Proposed Development
Construct a two storey family dwelling, to install a waste water treatment plant and all associated site works
Application Timeline
Application received
9 Dec 2021
Decision due
11 Feb 2022
Application Details
- Location
- Shanaway Ballineen Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 9 December 2021
- Status
- WITHDRAWN
- Decision
- Pending
- Decision Due
- 11 February 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construct a dwelling house, garage and all associated site works
Shanaway East Ballineen Co. Cork
Construction of sunroom extension to dwellinghouse
Shanaway East Ballineen
Construct 2 soiled water tanks and all associated site works
Shanaway East Ballineen
Construct two soiled water tanks and all associated site works
Shanaway East Ballineen
Construct soiled water tank, install new concrete perimeter wall to existing silage base and resurface same and all associated site works
Shanaway East Ballineen
Construct soiled water tank, install new concrete perimeter wall to existing silage base and resurface same and all associated site works
Shanaway East Ballineen
Construct (a) cattle house with slatted slurry tank, (b) extension to existing cattle house with slatted slurry tank, (c) install canopy roof vent in existing cattle house, (d) extend existing silage slab and construct silo walls to silage slab, (e) construct walled silo, (f) 2no. concrete aprons and associated site works
Shanaway Middle Ballineen
Cattle house, slatted slurry tank and concreted cow path
Shanaway Middle Ballineen
Retention of dwellinghouse and associated site works
Shanaway East Ballineen
Dwellinghouse, installation of small treatment plant and associated site works
Shanaway East Ballineen
The submission window has closed
Observations on this application closed on Friday 21 January 2022, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?