Proposed Development
Outline permission to construct a new dwelling house with domestic garage, entrance, wastewater treatment unit with percolation area and all associated site and ancillary works
Application Timeline
Application received
23 Jun 2023
Decision due
17 Aug 2023
Decision: REFUSED
17 Aug 2023
Application Details
- Location
- Longueville Mallow Co.Cork
- Applicant
- N/A
- Application Type
- OUTLINE PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 June 2023Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- REFUSED
- Decision Date
- 17 August 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of an extension to the side of existing dwelling
Kilmichael Mallow .
Permission to construct a new machinery shed and all associated site works.
Longueville, Mallow, Co. Cork.
To construct a new dwelling house.
Longueville Mallow Co. Cork
To construct a new dwelling house.
Longueville Mallow Co. Cork
To construct a new dwelling house
Longueville Mallow Co. Cork
Construct a dwelling house with domestic garage, entrance, wastewater treatment unit with percolation area and all associated site and ancillary works.
Longueville Mallow Co Cork
Permission for retention of change of use of schoolhouse to dwelling house, retention of rooflights to dwelling, retention of detached domestic garage, and permission for installation of waste water treatment system and sand polishing filter
Longueville Schoolhouse Kilgobban Mallow
Permission for Retention for a change of use from permitted use of a "storage shed" to a "waste transfer facility" to accept up to 4,500 tonnes per annum at the Food Surplus Management (FSM) facility and Permission for a modest increase in tonnages received at the Food Surplus Management (FSM) facility from 4,500 tonnes per annum to 6,000 tonnes per annum. The waste transfer facility currently collects up to 4,500 tonnes/annum of: former foodstuffs and catering waste of animal origin (animal by-product (ABP)) collected in wheelie bins (with some bulk i.e. pallets and pallet boxes) by FSM fleet and subject to the current DAFM Licence IRL EC C3-0015. This material is bulked for recovery by way of anaerobic digestion (AD) off-site and, former foodstuff of non-animal origin (non-ABP), collected in wheelie bins (with some bulk i.e. pallets and pallet boxes) by FSM fleet. This material includes materials such as fruit, vegetables, bread and confectionary. This produce is bulked onsite and sent for AD recovery (off-site). On-site facilities and equipment include: warehouse (815m2), floor scales, transfer machinery, hopper and screw feed, pumps, internal drainage system and associated tanks, floor scrubber, pallet boxes/bins, power washer, x3 rigid curtain sided vehicles, x1 larger articulated tractor unit & trailer, outbound bulk trailer, x1 forklift, x1 shunter vehicle. The permission for a modest increase to 6,000 tonnes/annum would include the same foodstuffs as described above.
Ruanes Mallow Co Cork
Retention permission for a change of use from permitted use of a "storage shed" to a 'waste transfer facility' to accept up to 4,500 tonnes per annum at the Food Surplus Management (FSM) facility and permission for a modest increase in tonnages received at the (FSM) facility from 4,500 tonnes per annum to 6,000 tonnes per annum. The waste transfer facility currently collects up to 4,500 tonnes/annum of: former foodstuffs and catering waste of animal origin (animal by-product (ABP)) collected in wheelie bins (with some bulk i.e. pallets and pallet boxes) by FSM fleet and subject to the current DAFM Licence IRL EC C3-0015. This material is bulked for recovery by way of anaerobic digestion (AD) off-site and former foodstuff of non-animal origin (non-ABP), collected in wheelie bins (with some bulk i.e. pallets and pallet boxes) by FSM fleet. This material includes materials such as fruit, vegetables, bread and confectionary. This produce is bulked onsite and sent for AD recovery (off-site). On-site facilities and equipment include: warehouse (815m2), floor scales, transfer machinery, hopper and screw feed, pumps, internal drainage system and associated tanks, floor scrubber, pallet boxes/bins, power washer, x3 rigid curtain sided vehicles, x1 larger articulated tractor unit & trailer, outbound bulk trailer, x1 forklift, x1 shunter vehicle. The permission for a modest increase to 6,000 tonnes/annum would include the same foodstuffs as described above.
Ruanes Mallow Co Cork
Alterations to and an extension to the rear of Longueville House Hotel, alteration, refurbishment, conversion and change of use of existing ancillary storage buildings, the demolition of 590 sq.m of additional buildings including the part demolition and change of use of an existing habitable residential unit, and the construction of 5181 sq.m. of additional buildings all to facilitate the provision of 60 additional hotel bedrooms, 21 suites, 18 staff bedrooms with laundry, a spa facility, an additional restaurant/bar and an oratory to the existing hotel. Provision of additional car parking areas and extension of existing car park to provide in total 140 spaces, upgrading of existing access at the public road including alterations to the existing entrance walls. Provision of a new sewage treatment plant and sand filter/percolation system and an underground storm water attenuation tank to the west of the site and all associated development works and landscaping.
Longueville House Longueville Mallow
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?