← Back to search

No. 17 Dun Na Mara Dysart Youghal

CONDITIONAL

Planning application 23/5049

Cork - Cork County Council

Proposed Development

Permission of retention of altered window and door openings on the north-east (side) and north-west (rear) elevations of our existing dwelling house

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    24 May 2023

  2. Decision: CONDITIONAL

    13 Jul 2023

  3. Decision due

    18 Jul 2023

  4. Grant issued

    24 Aug 2023

Application Details

Location
No. 17 Dun Na Mara Dysart Youghal
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
24 May 2023Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 July 2023
Grant Date
24 August 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

180m
03/5785REFUSED20 Nov 2003

Minor changes in design of 3 no. dwelling houses under construction permitted under S/98/0937 including omitting 1 velux rooflight to the NE and SW elevation and installation of 2 no. additional windows to SE elevation

Ballyclamasy Youghal Co. Cork.

183m
11/5702WITHDRAWN9 Aug 2011

Demolition of an existing dwelling and construction of 2 no 2 storey dwellings

Ballyclamasy Summerfield Youghal

291m
04/58101CONDITIONAL5 Feb 2004

Refurbishment and upgrade of part of existing facade, part demolition of existing entrance facade, creation of a new entrance and entrance facade and erection of decorative lighting poles and associated signage at Seafield Business Centre, Youghal

Seafield Business Centre Seafield Youghal

293m
13/4137CONDITIONAL29 Jan 2013

Planning permission is sought by Youghal Town Council on part of site within the jurisdiction of Cork County Council together with a Part 8 application on that part of the site which is within the jurisdiction of Youghal Town Council. The development in its entirety comprises of the construction of a motorhome park to include site entrance via existing leisure centre entrance, 84no. motorhome parking bays, 4no. parking Aires (wastewater disposal points), playground with associated car parking, all-weather playing pitch with flood lighting and associated car parking, associated internal roadways, green spaces and watercourse crossings, treatment of existing watercourses, new separate public coach parking with separate site entrance, fencing, new roadside public footpath along with all associated site works, drainage and services. The proposed development within the administrative boundary of Cork County Council to which this application relates consists of 81no. motorhome parking bays, part thereof of the remaining 3no. motorhome parking bays, 4no. parking Aires (wastewater disposal points), playground with associated car parking, associated internal roadways, green spaces and part of water course crossings, treatment of existing watercourses, new separate public coach parking area with separate site entrance, fencing, new roadside public footpath along with all associated site works, drainage and services.

Claycastle Summerfield Youghal Co.Cork

334m
05/5989INCOMPLETED APPLICATION19 Aug 2005

Construction of bird watching pond and viewing area

Summerfield Youghal

334m
05/4363INCOMPLETED APPLICATION22 Jun 2005

Bird watching pond and viewing area

Summerfield Youghal

351m
12/4572CONDITIONAL26 Mar 2012

Construction of a single storey extension to the rear of licensed premises

Summerfield Youghal

381m
08/58026CONDITIONAL7 May 2008

Install a new solid fuel boiler and fuel storage unit

Youghal Leisure Centre Claycastle Youghal Co. Cork.

381m
11/58008CONDITIONAL19 Sept 2011

Permission for a proposed single storey extension to the east elevation of the existing Leisure Centre. The new facility to include 2 no. Group changing rooms. each incorporating an accessible shower/w.c. at Claycastle, Youghal, Co. Cork

Claycastle, Youghal, Co.Cork,

401m
25/5872Awaiting Validation SRO11 Sept 2025

Permission for 1) to partially demolish of existing derelict protected industrial building, 2) permission is also sought for construction of 17 no. dwelling units consisting of 12 no. 3-bedroom semi-detached units and 5 no. 3-bedroom terraced houses. The development will include the provision for the construction of service road, footpaths, grass margins, public lighting, boundary wall treatment around the site boundaries, surface water treatment, connecting to public mains water and foul water services, and all associated site works. The proposed development works involves works to a protected structure, ref. no. 02971. reg. no. 20823290 at Seafield Business Centre, Upper Strand, Youghal, Co. Cork P36 DP27.

Seafield Business Park, Upper Strand Road, Youghal, Co.Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?