Ruanes Mallow Co. Cork

INCOMPLETED APPLICATION

Planning application 23/5369

Cork - Cork County Council

Proposed Development

The development consists retention permission for a change of use from permitted use of a ‘storage shed’ to a ‘waste transfer facility’ to accept up to 4500 tonnes per annum at the Food Surplus Management (FSM) facility and permission for a modest increase in tonnages received at the Food Surplus Management (FSM ) facility from 4500 tonnes per annum to 6000 tonnes per annum. The waste transfer facility currently collects up to 4500 tonnes/annum of: Former foodstuffs and catering waste of animal origin (animal by-product (ABP)) collected in wheelie bins (with some bulk i.e. pallets and pallet boxes) by FSM fleet and subject to the current DAFM Licence IRL EC C3-015. This material is bulked for recovery by way of Anaerobic Digestion (AD), off-site, and Former foodstuff of non-animal origin (non-ABP), collected in wheelie bins (with some bulk i.e. pallets and pallet boxes) by FSM fleet. This material includes materials such as fruit, vegetables, bread and confectionary. This produce is bulked onsite and sent for AD recovery (off-site). On-site facilities and equipment include: Warehouse (815 m2), floor scales transfer machinery, hopper and screw feed, pumps, internal drainage system and associated tanks, floor scrubber, pallet boxes/bins, power washer, x3 Rigid curtain sided vehicles, x1 Larger articulated tractor unit and trailer, outbound bulk trailer, x1 Forklift, x1 Shunter vehicle. The permission for a modest increase to 6000 tonnes/annum would include the same foodstuffs as described above.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Jul 2023

  2. Decision due

    28 Aug 2023

Application Details

Location
Ruanes Mallow Co. Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
3 July 2023
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
28 August 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1m
23/5024INCOMPLETED APPLICATION19 May 2023

Retention permission for a change of use from permitted use of a 'storage shed' to a 'waste transfer facility' to accept up to 4500 tonnes per annum at Food Surplus Management (FSM) facility and for permission for a modest increase in tonnages received at the Food Surplus Management (FSM) facility from 4500 tonnes per annum to 6000 tonnes per annum. The waste transfer facility currently collects up to 4500 tonnes/annum of: former foodstuffs and catering waste of animal origin (animal by-product under DAFM License IRL EC C 3-015) and former foodstuff of non-animal origin (non- ABP such as fruit, vegetables, bread and confectionery) collected in wheelie bins (with some bulk i.e pallets and pallet boxes) by FSM fleet. This material is bulked for recovery by way of Anaerobic Digestion (AD), off-site. On-site facilities and equipment include: Warehouse (790 m2), floor scales, transfer machinery, hopper and screw feed, pumps, internal drainage system and associated tanks, floor scrubber, pallet boxes/bins, power washer, x3 Rigid curtain sided vehicles, x1 Larger articulated tractor unit & trailer, outbound bulk trailer, x1 forklift, x1 shunter vehicle. The permission for a modest increase to 6000 tonnes/annum would include the same foodstuffs as described above.

Ruanes Mallow Co Cork

1m
23/5657WITHDRAWN14 Aug 2023

Retention permission for a change of use from permitted use of a "storage shed" to a 'waste transfer facility' to accept up to 4,500 tonnes per annum at the Food Surplus Management (FSM) facility and permission for a modest increase in tonnages received at the (FSM) facility from 4,500 tonnes per annum to 6,000 tonnes per annum. The waste transfer facility currently collects up to 4,500 tonnes/annum of: former foodstuffs and catering waste of animal origin (animal by-product (ABP)) collected in wheelie bins (with some bulk i.e. pallets and pallet boxes) by FSM fleet and subject to the current DAFM Licence IRL EC C3-0015. This material is bulked for recovery by way of anaerobic digestion (AD) off-site and former foodstuff of non-animal origin (non-ABP), collected in wheelie bins (with some bulk i.e. pallets and pallet boxes) by FSM fleet. This material includes materials such as fruit, vegetables, bread and confectionary. This produce is bulked onsite and sent for AD recovery (off-site). On-site facilities and equipment include: warehouse (815m2), floor scales, transfer machinery, hopper and screw feed, pumps, internal drainage system and associated tanks, floor scrubber, pallet boxes/bins, power washer, x3 rigid curtain sided vehicles, x1 larger articulated tractor unit & trailer, outbound bulk trailer, x1 forklift, x1 shunter vehicle. The permission for a modest increase to 6,000 tonnes/annum would include the same foodstuffs as described above.

Ruanes Mallow Co Cork

1m
24/5986INCOMPLETED APPLICATION21 Oct 2024

Permission for Retention for a change of use from permitted use of a "storage shed" to a "waste transfer facility" to accept up to 4,500 tonnes per annum at the Food Surplus Management (FSM) facility and Permission for a modest increase in tonnages received at the Food Surplus Management (FSM) facility from 4,500 tonnes per annum to 6,000 tonnes per annum. The waste transfer facility currently collects up to 4,500 tonnes/annum of: former foodstuffs and catering waste of animal origin (animal by-product (ABP)) collected in wheelie bins (with some bulk i.e. pallets and pallet boxes) by FSM fleet and subject to the current DAFM Licence IRL EC C3-0015. This material is bulked for recovery by way of anaerobic digestion (AD) off-site and, former foodstuff of non-animal origin (non-ABP), collected in wheelie bins (with some bulk i.e. pallets and pallet boxes) by FSM fleet. This material includes materials such as fruit, vegetables, bread and confectionary. This produce is bulked onsite and sent for AD recovery (off-site). On-site facilities and equipment include: warehouse (815m2), floor scales, transfer machinery, hopper and screw feed, pumps, internal drainage system and associated tanks, floor scrubber, pallet boxes/bins, power washer, x3 rigid curtain sided vehicles, x1 larger articulated tractor unit & trailer, outbound bulk trailer, x1 forklift, x1 shunter vehicle. The permission for a modest increase to 6,000 tonnes/annum would include the same foodstuffs as described above.

Ruanes Mallow Co Cork

59m
21/5003WITHDRAWN16 Apr 2021

To increase site boundaries to accommodate the construction of a domestic shed for the storage of old/vintage cars, caravan, ride on lawnmower, garden furniture, firewood, etc

Ruanes Ballyclough Mallow Co. Cork

62m
20/6913INCOMPLETED APPLICATION21 Dec 2020

Alterations to site boundaries and to construct a galvanised shed and all associated site works.

Ruanes Mallow Co. Cork

67m
09/6819INCOMPLETED APPLICATION26 Aug 2009

Construction of one and a half storey dwelling, garage, entrance, bored well, proprietary treatment system, sand polishing filter and associated site works

Ruanes Ballyclough Mallow

67m
09/7018CONDITIONAL11 Sept 2009

Construction of one-and-a-half storey dwelling, garage, entrance, bored well, proprietary treatment system, sand polishing filter & all associated site works

Ruanes Ballyclough Mallow

87m
09/4657INCOMPLETED APPLICATION3 Mar 2009

One-and-a-half storey dwelling, garage, entrance, proprietary treatment system, soil polishing filter & all associated site works

Ruanes Ballyclough Mallow

87m
09/4876WITHDRAWN23 Mar 2009

One-and-a-half-storey dwelling, garage, entrance, bored well, proprietary treatment system, sand polishing filter & all associated site works

Ruanes Ballyclough Mallow

171m
03/1050CONDITIONAL12 Mar 2003

Dwellinghouse and waste water treatment unit

KILCRANATHAN, KILCRANATHAN,

The submission window has closed

Observations on this application closed on Sunday 6 August 2023, five weeks after it was received. The authority cannot accept a late submission.