← Back to search

Kilmore Brinny Co. Cork

WITHDRAWN

Planning application 22/5979

Cork - Cork County Council

Proposed Development

Permission for retention of a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/repair of prefabricated modular buildings and associated site works.

View the full application file on the council's planning portal →

Application Details

Location
Kilmore Brinny Co. Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
31 August 2022
Status
WITHDRAWN
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22/5809INCOMPLETED APPLICATION2 Aug 2022

Permission for retention of a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/ repair of prefabricated modular buildings and associated site works

Kilmore Brinny Co.Cork

13m
23/5715Conditional Permission24 Aug 2023

Permission for retention of a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/repair of prefabricated modular buildings, c) continuance of use of the existing vehicular access from public road and associated site works.

Kilmore Brinny Co Cork

13m
23/5592INCOMPLETED APPLICATION4 Aug 2023

Permission for retention of; a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/repair of prefabricated modular buildings, c) continuance of use of the existing vehicular access from public road and associated site works

Kilmore Townland Brinny Co.Cork

105m
06/13758CONDITIONAL22 Dec 2006

Retention of substructure and completion of detached garage

Kilmore Innishannon

137m
04/2110CONDITIONAL31 Mar 2004

Ground and first floor extension to dwellinghouse

Saoirse Kilmore Innishannon

166m
26/1969Invalid - Prepare Letters23 Jul 2026

Permission for the construction of 3690msq purpose-built operational infrastructure, supporting essential civil engineering and utility services, including secure storage areas for plant, machinery, aggregates and other construction materials and tools required solely in connection with the applicant' s civil engineering and utility contracting business, a revised vehicular entrance, internal circulation areas, service yards and operational hard standing, associated surface water drainage infrastructure and all other ancillary site development works

Brinny, Innishannon, Co.Cork

206m
20/5942WITHDRAWN8 Sept 2020

The importation of soil & stone for the raising of an agricultural field/restoration of a quarry in order to improve the agricultural output of the field/quarry.

Kilmore Bandon Co. Cork

232m
24/5882INCOMPLETED APPLICATION7 Oct 2024

1) Permission for retention and continued use of the existing processing plant and related water management system, the existing concrete plant and ancillary buildings, site access and all related ancillary works/facilities (wheel wash, bunded fuel storage with hydrocarbon interceptor, weighbridge, etc.) permitted under Pl.Reg.No. S/02/1023), all for a duration of 10 years. 2) Permission for proposed development comprising recycling of c. 15,000 tonnes of concrete for use in concrete production, importation of 25,000 tonnes of sand & gravel for processing, importation of c. up to 20,000 tonnes of soil and stone per year (under Article 27) for phased site restoration with a revised phasing plan, and completion of restoration of the overall site to agricultural use. Permission is sought for eight years plus two years for final restoration, total of 10 years. All within an application area of c. 21.4 hectares.

Kilmore Brinny Co Cork

232m
24/6269Conditional Permission29 Nov 2024

Permission for retention and continued use of existing processing plant and related water management system, the existing concrete plant, ancillary buildings (site office 63 sq.m), 3 no. welfare portacabins (32 sq.m, 23.5s q.m & 22.0 sq.m), 4 no. storage buildings/containers (15 sq.m, 10 sq.m, 6 sq.m & 5 sq.m), 2 no. garages (76 sq.m & 76 sq.m), ESB Substation (26 sq.m), covered vehicle storage (220 sq.m), site access and all related ancillary facilities (wheelwash, fuel storage tank, weighbridge etc), permitted under Pl.Reg.No. S/02/1023), all for a duration of 10 years. 2) Permission for proposed development comprising removal of existing disused fuel storage tanks, recycling of c.15,000 tonnes of concrete for use in concrete production, importation of 25,000 tonnes of sand & gravel for processing, importation of c. up to 20,000 tonnes of soil and stone per year (under Article 27) for phased site restoration with a revised phasing plan and completion of restoration of the overall site to agricultural use. Permission is sought for eight years plus two years final restoration, total of 10 years. All within an application area of c.21.4 hectares.

Kilmore Brinny Co Cork

236m
19/4959REFUSED17 Apr 2019

Construction of a detached dwelling and a detached garage with store area, new vehicular site entrance, new biofiltration treatment unit, new potable well and all associated site works and boundary treatments

Ballinacurra Kilmore, Brinny Innishannon Co. Cork

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?