Proposed Development

The development consists of a 10 year planning permission for development consisting of an extension to and modifications to a permitted pharmaceutical manufacturing building IE2B, the development will consist of

  1. a)
    a three-storey extension (gross floor area approx. 1,520sq.m. and approx. 27.5m high to parapet) with intermediate access platforms, at the western side of building IE2B, with external ground-mounted plant and equipment, roof stacks, roof-mounted plant and equipment and acoustic screening
  2. b)
    associated external revisions to the permitted IE2B building including elevational modifications and revisions to roof plan, roof stacks, plant and equipment
  3. c)
    provision of additional storage vessels (3 No.) in existing bunded bulk solvent storage tank farm to the east of the IE2 building
  4. d)
    provision of additional bunded waste vessels (2 No.) beside the existing bunded waste solvent tank farm to south of IE4 building
  5. e)
    provision of additional tanks on southern side of IE2B building (6 No. bunded tanks and 2 No. underground tanks)
  6. f)
    an extension to an on-site berm (permitted under Pl. Reg. Ref. 16/6558) at the south east of the overall complex
  7. g)
    revisions to internal access road layout on the western side of the proposed extension
  8. h)
    revisions to the permitted surface water drainage layout and attenuation systems for IE2B and proposed extension to comprise of new underground attenuation tank;
  9. i)
    all ancillary site works including modifications to underground services, pipe bridges, lighting, hard surfaced areas and all ground works. The development is for the purposes of an activity which requires an Industrial Emissions (IE) License under Part V of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act 2003). The current IE Licence (P0009-04) attached to the site will be reviewed for the purposes of the proposed development .The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies. An Environmental Impact Assessment Report will be submitted to the Planning Authority with the planning application.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    15 Oct 2021

  2. Decision: CONDITIONAL

    8 Dec 2021

  3. Decision due

    9 Dec 2021

  4. Grant issued

    20 Jan 2022

Application Details

Location
Eli Lilly pharmaceutical complex, at Ballythomas East, Ballythomas West, Horsehill More North, Ballyvrin Lower, Dunderrow Kinsale, Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
15 October 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 December 2021
Grant Date
20 January 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

24m
15/6380CONDITIONAL23 Oct 2015

(1) Demolition of existing temporary offices, (2) construction of an extension to IE2 production building on two floors of total area 800sq.m., and (3) all associated site works

Ballythomas East, Ballythomas West Horsehill More Dunderrow Kinsale

24m
15/5347INCOMPLETED APPLICATION23 Jun 2015

(1) New IE27 warehouse building of 302sqm gross floor area, overall height not exceeding 6.1m above existing ground level. (2) Extension to the existing IE02 building entrance which comprises of (a) Demolition of 7.7sqm of existing entrance, (b) Construction of 21.9sqm of new entrance overall height not exceeding 4.65 m, resulting in a net gain of 14.2sqm floor area. (3) all associated site development works

Ballythomas East Ballythomas West Horsehill More, Dunderrow Kinsale, Co.Cork

24m
17/4071CONDITIONAL17 Jan 2017

The development will consist of the following works at the existing IE08 production building: (1) Demolition of (a) an existing single-storey section (gross floor space 26.9m2) of the building, (b) of an existing storage room at first floor level (gross floor space 11.6sqm) and (c) of an existing single-storey drum heating shed (gross floor space 25.9sqm) adjacent to the south of the building (total area for demolition is 64.4sqm); (2) The construction of (a) a new single storey extension of gross floor space 78m2 and height not exceeding 4.9m and (b) a new three storey extension of gross floor space 250.2m2 and total height not exceeding 15.8m, to be constructed in 2 phases (total new floorspace is 328.2sqm); (3) The provision of a new internal lobby (gross floor space 34sqm) including alterations to the existing western elevation to provide a new entrance; (4) All associated internal modifications to facilitate the 2 no. new extensions and the new internal lobby; and (5) All associated site development works.

Ballythomas East, Ballythomas West, Horsehill More Dunderrow Kinsale Co.Cork

24m
15/5481CONDITIONAL6 Jul 2015

(1) A new IE27 warehouse building of 302msq gross floor area, overall height not exceeding 6.1m above existing ground level. (2) Extension to the existing IE02 building entrance which comprises of (a) demolition 7.7msq of existing entrance and (b) construction of 21.9msq of new entrance overall height not exceeding 4.65m, resulting in a net gain of 14.2msq floor area. (3)All associated site development works

Ballythomas East, Ballythomas West Horsehill More, Dunderrow Kinsale Co. Cork

24m
14/5747CONDITIONAL15 Aug 2014

The development will consist of the following: (1) A new IE15C warehouse building of 276m2 gross floor area, overall height not exceeding 7.1m above existing ground level (2) All associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an Establishment to which the Major Accidents Directive applies.

Ballythomas East, Ballythomas West Horsehill More, Dunderrow Kinsale, Co Cork

26m
18/4644INCOMPLETED APPLICATION16 Mar 2018

For the following works at the existing IE09C administration building: (1) Construction of a new single storey extension of gross floor area 92.78m2: (2) All associated internal modifications to facilitate the new extension and (3) All associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an establishment to which the Major Accidents Directive applies.

Ballythomas East, Ballythomas West Horsehill More North Dunderrow, Kinsale Co. Cork

26m
18/4901UNCONDITIONAL12 Apr 2018

The following works at the existing IE09C administration building: (1) Construction of a new single storey extension of gross floor area 92.78m2: (2) All associated internal modifications to facilitate the new extension and (3) All associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an establishment to which the Major Accidents Directive applies.

Ballythomas East, Ballythomas West Horsehill More North and Ballyvrin Lower Dunderrow Kinsale, Co. Cork

27m
14/5971INCOMPLETED APPLICATION15 Sept 2014

Demolition of existing idled IE3 production building and ancillary plant & equipment

Ballythomas East, Ballythomas West Horsehill More Dunderrow, Kinsale Co.Cork

27m
18/6137CONDITIONAL14 Aug 2018

The development will consist of: (1) The construction of a two storey building (IE40) for staff services and facilities including canteen, kitchen, gym, studio, changing facilities, offices, meeting rooms and administration areas with roof top plant enclosures, (2) Extension to the existing staff car park to provide an additional 150 permanent car parking spaces, (3) The creation of a new vehicular car park entrance gate on the Ballyvrin Road (L3215) northern boundary road, (4) All associated site development works including modifications to the internal site roads and site services, construction of external hard standing and landscaped areas and a single storey ancillary kitchen store, site lighting and fencing, 3 no. flagpoles and associated signage and the formation of landscaped areas, including berms and visual screening with tree planting and contractor’s temporary car park. The site currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site which the Chemicals Act (Control of Major Accident Hazards Involving dangerous Substances) Regulations 2015 (S.I 209 of 2015) applies.

Ballythomas East, Ballythomas West Horsehill More North, Ballyvrin Lower Dunderrow Kinsale, Co. Cork

27m
18/5889INCOMPLETED APPLICATION18 Jul 2018

(1) The construction of a two storey site services building IE40 with roof top plant enclosures. (2) Extension to the existing staff car park to provide an additional 150 permanent car parking spaces, (3) The creation of a new vehicular car park entrance gate on the Ballyvrin Road (L3215) northern boundary. (4) All associated site development works including modifications to the internal site roads and site services, construction of external hard standing areas and a single ancillary kitchen store, site lighting and fencing and the formation of landscaping areas, including berms and visual screening with tree planting and contractor’s temporary car park. The new development is on a site to which the Chemicals Act (Control of Major Accident Hazards Involving dangerous Substances) regulations 2015 (S.I 209 of 2015) applies.

Ballythomas East, Ballythomas West Horsehill More North, Ballyvrin Lower Dunderrow, Kinsale Co. Cork