Lackareagh Lissarda Co. Cork

CONDITIONAL

Planning application 21/5620

Cork - Cork County Council

Proposed Development

  1. a)
    Construction of a livestock shed consisting of cubicles, straw bedded area, flow channels and underground slatted tanks
  2. b)
    Modifications and extension to existing unroofed yard to include handling facilities and post milking yard and all associated site works.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Jun 2021

  2. Decision: CONDITIONAL

    3 Aug 2021

  3. Decision due

    5 Aug 2021

  4. Grant issued

    7 Sept 2021

Application Details

Location
Lackareagh Lissarda Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
11 June 2021Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
3 August 2021
Grant Date
7 September 2021

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

653m
04/6264WITHDRAWN16 Aug 2004

Construction of 110 kV electrical substation and 110 kV switch station including control buildings

Garranereagh Lissarda

674m
14/6760Conditional Permission23 Dec 2014

The construction of six wind turbines, with a maximum tip height of up to 131m and associated turbine foundations and hardstanding areas, 1 no. permanent meteorological mast up to 90m in height, upgrade of existing and provision of new site tracks and associated drainage, new access junction and improvements to public road to facilitate turbine delivery, 1 no. borrow pit, underground electrical and communications cables, permanent signage and other associated ancillary infrastructure. This application is intended to replace the development already granted permission under PL04.219620 (05/5907) and subsequently extended under 11/6605. This application is seeking a 10-year planning permission. An Environmental Impact Statement and AA Screening Report have been prepared in respect of the planning application.

Lackareagh and Garranereagh Lissarda and Barnadivane (Kneeves) Teerelton Co Cork

682m
05/7724CONDITIONAL21 Oct 2005

Demolition of dwelling house and construction of dwellinghouse, installation of a small treatment plant and associated site works

Garranereagh Lissarda

719m
07/7744CONDITIONAL11 May 2007

Demolition of dwellinghouse and construction of dwellinghouse

Garranereagh Lissarda

731m
08/7843CONDITIONAL11 Jul 2008

Construction of building comprising of bio-gas dry fermentation facility, walled silage storage slab, effluent tanks and associated site works

Garranereagh Lissarda

781m
03/131CONDITIONAL17 Jan 2003

52.5 metre meteorological mast

BARNADIVANE (KNEEVES), BARNADIVANE (KNEEVES),

781m
05/7226CONDITIONAL4 Oct 2005

Retention of 1 no. temporary 52.5m meteorological mast

Barnadivane Terelton Macroom

785m
03/2047CONDITIONAL1 May 2003

Wind farm to include 5 no. turbines, control housing and electrical compound anemometer mast, anemometer, service roadways & assoc. works

GARRANEREAGH, GARRANEREAGH,

785m
08/9783UNCONDITIONAL19 Nov 2008

Completion of wind farm to include 5 no. turbines, control housing and electrical compound, anemometer mast, anemometer, service roadways and associated works granted under Pl. Reg. No. 03/2047 (new permission to expire on 01/11/2011)

Garranereagh Lissardagh

785m
10/5711CONDITIONAL9 Jul 2010

Construction of a wind farm development comprising of 4 wind turbines with a hub height of up to 80m with blade length of 41m, site roads, hardstands, upgrading of site entrance and associated ancillary works. This application will replace a previous planning permission for a wind farm permitted under planning reg. no. 03/2047 and extended under planning reg. no. 08/9783. (This development requires an EIS and the EIS has been submitted with the application).