump house

Baltydaniel East Mallow Co.Cork

318m
17/5946INCOMPLETED APPLICATION27 Jul 2017

(A) Construct a shed over existing slatted tank incorporating new cubicles, feed passage, store and new slatted tank and (B) Demolish existing milking parlour and construct new milking parlour, dairy, pump house, drafting area and store.

Baltydaniel East Mallow Co Cork

318m
17/6240CONDITIONAL29 Aug 2017

To (A) construct a shed over existing slatted tank incorporating new cubicles, feed passage, store and new slatted tank and (B) demolish existing milking parlour and construct new milking parlour, dairy, pump house, drafting area and store

Baltydaniel East Mallow Co. Cork

323m
26/1191Grant with Conditions7 May 2026

Permission for a change to condition number 11 of planning reference 24/6313, which required the northern site entrance to be blocked up. Permission is now being sought to keep the northern site entrance and to close the southern site entrance.

Baltydaniel East and Baltydaniel West, Mallow, Co. Cork. P51 WF9D

323m
24/6313Conditional Permission5 Dec 2024

1) Permission for retention of the existing dwelling as constructed (change of layout and design from that previously granted under reference number 75/925). 2) Permission for retention of the attached lean-to storage area to side of dwelling. 3) Permission for decommissioning of the existing septic tank and installation of a new wastewater treatment system. 4) Permission for retention of the existing site boundaries (change to the site boundary granted under reference 75/925).

Baltydaniel East & Baltydaniel West Mallow Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.