Killeena Knockraha Co. Cork
Conditional PermissionPlanning application 21/4565
Cork - Cork County Council
Proposed Development
- 1.Demolition of storage building, derelict buildings along with agricultural building
- 2.Construction of following:
- A.Agricultural building for the storage of straw, agricultural machinery and ancillary dry goods
- B.Agricultural building for straw bedded livestock housing and associated livestock crush facilities
- C.Unroofed slatted slurry tank and unroofed manure store along with associated site works.
- A.
Application Timeline
Application received
9 Mar 2021
Decision: Conditional Permission
27 Apr 2021
Decision due
29 Apr 2021
Grant issued
31 May 2021
Application Details
- Location
- Killeena Knockraha Co. Cork
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 9 March 2021Other applications received that week
- Status
- Application Closed
- Decision
- Conditional Permission
- Decision Date
- 27 April 2021
- Grant Date
- 31 May 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for a synchronous compensator (electricity grid stabilization) development within the townland of Killeena, near Knockraha, Co.Cork within a site area of approximately 0.8 hectares. Planning permission is sought for; (1) a High Inertia Synchronous Compensator (HISC) compound consisting of the following; 1 no. High Inertia Synchronous Compensator (HISC) building enclosed within a steel clad framed, housed structure (12.1m height with a total area of 504 sq.m); electrical container area consisting of 8 no. electrical equipment containers, 4 no. external cooler units; 1 auxiliary and start up Static Frequency Converter (SFC) transformer; 1 generator circuit breaker, 1 emergency diesel generator and 1 associated diesel storage tank. (2) a High Voltage (HV) compound consisting of a main transformer and high voltage equipment. (3) a Gas Insulated Switchgear (GIS) building compound consisting of the following; high voltage Gas Insulated Switchgear (GIS) housed structure (13.5m height with a total area of 558 sq.m); (4) upgrade to the existing site entrance onto the L6989, internal access tracks, fencing, landscaping and drainage. Planning permission is sought for a period of 10 years.
Killeena Knockraha Co.Cork
The development will consist of the Construction of an electricity storage facility comprising a Battery Energy Storage System (BESS), within a total site area of up to 7ha, to include one electrical compound, electrical transformer/inverter station modules, battery storage enclosures (BSEs), power conversion systems on concrete support structures, attenuation pond, indicative 110kV buried import/export cable and indicative 110kV substation to facilitate connection to the existing 220kV Knockraha substation, upgraded access tracks, crane hardstanding, associated electrical ducting, palisade security fencing and CCTV system, landscaping works, lighting poles and all other ancillary and miscellaneous site works including site clearance. The Natura Impact Statement will be submitted to the Planning Authority with the application. The Natura Impact Statement will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority.
Agricultural field located on Ballynanelagh Road to the south of existing 200KV Knockraha Substation, Within the townland of Kileeena, Knockraha
Permission is sought for Island Stability Services Limited are applying for a 10 year planning permission to develop a low carbon inertia services (LCIA) grid support facility, which will connect to the adjoining ESB Knockraha 220kV Electricity Substation. The proposed development will have a projected life span of 50 years. The development is to be located within a site compound c. 2.2 ha and will consist of the following elements: the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator flywheel (c.512m2 c.12m high); customer substation (c.250m2 c.7m high) and TSO substation (c.375m2 c.9m high), cooling equipment, 6 no. modular containers to house electrical and control equipment, generator step-up transformer, auxiliary transformer and electrical plant including and external circuit breaker; 1 no. firefighting water tank and pump, boundary fencing (c.3m high) and CCTV, connection to the neighbouring ESB Substation and all other ancillary site works including access roads.
Ballynanelagh Knockraha Co. Cork
Permission for 1 no. enclosed battery energy storage system compound on a total of c. 2-hectare site, to include; 1 no. 110kV AIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 33/110kV transformer and 1 no. auxillary transformer, battery storage blocks on concrete support foundations with Power Conversion System (PCS) contained within 16 units. Planning permission application also includes access roads and a site entrance, all associated electrical cabling and ducting and associated works including gates, fencing and security. The proposed development will have a projected life span 35 years.
Ballynanelagh Knockraha Co.Cork
Permission is sought for Island Stability Services Limited are applying for a 10 year planning permission to develop a low carbon inertia services (LCIA) grid support facility, which will connect to the adjoining ESB Knockraha 220kV Electricity Substation. The proposed development will have a projected life span of 50 years. The development is to be located within a site compound c. 2.2 ha and will consist of the following elements: The development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator and flywheel (c.512m2 c.12m high); Customer substation (c.250m2 c.7m high) and TSO substation (c.375m2 c.9m high), Cooling equipment, 6 No. modular containers to house electrical and control equipment, generator step-up transformer, auxiliary transformer and electrical plant including an external circuit breaker; 1 no. firefighting water tank and pump, boundary fencing (c.3m high) and CCTV, connection to the neighbouring ESB Substation and all other ancillary site works including access roads.
Ballynanelagh Knockraha Co. Cork
Permission for 1 no. enclosed battery energy storage system compound on a total of c. 2 hectare site, to include: Battery storage blocks on concrete support foundations with Power Conversion Systems (PCS) contained within 16 units, 1 no. 110 kV AIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 33/110 kV transformer and 1 no. auxiliary transformers, construction compound, firewater reservoir, store room, welfare unit, dam along the northern boundary, a retention basin, soakage swale and a diesel backup generator. Planning permission application also includes access roads and a site entrance, all associated electrical cabling and ducting and associated works including gates, fencing and security. The proposed development will have a projected life span of 35 years.
Ballynanelagh Knockraha Co Cork
Construction of a conservatory extension to existing dwelling house
Gile Greine Reanasallagh Knockraha
Alterations to existing station comprising of new noise barriers to existing transformers T2101 & T2102 and associated site works
ESB Knockraha 220kV station Ballynanelagh Knockraha
Installation of waste treatment system in the Knockraha 220kv Station
BALLYNANELAGH, BALLYNANELAGH,
36m high communications structure, carrying ,antennae & communication dishes, equipment cabins & fencing
BALLYNANELAGH, BALLYNANELAGH,
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?