  1. 1.
    Demolition of storage building, derelict buildings along with agricultural building
  2. 2.
    Construction of following:
    1. A.
      Agricultural building for the storage of straw, agricultural machinery and ancillary dry goods
    2. B.
      Agricultural building for straw bedded livestock housing and associated livestock crush facilities
    3. C.
      Unroofed slatted slurry tank and unroofed manure store along with associated site works.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Mar 2021

  2. Decision: CONDITIONAL

    27 Apr 2021

  3. Decision due

    29 Apr 2021

  4. Grant issued

    31 May 2021

Application Details

Location
Killeena Knockraha Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
5 March 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 April 2021
Grant Date
31 May 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

169m
22/4488CONDITIONAL7 Mar 2022

Permission for a synchronous compensator (electricity grid stabilization) development within the townland of Killeena, near Knockraha, Co.Cork within a site area of approximately 0.8 hectares. Planning permission is sought for; (1) a High Inertia Synchronous Compensator (HISC) compound consisting of the following; 1 no. High Inertia Synchronous Compensator (HISC) building enclosed within a steel clad framed, housed structure (12.1m height with a total area of 504 sq.m); electrical container area consisting of 8 no. electrical equipment containers, 4 no. external cooler units; 1 auxiliary and start up Static Frequency Converter (SFC) transformer; 1 generator circuit breaker, 1 emergency diesel generator and 1 associated diesel storage tank. (2) a High Voltage (HV) compound consisting of a main transformer and high voltage equipment. (3) a Gas Insulated Switchgear (GIS) building compound consisting of the following; high voltage Gas Insulated Switchgear (GIS) housed structure (13.5m height with a total area of 558 sq.m); (4) upgrade to the existing site entrance onto the L6989, internal access tracks, fencing, landscaping and drainage. Planning permission is sought for a period of 10 years.

Killeena Knockraha Co.Cork

388m
22/6466INCOMPLETED APPLICATION3 Nov 2022

Permission is sought for Island Stability Services Limited are applying for a 10 year planning permission to develop a low carbon inertia services (LCIA) grid support facility, which will connect to the adjoining ESB Knockraha 220kV Electricity Substation. The proposed development will have a projected life span of 50 years. The development is to be located within a site compound c. 2.2 ha and will consist of the following elements: the development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator flywheel (c.512m2 c.12m high); customer substation (c.250m2 c.7m high) and TSO substation (c.375m2 c.9m high), cooling equipment, 6 no. modular containers to house electrical and control equipment, generator step-up transformer, auxiliary transformer and electrical plant including and external circuit breaker; 1 no. firefighting water tank and pump, boundary fencing (c.3m high) and CCTV, connection to the neighbouring ESB Substation and all other ancillary site works including access roads.

Ballynanelagh Knockraha Co. Cork

388m
22/6869INCOMPLETED APPLICATION22 Dec 2022

Permission is sought for Island Stability Services Limited are applying for a 10 year planning permission to develop a low carbon inertia services (LCIA) grid support facility, which will connect to the adjoining ESB Knockraha 220kV Electricity Substation. The proposed development will have a projected life span of 50 years. The development is to be located within a site compound c. 2.2 ha and will consist of the following elements: The development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator and flywheel (c.512m2 c.12m high); Customer substation (c.250m2 c.7m high) and TSO substation (c.375m2 c.9m high), Cooling equipment, 6 No. modular containers to house electrical and control equipment, generator step-up transformer, auxiliary transformer and electrical plant including an external circuit breaker; 1 no. firefighting water tank and pump, boundary fencing (c.3m high) and CCTV, connection to the neighbouring ESB Substation and all other ancillary site works including access roads.

Ballynanelagh Knockraha Co. Cork

388m
24/5849INCOMPLETED APPLICATION3 Oct 2024

Permission for 1 no. enclosed battery energy storage system compound on a total of c. 2-hectare site, to include; 1 no. 110kV AIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 33/110kV transformer and 1 no. auxillary transformer, battery storage blocks on concrete support foundations with Power Conversion System (PCS) contained within 16 units. Planning permission application also includes access roads and a site entrance, all associated electrical cabling and ducting and associated works including gates, fencing and security. The proposed development will have a projected life span 35 years.

Ballynanelagh Knockraha Co.Cork

388m
23/4234REFUSED13 Feb 2023

Permission is sought for Island Stability Services Limited are applying for a 10 year planning permission to develop a low carbon inertia services (LCIA) grid support facility, which will connect to the adjoining ESB Knockraha 220kV Electricity Substation. The proposed development will have a projected life span of 50 years. The development is to be located within a site compound c. 2.2 ha and will consist of the following elements: The development and operation of a 150 to 500 MVA (electrical rating) synchronous condenser. Compound building housing synchronous condenser generator and flywheel (c.512m2 c.12m high); Customer substation (c.250m2 c.7m high) and TSO substation (c.375m2 c.9m high), Cooling equipment, 6 No. modular containers to house electrical and control equipment, generator step-up transformer, auxiliary transformer and electrical plant including an external circuit breaker; 1 no. firefighting water tank and pump, boundary fencing (c.3m high) and CCTV, connection to the neighbouring ESB Substation and all other ancillary site works including access roads.

Ballynanelagh Knockraha Co. Cork

388m
24/6103INCOMPLETED APPLICATION6 Nov 2024

Permission for 1 no. enclosed battery energy storage system compound on a total of c. 2 hectare site, to include: Battery storage blocks on concrete support foundations with Power Conversion Systems (PCS) contained within 16 units, 1 no. 110 kV AIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 33/110 kV transformer and 1 no. auxiliary transformers, construction compound, firewater reservoir, store room, welfare unit, dam along the northern boundary, a retention basin, soakage swale and a diesel backup generator. Planning permission application also includes access roads and a site entrance, all associated electrical cabling and ducting and associated works including gates, fencing and security. The proposed development will have a projected life span of 35 years.

Ballynanelagh Knockraha Co Cork

389m
25/4155Application Withdrawn7 Feb 2025

Permission for 1) 1no. enclosed battery energy storage system compound on a total of c. 2-hectare site, to include; battery storage blocks on concrete support foundations with power conversion systems (PCS) contained within 16 units, 1 no. 110 kV AIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 33/110kV transformer and 1no. auxiliary transformers, construction compound, fire water reservoir, store room, welfare unit, dam along the northern boundary, a retention basin, soakage swale, and a diesal back up generator. Planning permission application also includes access roads and a site entrance, all associated electrical cabling and ducting and associated works including gates, fencing and security. The proposed development will have a projected life span of 35 years

Ballynanelagh Knockraha Co. Cork

412m
09/7105INCOMPLETED APPLICATION21 Sept 2009

Two storey dwellinghouse, treatment plant and new entrance

Killeena Knockraha

439m
13/5378CONDITIONAL17 Jul 2013

Construction of a new single storey extension to north-west façade and alterations to existing facades of existing part 1.5 storey-part single storey detached dwelling. The development will also include the demolition of part of the existing single storey dwelling and the addition of a new velux rooflight to the south-east roof

Cariad Killeena Knockraha

439m
21/4712CONDITIONAL22 Mar 2021

1) The construction of a single storey extension to an existing dwelling, 2) A new vehicular access to the site from the public road and to block up the existing access off a right-of-way laneway, 3) Permission for retention of elevational alterations to the existing dwelling, 4) Permission for retention of a detached domestic use garage on the site.

Cariad Killeena Knockraha Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?