← Back to search

Farran Mourneabbey Co. Cork

CONDITIONAL

Planning application 21/4443

Cork - Cork County Council

Proposed Development

Modifications and alterations to the existing dwelling house, namely

  1. A)
    a 0.17 m. increase in ground floor level
  2. B)
    removal of existing roof and construction of new roof with associated 2.42 m. increase in ridge height
  3. C)
    provision of a 66.00 Sq. m./ 710.41 Sq. Ft. first floor living space
  4. D)
    modifications to existing front elevation (west-facing), to include; removal of existing set of ground floor sliding doors and all existing ground floor windows, and installation of 4 no. ground floor windows and a ground floor door
  5. E)
    modifications to existing rear elevation (east-facing), to include; removal of existing ground floor door and all existing ground floor windows and installation of 2 no. ground floor windows, a ground floor door with glazed side panel, and a set of ground floor double doors with glazed side panels
  6. F)
    modifications to existing side elevation (north-facing), to include; installation of a ground floor window and 2 no. first floor windows
  7. G)
    modifications to existing side elevation (south-facing), to include; installation of 2 no. ground floor windows and 2 no. first floor windows
  8. H)
    removal of existing septic tank and percolation area and installation of new septic tank and percolation area
  9. I)
    installation of private well,
  10. J)
    all ancillary works.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Feb 2021

  2. Decision: CONDITIONAL

    31 May 2021

  3. Decision due

    9 Jun 2021

  4. Grant issued

    6 Jul 2021

Application Details

Location
Farran Mourneabbey Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
23 February 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
31 May 2021
Grant Date
6 July 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?