West Cork Distillers Ltd. Fastnet Industrial Estate Marsh Road Marsh, Skibbereen, Co. Cork
CONDITIONALPlanning application 24/315
Cork - Cork County Council
Proposed Development
Permission for the retention of the following as built structures:
- 1)Additional car parking area comprising of 28 no. car parking spaces and a pedestrian entry/exit gate providing access to the existing public footpath
- 2)Change of use from Visitor Centre to Distillery (Visitor Centre was conditioned out through condition no. 4, Planning Ref. 19/779)
- 3)First floor offices and associated staff welfare areas in Distillery building
- 4)Distillery stack to the existing Distillery building roof
- 5)Distillery spirit bond with a maximum tank height of 12m
- 6)Machinery building and associated Electrical Room with extended canopy to side of Machinery building
- 7)Grain intake area comprising of 6 no. grain silos and associated gantries
- 8)Glan bund 9 with a maximum tank height of 10.76m
- 9)Glan bund 10 with a maximum tank height of 10.35m and associated gantries; 10) 712cu/m Firefighting water retention tank
- 11)Column still and associated gantries
- 12)Boiler house and boiler stack
- 13)Sump for fire water diversion. Permission is also sought for the construction of the following:
- 14)New 60 tonne gas tank to replace the existing 30 Tonne gas tank
- 15)Grain intake building, approximately 42m2:
- 16)Two 40-foot containers for water treatment system
- 17)Two new Combined Heating & Power plant
- 18)New Workshop building, approximately 813m2. The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The proposed development is for the purposes of an activity requiring an Integrated Pollution Prevention and Control License
Application Timeline
Application received
12 Jun 2024
Decision: CONDITIONAL
4 Mar 2025
Decision due
10 Mar 2025
Grant issued
8 Apr 2025
Application Details
- Location
- West Cork Distillers Ltd. Fastnet Industrial Estate Marsh Road Marsh, Skibbereen, Co. Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 12 June 2024Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 March 2025
- Grant Date
- 8 April 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construct a single storey extension (130m²) to the Eastern side of the existing NCT building, construct a mezzanine floor over part of the existing offices, alterations to existing elevations, revisions to existing internal layout, construct additional car parking and all associated site works
NCT site Marsh Skibbereen Co. Cork
Permission to construct an extension and carry out alterations to an existing clubhouse
Gortnaclohy Mill Road Skibbereen Co. Cork
Construct an extension and carry out alterations to an existing clubhouse at Gortnaclohy, Mill Road, Skibbereen
Gortnaclohy Mill Road Skibbereen
Demolition of existing single-storey building currently used for equipment storage and for the construction of a prefabricated steel framed single storey sports unit with open gym, activity area, storage rooms and all associated site development works
The Riverside Complex GAA Grounds Marsh (Townlands) Marsh Road, Skibbereen, Co. Cork P81 P952
Planning Permission the following: a) Construct a two-storey extension to the Western side of the existing building for 2 No. storage units on the ground floor and offices/amenities on the first floor. b) Construct a covered canopy area on the Eastern side of the existing building including all associated site works
Railway Enterprise Centre, Curragh, Skibbereen, Co. Cork, P81FV40
Construction of portal framed steel building for use as commercial facility to include workshop with office and WC, store and loading facility, materials storage deport and all ancillary siteworks
The Marsh Road Curragh Skibbereen Co. Cork
Construction of portal framed steel building for use as commercial facility to include workshop with office and WC, store and loading facility, materials storage depot and all ancillary siteworks
Marsh Road Curragh Skibbereen Co. Cork
Change of use of part of existing Cope premises from day facilities use to short stay respite residential accommodation use, minor alterations and all associated site works
'The Laurels' Mill Road Gortnaclohy Skibbereen
Change of use of part of existing Cope premises from day facilities use to short stay respite residential accommodation use, minor alterations and all associated site works
'The Laurels' Mill Road Gortnaclohy Skibbereen, Co. Cork
minor alterations to and change of use of existing COPE foundation building from day facility and residential use to day facility use only at "The Laurels", Mill Road and for alterations and extensions to adjoining residence for use as COPE residence, construction of new boiler house at Cork Road and connection of both properties to town drainage system plus all associated site works at Mill Road and Cork Road, Gortnaclohy, Skibbereen.
"The Laurels, Mill Road & Cork Road Gortnaclohy Skibbereen
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?