Proposed Development
Permission for retention of single storey stable building and open sided storage shed both for recreational use and all associated site works.
Application Timeline
Application received
28 Jun 2021
Decision: CONDITIONAL
19 Oct 2021
Decision due
26 Oct 2021
Grant issued
23 Nov 2021
Application Details
- Location
- Sleaveen East Macroom Co. Cork
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 28 June 2021Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 19 October 2021
- Grant Date
- 23 November 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwelling
Sleaveen East Macroom Co.Cork
Dwelling
Sleaveen East Macroom
Construction of 2 number commercial units consisting of: meat storage/processing building incorporating stores, freezer room, cutting room, loading area, demo room, W.C’s, administration and offices, car-parking together with all ancillary site works.
Coolcower Industrial Estate Coolcower Macroom Co. Cork
Conversion of vehicle storage and car sales building to form a new vehicle showroom display area, with walls, roofing, glazing, additional extension of service facilities to include hand over canopies, additional customer parking and external display of used vehicles, re-cladding of existing petrol forecourt shop to match new development and erection of new boundary walls and footways to forecourt area of site and demolition of derelict bungalow
Coolcour Macroom
Construction of cleaning canopy and valeting building
Coolcour Macroom
Factory building with offices and dispatch area to manufacture timber framed buildings including site develoment works, services and construction of access road
Coolcour Macroom
Dwellinghouse
Ummera Macroom
Dwelling and Septic Tank
Sleaveen East Macroom Co Cork
Construction of Dormer Bungalow and Septic Tank
Sleaveen East Macroom Co. Cork.
Upgrade works at the wastewater treatment plant which will consist of 1. Construction of a new storm overflow and flow splitting chamber, inlet works including grit removal system and full flow to treatment pumping station, 2 no. new integrated fixed-film activated sludge reactor tanks (Aeration Tanks), 2 no. final settlement tanks, final water sampling manhole while retaining the existing outfall to the River Sullane, return and waste activated sludge pumping stations, chemical building including lime and ferric sulphate dosing systems with bunded chemical storage tanks, 1no. storm water storage tank equipped with storm water pumps, 1 no. sludge picket fence thickener, odour control system, a sheet pile flood protection wall within the site boundary, boundary treatments include a weld mesh security fence, new internal access road and public lighting. 2. Construction of a new control and administration building. 3.Decommissioning of the existing wastewater treatment plant, equipment and associated structures as part of the upgrade works. 4. Construction of a 42 kWp photovoltaic (PV) solar panels on ground mounted frames on the north western area of the site. The PV panel shall be used to supplement the energy demands of the proposed WwTP and will be arranged with a panel area of 185sqm approximately. 5. Establishment of a designated area to be utilized by Cork County Council Roads Department and construction of a new entrance point. 6. All associated site development works above and below ground. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.
Wastewater Treatment Plant (WwTP) Macroom Sleveen East Co. Cork