3 & 4 Railway Cottages (formerly Peg's Pub) Carrigaloe Donegal Cobh Co. Cork
CONDITIONALPlanning application 22/5870
Cork - Cork County Council
Proposed Development
Permission for retention of 2 no. dwellings (change of plan to that permitted under Pl.Reg.No. 17/6844).
Application Timeline
Application received
11 Aug 2022
Decision: CONDITIONAL
3 Oct 2022
Decision due
5 Oct 2022
Grant issued
15 Nov 2022
Application Details
- Location
- 3 & 4 Railway Cottages (formerly Peg's Pub) Carrigaloe Donegal Cobh Co. Cork
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 11 August 2022Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 3 October 2022
- Grant Date
- 15 November 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The demolition of ‘Summerlea Lodge’ (also known as ‘Summerlea House’, ‘Cluneveen’, or ‘Kilty House’) and adjacent outbuilding including associated site works.
Donegal (Townland) Carrigaloe Cobh Co. Cork
Site clearance and change of use of former bus depot to a mixed use development comprising 2 no. blocks ranging in height from three to four storeys consisting of 23 no. residential units (3 no. one bed apartments, 17 no. two bed apartments and 3 no. three bed townhouses), 121sqm retail unit at ground level, 19 no. car parking spaces and loading bay at ground level fronting the public road, 42 no. car parking spaces at sub-ground level (basement), access ramp to basement car park, hard and soft landscaping, bin stores and associated works and services including effluent treatment unit
Old Bus Depot Glenbrook Maulbaun Passage West
Site clearance & change of use of former bus depot to a residential development of 14no. three-storey terraced dwellings set out in 2no. blocks consisting of 10no. three-bed dwelings, 4no. two-bed dwellings, & 24no. surface car parking spaces fronting the public road. The development includes hard & soft landscaping, bin stores & all associated site works & services including effluent treatment unit.
Old Bus Depot Glenbrook Maulbaun Passage West
Site clearance & change of use of the dormer Bus Depot to a residential development of 14no. three-storey terraced dwellings set out in 2no. blocks consisting of 10no. three-bed dwellings & 4no. two-bed dwellings & 24no. surface carparking spaces fronting the public road. The development includes hard & soft landscaping, bin stores, & associated site works including effluent treatment unit
Old Bus Depot Maulbaun Glenbrook Passage West
Site clearance & change of use of former bus depot to a mixed use development comprising 2no. blocksranging in height from two to three storeys (excluding set back at roof level)consisting of 23no. residential units (3no. one bed apts, 17no. two bed apts, & 3no. three bed townhouses), 121sqm GFA retail unit at grade level, 19 no. car parking spaces & loading bay at grade level fronting the public road, 42no. car parking spaces at sub-grade level (basement). Development includes widening of existing public road, new footpaths on both sides of the public road, access ramp to basement car park, hard & soft landscaping, bin stores & all associated works including associated on-site services
Old Bus Depot Glenbrook Maulbaun Passage West
Change of use from existing bus depot to mixed use commercial/retail/residential development comprising of 2 no. blocks, Block A, five storey building consisting of ground and first floor offices and 5 no. apartments on second, third and fourth floors, Block B, a four storey building consisting of ground floor retail units, 2 no. gated covered parking areas for cars and bicycles, stores, service yards and ESB substation and 26 no. apartments on first, second and third floors with shared terrace at first floor level, construction of basement level car park, widening of existing street and construction of footpaths and amenity area
Glenbrook Maulbaun Passage West
Two storey dwellinghouse
Donegal Cobh
Two storey dwellinghouse
Donegal Cobh
Construct a one and a half storey dwelling, incorporating existing foundations constructed under planning permission ref: 07/6850, install a waste water treatment plant and carry out ancillary site works
Donegal Cobh Co Cork
The development of 26 no. residential units and all ancillary car parking, fencing and walls, cycle spaces, bin stores, landscaping and site development works. The proposed development includes the construction of 6 no. 2 storey terraced houses and 20 no. apartments over 3 storeys consisting of 10 no. duplex apartments with first floor terraces over 10 no. ground floor apartments. The proposed site development works includes the demolition of existing walls, the demolition and site clearance of the remnants of 2 no former outbuildings, and modifications to the existing vehicle access at Mariner’s View.