Proposed Development
Construction of a detached 2 storey dormer type dwelling house, a domestic garage, a waste water treatment plant and percolation area, a bored water well and site development works.
View the full application file on the council's planning portal →Application Timeline
Application received
21 Jul 2023
Decision due
14 Dec 2023
Application Details
- Location
- Ballynoe Ballinhassig Co Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 21 July 2023
- Status
- WITHDRAWN
- Decision
- Pending
- Decision Due
- 14 December 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Dwellinghouse and proprietary sewerage treatment unit
Ballynoe Ballinhassig
Dwellinghouse and proprietary sewage treatment unit
BALLYNOE, BALLYNOE,
Permission for: 1) change of use of existing detached residential garage to a residential dwelling. 2) Alterations to the elevations of this unit including raising the ridge height, and 3) a new wastewater treatment and percolation area and all associated site works.
Kestral Cottage Ballynoe Ballinhassig Co. Cork
To construct a new dwelling house.
Kilmurriheen Togher Co. Cork
Demolition of a porch and single storey extension to existing dwelling, construction of a new two storey extension to the North East, alterations to existing elevations, replacement of existing septic tank with a new proprietary wastewater treatment unit and percolation area, relocation of private water well and all associated site works
Kilmurriheen Spur Hill Togher Co. Cork
Dwellinghouse
Ballynoe Ballinhassig
Dwellinghouse
Ballynoe Ballinhassig
Dwellinghouse
Ballynoe Ballinhassig
The demolition of a detached garage, 3 no. garden sheds, and a side extension to an existing dwelling house, and for the construction of a new two-storey side and rear extension, alterations to the existing rear elevation, revisions to the existing vehicular entrance to provide 2 no. entrance gates to 2 no. existing dwellings, a new driveway, and all associated site works.
Avalon Kilmurriheen Togher Co. Cork
Dormer style dwelling within same site as existing family dwelling with revised vehicular entrance, treatment unit & raised percolation area, & new treatment unit & raised percolation area for existing dwelling
Kilmurriheen Togher
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?