← Back to search

Oaklands Gully Bandon Co. Cork

INCOMPLETED APPLICATION

Planning application 21/4912

Cork - Cork County Council

Proposed Development

The construction of a two storey dwelling house, waste water treatment system and all associated site works. The site is within the grounds of Oaklands house, which is a protected structure.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Apr 2021

  2. Decision due

    3 Jun 2021

Application Details

Location
Oaklands Gully Bandon Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
9 April 2021
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
3 June 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
21/5285REFUSED12 May 2021

The construction of a two storey dwelling house, waste water treatment system and all associated site works. The site is within the grounds of Oaklands house, which is a protected structure.

Oaklands Gully Bandon Co. Cork

3m
23/5780CONDITIONAL1 Sept 2023

Permission for the construction of a two storey dwelling house, waste water treatment system and all associated site works. The site is within the grounds of Oaklands House, which is a Protected Structure.

Oaklands Gully Bandon Co Cork

39m
23/5781CONDITIONAL1 Sept 2023

The construction of a two storey dwelling house, waste water treatment system and all associated site works. The site is within the grounds of Oaklands House, which is a Protected Structure.

Oaklands Gully Bandon Co Cork

41m
21/5290REFUSED12 May 2021

The construction of a two storey dwelling house, waste water treatment system and all associated site works. The site is within the grounds of Oaklands house, which is a protected structure.

Oaklands Gully Bandon Co. Cork

41m
21/4913INCOMPLETED APPLICATION9 Apr 2021

The construction of a two storey dwelling house, waste water treatment system and all associated site works. The site is within the grounds of Oaklands house, which is a protected structure.

Oaklands Gully Bandon Co. Cork

99m
21/5565CONDITIONAL4 Jun 2021

Permission for a residential development. The proposed development includes the construction of 20 no. dwellings comprising 2 no. two bedroom semi-detached units, 16 no. three bedroom semi-detached units, and 2 no four bedroom detached units. The proposed development will be accessed from the existing Castleoaks development and the proposal includes for the part demolition of an existing wall to create a site access. The proposal also includes for open space, landscaping, boundary treatments, solar panels and all necessary site services and ancillary works to facilitate the development.

Gully Bandon Co. Cork

100m
25/5072Refused5 Jun 2025

Permission for the construction of 22 no. residential units, comprising 8 no. 3-bedroom terraced houses, 2 no. 2-bedroom terraced houses, 6 no. 2-bedroom duplex apartments, and 6 no. 3-bedroom duplex apartments. The development also includes the part demolition of an existing wall, access arrangements, boundary treatments, and all associated landscaping and ancillary site development works

Gully Bandon Co.Cork

100m
25/4682INCOMPLETED APPLICATION14 Apr 2025

Permission for the construction of 22 no. residential units, comprising of 8 No. 3 bedroom terraced houses, 2 no. 2 bedroom terraced houses, 6 no. 2 bedroom duplex apartments and 6 no. 3 bedroom duplex apartments. Part demolition of an existing wall, access arrangements, boundary treatments and all associated landscaping and ancillary site development works.

Gully Bandon Co Cork

101m
14/4910CONDITIONAL2 May 2014

Construction of 14no. semi-detached, two-storey dwelling units and all associated site works

Castleoaks Gully Bandon Co.Cork

112m
19/5238CONDITIONAL16 May 2019

The construction of first floor extension to side of dwellinghouse, internal re-ordering and relocation of bathroom window to rear elevation to accommodate same and all associated site works

9 The Grove Wetherton Gully Bandon, Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?
Oaklands Gully Bandon Co. Cork - Planning Application 21/4912 | Permission.ie