Proposed Development
Permission for retention of
- a)external storage area storing modular sections of prefabricated buildings
- b)a single storey building for the storage/repair of prefabricated modular buildings and associated site works.
Application Details
- Location
- Kilmore Brinny Co. Cork
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 31 August 2022
- Status
- WITHDRAWN
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for retention of a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/ repair of prefabricated modular buildings and associated site works
Kilmore Brinny Co.Cork
Permission for retention of a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/repair of prefabricated modular buildings, c) continuance of use of the existing vehicular access from public road and associated site works.
Kilmore Brinny Co Cork
Permission for retention of; a) external storage area storing modular sections of prefabricated buildings and b) a single storey building for the storage/repair of prefabricated modular buildings, c) continuance of use of the existing vehicular access from public road and associated site works
Kilmore Townland Brinny Co.Cork
Retention of substructure and completion of detached garage
Kilmore Innishannon
Ground and first floor extension to dwellinghouse
Saoirse Kilmore Innishannon
Permission for the construction of a 449.8msq (including 77.1msq Mezzanine) purpose-built operational infrastructure facility, supporting essential civil engineering and utility services, including secure storage areas for plant, machinery, and other construction materials and tools required soley in connection with the applicant's civil engineering and utility contracting business, a revised vehicular entrance and gate, internal circulation areas, parking and operational hard standing, 10m x 7m external storage area, storing Clause 804 and pipe grit for emergency use, associated surface water drainage infrastructure, waste water treatment system to serve wc and all other ancillary site development works.
Kilmore, Brinny, Innishannon, Co. Cork.
Permission for the construction of 3690msq purpose-built operational infrastructure, supporting essential civil engineering and utility services, including secure storage areas for plant, machinery, aggregates and other construction materials and tools required solely in connection with the applicant' s civil engineering and utility contracting business, a revised vehicular entrance, internal circulation areas, service yards and operational hard standing, associated surface water drainage infrastructure and all other ancillary site development works
Brinny, Innishannon, Co.Cork
The importation of soil & stone for the raising of an agricultural field/restoration of a quarry in order to improve the agricultural output of the field/quarry.
Kilmore Bandon Co. Cork
1) Permission for retention and continued use of the existing processing plant and related water management system, the existing concrete plant and ancillary buildings, site access and all related ancillary works/facilities (wheel wash, bunded fuel storage with hydrocarbon interceptor, weighbridge, etc.) permitted under Pl.Reg.No. S/02/1023), all for a duration of 10 years. 2) Permission for proposed development comprising recycling of c. 15,000 tonnes of concrete for use in concrete production, importation of 25,000 tonnes of sand & gravel for processing, importation of c. up to 20,000 tonnes of soil and stone per year (under Article 27) for phased site restoration with a revised phasing plan, and completion of restoration of the overall site to agricultural use. Permission is sought for eight years plus two years for final restoration, total of 10 years. All within an application area of c. 21.4 hectares.
Kilmore Brinny Co Cork
Permission for retention and continued use of existing processing plant and related water management system, the existing concrete plant, ancillary buildings (site office 63 sq.m), 3 no. welfare portacabins (32 sq.m, 23.5s q.m & 22.0 sq.m), 4 no. storage buildings/containers (15 sq.m, 10 sq.m, 6 sq.m & 5 sq.m), 2 no. garages (76 sq.m & 76 sq.m), ESB Substation (26 sq.m), covered vehicle storage (220 sq.m), site access and all related ancillary facilities (wheelwash, fuel storage tank, weighbridge etc), permitted under Pl.Reg.No. S/02/1023), all for a duration of 10 years. 2) Permission for proposed development comprising removal of existing disused fuel storage tanks, recycling of c.15,000 tonnes of concrete for use in concrete production, importation of 25,000 tonnes of sand & gravel for processing, importation of c. up to 20,000 tonnes of soil and stone per year (under Article 27) for phased site restoration with a revised phasing plan and completion of restoration of the overall site to agricultural use. Permission is sought for eight years plus two years final restoration, total of 10 years. All within an application area of c.21.4 hectares.
Kilmore Brinny Co Cork
The submission window has closed
Observations on this application closed on Tuesday 4 October 2022, five weeks after it was received. The authority cannot accept a late submission.