'Monterey' Bearforest Lower Mallow Co. Cork
CONDITIONALPlanning application 21/5905
Cork - Cork County Council
Proposed Development
Permission for retention for the as built dwelling house and attached garage.
View the full application file on the council's planning portal →Application Timeline
Application received
8 Jul 2021
Decision: CONDITIONAL
28 Sept 2021
Decision due
29 Sept 2021
Grant issued
2 Nov 2021
Application Details
- Location
- 'Monterey' Bearforest Lower Mallow Co. Cork
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 8 July 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 28 September 2021
- Grant Date
- 2 November 2021
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission to (A) Construct a 2 storey extension to the front of the existing dwelling which will contain an entrance lobby and an extension of an existing bedroom. (B) Construct a dining room extension to the side of the dwelling. (C) Convert the existing garage to playroom. (D) Construction of a new pitched roof over the existing garage/utility area to replace the existing flat roof. (E) Install external insulation and render finish. (F) Carry out alterations to the existing façade and all associated site works.
Bearforest Lower Mallow Co. Cork
Pemission for construction of 5 no. dwelling houses and associated site works. It is also proposed to construct an access road to the development which is to connect to the development under Planning No. PD 55,050/08
Bearforest Lower Mallow Co. Cork.
Permission for construction of 5 no. two storey dwelling houses and associated works. It is also proposed to construct an access road to the development which is to connect to the development under planning No. PD55,050/08.
Bearforest Lower Mallow Co. Cork.
construction of 16 no. two-storey dwelling houses, entrance road and associatedd works
Bearforest Lower Mallow Co. Cork.
Construction for 13 no. two storey dwelling houses ans associated works. Is is also proposed to construct an access road to the development which is to connect to the development under planning no. PD55022/05
Bearforest Lower Mallow Co Cork
construction of 7 no. two storey dwelling houses and associated works. It is also proposed to construct an access road to the development which is to connect to the development under Planning Reference P.D. 55,022/05
Bearforest Lower Mallow Co. Cork.
change of house design and layout of site to ref. no. P.D. 55,055/06 for 12 no. 2 storey semi-detached dwellings in accordance with plans and documents submitted
Cortigan Bearforest Lower Td., Mallow Co. Cork.
The construction of 9no. two storey dwelling houses and all ancillary site works. The proposed development consists of the construction of 4no. 5 bedroom semi-detached dwelling houses, 2no. 4 bedroom semi-detached dwelling houses, 2no. 4 bedroom detached dwelling houses and 1no. 5 bedroom detached dwelling house. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.
Cortigan Bearforest Lower Mallow Co. Cork
change of plans of layout to ref. P.D. 55,010/04 for (a) 1 no. 2 storey lodge, (b) 1 no. 2 storey terrace dwellings (c) 6 no. 2 storey semi-detached (d) 1 no. 2 storey detached (e) 1 no. 2 storey detached dwelling, front entrance gates and ancillary site works
Cortigan Bearforest Mallow
change of house type site layout and no. of houses to construct 6 no. paris (i.e. 12 no.) semi-detached houses on part of the site on which permission has been granted under planning ref. P.D. 55,022/05
Cortigan Bearforest Lower Mallow Co. Cork.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?