Rossmore Carrigtwohill Co. Cork

CONDITIONAL

Planning application 21/5323

Cork - Cork County Council

Proposed Development

The demolition of 3 no. structures consisting of 2 no. uninhabitable dwellings (50m.sq. and 150m.sq.) and an associated outbuilding (400m.sq.) within an application area of 0.4 hectares.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 May 2021

  2. Decision due

    1 Mar 2022

  3. Decision: CONDITIONAL

    1 Mar 2022

  4. Grant issued

    8 Apr 2022

Application Details

Location
Rossmore Carrigtwohill Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
17 May 2021Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
1 March 2022
Grant Date
8 April 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

135m
03/4041CONDITIONAL13 Aug 2003

Dwelling

ROSSMORE, ROSSMORE,

277m
05/3032CONDITIONAL6 May 2005

Domestic workshop with attic space to rear of existing dwellinghouse

Rossmore Carrigtwohill

279m
09/7675INCOMPLETED APPLICATION18 Nov 2009

Retention of alterations to extension to dwelling

Rossmore Carrigtwohill

428m
08/10142CONDITIONAL16 Dec 2008

Sunroom extension to rear of dwelling, domestic garage, removal of existing septic tank & installation of proprietary treatment system

Ballintubbrid West Carrigtwohill

569m
09/7460CONDITIONAL27 Oct 2009

Change of house & garage design from that granted under planning ref.no. 06/13903 & installation of septic tank, percolation area, new site entrance & associated site works

Ballintubbrid West Carrigtwohill

569m
06/13903CONDITIONAL22 Dec 2006

Dwellinghouse and garage

Ballintubbrid West Carrigtwohill

689m
21/5511INCOMPLETED APPLICATION31 May 2021

An increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under Planning Reg. Nos. 18/06874, 19/5050 and 20/04589), from 100 no. days per annum to 150 no. days per annum, within an application area of 1.605 Hectares. The proposed development will not result in any change in current output rates.

Rossmore Carrigtwohill Co. Cork

689m
20/4589CONDITIONAL20 Mar 2020

The development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref’s 18/06874 and 19/5050), from 60 no. days per annum to 100 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.

Rossmore Carrigtwohill Co. Cork

749m
07/12259CONDITIONAL9 Nov 2007

Two storey dwellinghouse, garage and installation of septic tank

Ballintubbrid West Carrigtwohill

863m
16/6545CONDITIONAL13 Oct 2016

Resurfacing of existing silage slab, material change of use of straw storage shed to dairy, pump house & loose house and material change of use of existing animal house to milking parlour, holding yard, drafting area & loose house complete with all associated works

Barryscourt Carrigtwohill Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?