← Back to search

4 Kingston Buildings Chapel Street, Bandon Co.Cork

CONDITIONAL

Planning application 23/6537

Cork - Cork County Council

Proposed Development

The Renovation and alteration of the existing building, namely; a) the re-integration of the building into a single dwelling unit, b) the conversion of the third floor from storage use to habitable use, c) the re-instatement of 3 no. windows to the north-western elevation, d) the re-instatement of 3 no. windows to the south-eastern elevation and e) all ancillary works. The works relate to a protected structure (ref no. 1195)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Dec 2023

  2. Decision due

    11 Apr 2024

  3. Decision: CONDITIONAL

    11 Apr 2024

  4. Grant issued

    16 May 2024

Application Details

Location
4 Kingston Buildings Chapel Street, Bandon Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
19 December 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
11 April 2024
Grant Date
16 May 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

17m
09/4413WITHDRAWN11 Feb 2009

Alterations to existing structure including installation of double doors to gable end of structure and partial change of use of St. Fintan's Boys National School from a disused school building to a funeral home, construction of new vehicular access and external toilet block and associated site works

Chapel Street Gully Bandon

17m
09/4166INCOMPLETED APPLICATION23 Jan 2009

Alterations to existing structure including installation of double doors to gable end of structure & permission for partial change of use of St.Fintan's Boys National School from a disused national school building to a funeral home, new vehicular access, external toilet block & associated site works

Chapel Street Gully Bandon

17m
05/2441WITHDRAWN15 Apr 2005

Alterations, two storey extension and change of use of disused St. Fintan's Boys N.S. to 4 no. apartments, car parking to rear, extension to rear, access stairs and bin sorage to rear

The Green Gully Rural Bandon

17m
04/6210WITHDRAWN13 Aug 2004

Alterations, extensions and change of use of St. Fintan's Boys National School to 3 no. commercial units with access stairs and associated works

The Green Gully Bandon

28m
15/5996WITHDRAWN4 Sept 2015

Change of use of St.Fintan’s National School (a protected structure) from existing disused school building to community centre, construction of a single storey extension to rear and new window to north gable of said building and all associated site works

St. Fintan's National School Chapel Street Gully Bandon

28m
21/7021INCOMPLETED APPLICATION8 Nov 2021

Change of use of St. Fintan’s National School (A Protected Structure) from existing disused School Building to Community Centre, construction of single storey extension to rear and new window to north gable of said building and all associated site works. Extension of duration of permission granted under planning reference: 16/06154.

St Finian's National School Chapel Street Gully Bandon, Co. Cork

28m
16/6154CONDITIONAL26 Aug 2016

Change of use of St. Fintan’s National School (A Protected Structure) from existing disused School Building to Community Centre, construction of single storey extension to rear and new window to north gable of said building and all associated site works.

St. Fintan's National School Chapel Street Gully Bandon

28m
22/5172CONDITIONAL20 May 2022

Permission for - a) The change of use of St.Fintan's national school (A protected structure) from existing disused school building to community centre, b) the construction of a single storey extension to the rear of the existing building, c) the formation of a new window in the north gable of the existing building, d) the construction of a new ramped and stepped access within the curtilage of the site, from the public footpath, and all associated site works.

St.Fintans National School Chapel Street Gully, Bandon Co.Cork

28m
24/4209CONDITIONAL9 Feb 2024

Permission for change of design of the permitted change of use of St. Fintan’s National School (a protected structure) from existing disused school building to Community Centre (as granted under planning permission reg number 22/5172, as follows – a ) The construction of a revised new single storey extension , now proposed to be constructed to the side and rear of the existing building and b) The re-orientation of the permitted new ramped and stepped access within the curtilage of the site, from the public footpath, and all associated site works.

St. Fintan's National School Chapel Street Gully Bandon, Co. Cork

41m
05/2151INCOMPLETED APPLICATION7 Apr 2005

Retention of modifications to dwelling comprising the installation of 2 velux rooflights to street side and the incorporation into dwelling of previously existing attached structure to rear, including the alterations to opes and installation of velux rooflights thereto and affording ground floor living space and first floor mezzanine study

No. 1 The Green Gully Rural Bandon

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?