Brinny Innishannon Co. Cork

CONDITIONAL

Planning application 20/5110

Cork - Cork County Council

Proposed Development

A 50sqm single storey extension to building 22, which will be used for the purposes of gowning, staging and entry into an existing laboratory, including all associated modifications and site development works. This application relates to a development, which comprises an activity for which an Industrial Emissions License under part IV of the Environment Protection Agency 1992 (as amended) is required.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Jun 2020

  2. Decision: CONDITIONAL

    27 Jul 2020

  3. Decision due

    28 Jul 2020

  4. Grant issued

    31 Aug 2020

Application Details

Location
Brinny Innishannon Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
3 June 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 July 2020
Grant Date
31 August 2020

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

2m
17/6707CONDITIONAL18 Oct 2017

(a) 2 no. external enclosed lifts (1no. personnel/accessible lift from ground floor to first floor on the eastern elevation (including ground floor canopy) and 1 no. goods/personnel lift from ground floor to roof level (including lift lobby at roof level) on the western elevation; (b) a partial internal mezzanine floor over the existing first floor for the storage of mechanical equipment; (c) additional mechanical plant at roof level, including AHUs, extract fans, electrical room, CSR, equipment platform, chiller and vents; (d) part replacement of existing external cladding at first floor level with new fenestration on all elevations; and (e)all associated modifications and site development works to the existing Building 22 at facility. This application relates to a development which comprises an activity for which an Industrial Emissions Licence under Part IV of the Environmental Protection Agency 1992 (as amended) is required.

Brinny Innishannon Co. Cork

2m
11/6052CONDITIONAL23 Sept 2011

Works to existing building 22 fermentation building previously granted permission under Planning Reg. No. S/93/464 consisting of:[a] elevational changes to the ground floor of the existing two storey structure consisting of replacement of existing cladding with new windows, doors and metal cladding to the south, east and west elevations and associted paths and landscaping, and [b] retention of existing extension to the south east corner of the building on the ground and first floors

Brinny Innishannon

11m
25/5771Grant with Conditions3 Sept 2025

Permission for (A) Single storey extension to existing laboratory building (Building 22) with external mechanical plant platform (above roof of extension). (B) Elevational modifications to building 22 and associated site works. This application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA).

Brinny, Innishannon, Co. Cork, T12 RD82

12m
25/5643Invalid - Case Closed15 Aug 2025

Permission for a) Single storey extension with external mechanical plant platform (above roof of extension) to building 22, b) Elevational modifications to building 22, c) Associated site development works. This application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA).

MSD Brinny Innishannon Co. Cork

18m
11/5978INCOMPLETED APPLICATION15 Sept 2011

Works to existing Building 22 fermentation building previous Pl. Reg. No. S/93/0464: (A) Elevational changes to the ground floor of the existing two storey structure consisting of replacement of existing cladding with new windows, doors and metal cladding to the south, east and west elevations and associated paths and landscaping, (B) Retention of the existing extension to the south east corner of the building on the ground and first floors

Brinny Innishannon Co. Cork

20m
18/4345CONDITIONAL9 Feb 2018

Retention for the construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22). This application relates to a development which comprises an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency 1992 (as amended) is required.

Brinny Innishannon Co. Cork

21m
17/6515INCOMPLETED APPLICATION28 Sept 2017

The construction of a 14sqm first floor extension to the east façade of an existing production building (Building 8) for a new cold room storage for industrial/pharmaceutical use and the construction of 2no. new door openings to the ground floor of the north façade of an existing production building (Building 22).

Brinny Innishannon Co.Cork

44m
22/4275CONDITIONAL11 Feb 2022

The development will consist of the construction of a two storey extension with external mezzanine at roof level (17.130m High) to the existing production building, a single storey extension to the existing electrical sub-station (5.289m high), external plant, pipe-rack, pumps and associated equipment. The application relates to a development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency (EPA)

Brinny Innishannon Co.Cork

57m
17/5507INCOMPLETED APPLICATION15 Jun 2017

A single storey extension to the north of building 4 Suite 2 to facilitate the transfer of material from the production suite, (floor area of 24.8sq.m) and associated site works. The replacement of the existing site security fencing to the perimeter of the site with a new 2400mm high fence. This application relates to development which comprises of an activity which requires an integrated pollution permission and control license.

Brinny Innishannon Co. Cork Co. Cork

61m
17/6716CONDITIONAL19 Oct 2017

Demolition of an existing storage shed and the construction of a two storey modular office building, including an external stairs, pedestrian access ramp, and associated development site and landscaping works at facility. This application relates to a development which comprises an activity for which an Industrial Emissions Licence under part IV of the Environment Protection Agency 1992 (as amended) is required.