← Back to search

Dromanallig Ballingeary Co.Cork

CONDITIONAL

Planning application 22/4205

Cork - Cork County Council

Proposed Development

Permission for change of use of dwelling house to Museum/Community hall, for alterations to fenestration and elevations of same and for construction of new accessible street access ramp and steps

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Feb 2022

  2. Decision due

    30 Mar 2022

  3. Decision: CONDITIONAL

    31 Mar 2022

  4. Grant issued

    19 May 2022

Application Details

Location
Dromanallig Ballingeary Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
3 February 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
31 March 2022
Grant Date
19 May 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

19m
06/5109CONDITIONAL27 Feb 2006

Alterations and extension to church

Dromanallig Ballingeary

28m
26/0484Grant with Conditions27 Feb 2026

Refurbishment of an existing two-storey commercial building to provide approximately 90m² of commercial floor space, together with the change of use of part of this building to residential use to provide a two-storey, four-bedroom dwelling. Demolition of an existing two-storey storage building and lean-to structures. Construction of 2 no. two-storey semi-detached dwellings. Provision of car parking, bicycle parking, and all associated site works and connections to existing services.

DROM AN AILIGH, Béal Átha an Ghaorthaidh (Ballingeary), Co. Cork, P12Y015

28m
25/6945Prepare Invalid Letter22 Dec 2025

Refurbishment of an existing two-storey commercial building to provide approximately 90m² of commercial floor space, together with the change of use of part of this building to residential use to provide a two-storey, four-bedroom dwelling. Demolition of an existing two-storey storage building and lean-to structures. Construction of 2 no. two-storey semi-detached dwellings. Provision of car parking, bicycle parking, and all associated site works and connections to existing services.

DROM AN AILIGH, Béal Átha an Ghaorthaidh (Ballingeary), Co. Cork, P12Y015

47m
19/4748CONDITIONAL27 Mar 2019

To increase the finished floor level height and roof and ridge height to existing dwellinghouse which will include alterations to front and rear elevations to the existing dwellinghouse along with all associated site works.

Dromanallig Ballingeary Co. Cork

53m
04/7526INCOMPLETED APPLICATION5 Oct 2004

Dwellinghouse

Droumanallig Ballingeary

53m
05/4263CONDITIONAL17 Jun 2005

Dwellinghouse

Dromanallig Ballingeary

55m
10/4238CONDITIONAL9 Feb 2010

Demolition of existing dwelling and construction of dwelling

Dromanallig Ballingeary Macroom

58m
10/4235CONDITIONAL9 Feb 2010

Alterations to include raising of ground floor level by one metre and revise elevations to existing dwelling

Dromanallig Ballingeary Macroom

105m
22/5321CONDITIONAL8 Jun 2022

Cead do na nithe seo a leanas: 1. Scartáil foirgnimh scoite / sean-uachtarlann, 2. Tógáil foirgnimh scoite nua ag cuimsiú (i) giomnáisiam agus (ii) láthair stórála le haghaidh trealaimh agus innealra do pháirc imeartha an Chumainn, 3. Oibreacha láithreáin bhreise lena n-áirítear láthair pháirceála agus balla agus geataí iontrála nua. - Permission for: 1. Demolition of detached building / old creamery, 2. Construction of new detached replacement building comprising (i) gymnasium and (ii) storage area for equipment and machinery for the G.A.A playing field, 3. Associated site works including car parking and new entrance walls and gates.

An gCill Mhór, Kilmore Béal Átha'n Ghaorthaidh Ballingeary, Co. Chorcaí

105m
21/6248CONDITIONAL13 Aug 2021

Cead do na nithe seo a leanas: 1. Scartáil foirgnimh scoite / sean-uachtarlann, 2. Tógáil foirgnimh scoite nua ag cuimsiú (i) giomnáisiam agus (ii) láthair stórála le haghaidh trealaimh agus innealra do pháirc imeartha an Chumainn, 3. Oibreacha láithreáin bhreise lena n-áirítear láthair pháirceála agus balla agus geataí iontrála nua. - Permission for: 1. Demolition of detached building / old creamery, 2. Construction of new detached replacement building comprising (i) gymnasium and (ii) storage area for equipment and machinery for the G.A.A playing field, 3. Associated site works including car parking and new entrance walls and gates.

an gCill Mhór Béal Átha'n Ghaorthaidh Co. Chorcaí Kilmore, Ballingeary

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?