Proposed Development
- (a)Construction of extension to rear of existing dwelling house, septic tank and percolation area
- (b)demolition of existing glazed porch and alterations to front of existing dwelling house;
- (c)demolition of existing extension to rear of dwelling house along with all associated site works.
Application Timeline
Application received
31 Dec 2020
Decision: CONDITIONAL
24 Feb 2021
Decision due
26 Feb 2021
Grant issued
29 Mar 2021
Application Details
- Location
- Knockraha East Knockraha Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 31 December 2020Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 24 February 2021
- Grant Date
- 29 March 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwellinghouse
Knockraha East Knockraha
Dwelling
Knockraha East Knockraha
Dwellinghouse
Ballynanelagh Knockraha
Permission for 1 no. enclosed battery energy storage system compound on a total of c. 2-hectare site, to include; 1 no. 110kV AIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 33/110kV transformer and 1 no. auxillary transformer, battery storage blocks on concrete support foundations with Power Conversion System (PCS) contained within 16 units. Planning permission application also includes access roads and a site entrance, all associated electrical cabling and ducting and associated works including gates, fencing and security. The proposed development will have a projected life span 35 years.
Ballynanelagh Knockraha Co.Cork
Permission is sought for Island Stability Services Limited are applying for a 10 year planning permission to develop a low carbon inertia services (LCIA) grid support facility, which will connect to the adjoining ESB Knockraha 220kV Electricity Substation. The proposed development will have a projected life span of 50 years. The development is to be located within a site compound c. 2.2 ha and will consist of the following elements: The development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator and flywheel (c.512m2 c.12m high); Customer substation (c.250m2 c.7m high) and TSO substation (c.375m2 c.9m high), Cooling equipment, 6 No. modular containers to house electrical and control equipment, generator step-up transformer, auxiliary transformer and electrical plant including an external circuit breaker; 1 no. firefighting water tank and pump, boundary fencing (c.3m high) and CCTV, connection to the neighbouring ESB Substation and all other ancillary site works including access roads.
Ballynanelagh Knockraha Co. Cork
Permission for 1 no. enclosed battery energy storage system compound on a total of c. 2 hectare site, to include: Battery storage blocks on concrete support foundations with Power Conversion Systems (PCS) contained within 16 units, 1 no. 110 kV AIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 33/110 kV transformer and 1 no. auxiliary transformers, construction compound, firewater reservoir, store room, welfare unit, dam along the northern boundary, a retention basin, soakage swale and a diesel backup generator. Planning permission application also includes access roads and a site entrance, all associated electrical cabling and ducting and associated works including gates, fencing and security. The proposed development will have a projected life span of 35 years.
Ballynanelagh Knockraha Co Cork
Permission is sought for Island Stability Services Limited are applying for a 10 year planning permission to develop a low carbon inertia services (LCIA) grid support facility, which will connect to the adjoining ESB Knockraha 220kV Electricity Substation. The proposed development will have a projected life span of 50 years. The development is to be located within a site compound c. 2.2 ha and will consist of the following elements: the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator flywheel (c.512m2 c.12m high); customer substation (c.250m2 c.7m high) and TSO substation (c.375m2 c.9m high), cooling equipment, 6 no. modular containers to house electrical and control equipment, generator step-up transformer, auxiliary transformer and electrical plant including and external circuit breaker; 1 no. firefighting water tank and pump, boundary fencing (c.3m high) and CCTV, connection to the neighbouring ESB Substation and all other ancillary site works including access roads.
Ballynanelagh Knockraha Co. Cork
Extension to dwelling
Killeena Knockraha
Alterations, garage conversion and extension to bungalow
Killeena Knockraha
To erect a new 2 storey dwelling house, with a single storey annex, as a replacement dwelling for the existing habitable dwelling on the site (Eircode T56 X065), for permission to install a new on-site sewage treatment unit, construct a new main entrance to the site from the local road L-2966-0, and for all associated site development works.
Killeena Knockraha Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?