← Back to search

77 Thomas Davis Street Mallow Co Cork

INCOMPLETED APPLICATION

Planning application 22/4525

Cork - Cork County Council

Proposed Development

Reconstruction and alterations of an existing mid terraced derelict building; with the works comprising of a ground floor commercial unit and a 1 bedroom apartment to the rear ground floor along with a 3 bedroom duplex apartment set out over the first and second floors and associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Mar 2022

  2. Decision due

    4 May 2022

Application Details

Location
77 Thomas Davis Street Mallow Co Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
10 March 2022
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
4 May 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22/4806CONDITIONAL11 Apr 2022

Permission for the re-construction and alterations of an existing mid terraced derelict building; with the works comprising of a ground floor retail unit and 2 no residential units ( 1 no. 1 bedroom apartment to the rear ground floor along with 1 no. 3 bedroom duplex apartment set out over the 1st and 2nd floors), Partial demolition of rear side section to allow for new 1st floor rear balcony and provision of bin store along with associated site works

77 Thomas Davis Street Mallow Co.Cork

8m
05/55011CONDITIONAL18 Feb 2005

Construction of a building to comprise of (a) commercial unit on the ground floor (b) a one bedroomed apartment on the first floor (c) a one bedroomed apartment on the second floor and (d) reuse existing connection to all services

No. 78 Main Street, Mallow, Co. Cork.

37m
08/55054CONDITIONAL23 Jul 2008

for the demolition of existing premises and the construction of a three storey development consisting of one retail unit on ground floor, one bedroom apartment on first floor and a one bedroom apartment on second floor

No. 102 Davis Street Mallow Co. Cork.

41m
18/4487CONDITIONAL26 Feb 2018

Change of use from retail to sit down restaurant and retention of alterations to front and rear elevations

No. 103/104 Davis Street Mallow Co. Cork

46m
06/55082CONDITIONAL20 Nov 2006

Permission for retention of basement to new building granted permission under planning ref 2570

Shambles Lane Mallow Co Cork

47m
18/4608CONDITIONAL13 Mar 2018

Permission for change of use from an existing disused retail unit to a new café. Development is for works to a protected structure, refurbishment and alterations to the interior and material alteration to the existing non period shopfront and all associated site work.

106 Main Street Mallow Co Cork

48m
17/5643WITHDRAWN29 Jun 2017

Change of use from an existing disused retail unit to a new café and bistro, development is for works to a protected structure, refurbishment and alterations to the interior and material alteration to the existing non period shopfront and all associated site works.

106 Main Street Mallow Co. Cork

48m
17/5364INCOMPLETED APPLICATION1 Jun 2017

Change of use from a retail unit to café and bistro, material alteration to existing non period shopfront and bistro and all associated site work.

106 Main Street Mallow Co.Cork

56m
23/4349CONDITIONAL28 Feb 2023

Alteration to rear elevation and extensions to same, alterations and extensions to 2 existing apartments at 1st & 2nd floor, No.5 Spa Square. Provision of 4 new apartments, 1 at first floor at No.3 and 1 at first floor and second floors of No. 4 Spa Square, 1 at 3rd floor No. 4 & 5 Spa Square, relocation of extract ducts from commercial units at ground floor along with associated site works.

3, 4 & 5 Spa Square Mallow Co Cork

57m
06/55024CONDITIONAL28 Mar 2006

change of use of existing ground floor residential area for use as a self contained retail unit, alterations to the existing facade namely the breaking out of an existing window to allow for a shopfront incorporating a signage canopy, pillasters and disabled access door

5 Spa Square Mallow Co. Cork.

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?