← Back to search

No. 24 Harbour Heights Ballynacubby Kinsale Co. Cork

UNCONDITIONAL

Planning application 22/4895

Cork - Cork County Council

Proposed Development

The construction of an extension of the living space to the west and south of the above dwelling house, some internal modification and associated infrastructure.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Apr 2022

  2. Decision: UNCONDITIONAL

    7 Jun 2022

  3. Decision due

    14 Jun 2022

  4. Grant issued

    20 Sept 2022

Application Details

Location
No. 24 Harbour Heights Ballynacubby Kinsale Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
20 April 2022
Status
APPLICATION FINALISED
Decision
UNCONDITIONAL
Decision Date
7 June 2022
Grant Date
20 September 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22/4652INCOMPLETED APPLICATION25 Mar 2022

The construction of an extension of the living space to the west and south of the above property, some internal modification and associated infrastructure.

No. 24 Harbour Heights Ballynacubby Kinsale Co. Cork

20m
16/5695CONDITIONAL7 Jul 2016

Demolition of existing single storey side garage extension, partial demolition of eastern end of existing house and demolition of existing rear balcony, minor material alterations to existing elevations and refurbishment of existing dwelling, construction of new basement and construction of a new single storey side extension, new entrance porch, new rear balcony and all associated site works.

Harbour Heights Ballynacubby Kinsale Co. Cork

20m
08/9729CONDITIONAL18 Nov 2008

Retention of change of use from garage/store to habitable space and minor elevational changes to front and rear of dwelling

Harbour Heights Ballynacubby Kinsale

20m
12/5076CONDITIONAL23 May 2012

extension to side of existing dwelling house, including construction of pitched roof over existing flat roof to match existing dwelling, raising of portion of existing finished floor level to match the rest of the existing dwelling, changes to existing front and rear elevations and the installation of velux style windows in the roof of the proposed extension and existing dwelling and all associated site works

Harbour Heights Ballynacubby Kinsale Co. Cork

55m
12/5213INCOMPLETED APPLICATION1 Jun 2012

Demolition of extension and garage to north of existing dwelling, construction of extensions to the south and north of the existing dwelling with associated site works

15 Harbour Heights Kinsale

78m
03/3361WITHDRAWN7 Jul 2003

Alterations and extension to dwellinghouse

20, HARBOUR HEIGHTS, BALLYNACUBBY RURAL,

78m
05/4705CONDITIONAL4 Jul 2005

Alterations and extension to dwellinghouse

20 Harbour Heights Ballynacubby Kinsale

84m
12/5317INCOMPLETED APPLICATION15 Jun 2012

Erection of detached garage, and the erection of extensions to the front and rear facades of an existing dwelling and to carry out all associated site works

Ballynacubby Kinsale Co. Cork

91m
11/6632CONDITIONAL19 Dec 2011

Demolition of part of dwelling house and construction of extension and alterations to dwelling house and associated site works

'Clarach' Harbour Heights Ballynacubby Kinsale

116m
22/4554CONDITIONAL11 Mar 2022

Permission for retention for 1) rear two storey flat roof extension, 2) single storey side bay window, 3) rear facing roof light, 4) second floor side window to existing dwelling. Permission for retention for 1) detached domestic garage with associated side access steps, 2) rear garden shed, 3) alterations to boundary walls including access door onto side lane, 4) construction of boundary wall with access door onto side lane with associated site works. Permission to demolish single storey store room.

19 River Meadows Ballynacubby Kinsale Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?