Ballythomas East Ballythomas West Horsehill More North and Ballyvrin Lower Townlands Dunderrow Kinsale Co Cork
CONDITIONALPlanning application 24/4095
Cork - Cork County Council
Proposed Development
Permission for construction of a 2.5 metre wide artificial running track to the perimeter of an existing grassed area adjacent to the main security entrance and a set-down parking area offset from the existing entrance road for 4 vans and 5 cars along with 4 disability parking spaces to include the provision of an electric vehicle charging point and an illuminated directional sign at the entrance to the set-down parking area. The development will include all site works including the provision of underground services and hard landscaping. The proposed development is covered by an existing Industrial Emissions (IE) Licence No. P0009-05. The development refers to a modification to an establishment to which the Major Accident Regulations applies.
Application Timeline
Application received
24 Jan 2024
Decision: CONDITIONAL
4 Jun 2024
Decision due
5 Jun 2024
Grant issued
8 Jul 2024
Application Details
- Location
- Ballythomas East Ballythomas West Horsehill More North and Ballyvrin Lower Townlands Dunderrow Kinsale Co Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 24 January 2024Other applications received that week
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 4 June 2024
- Grant Date
- 8 July 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for construction of a 2.5 metre wide artificial running track to the perimeter of an existing grassed area adjacent to the main security entrance and a set-down parking area offset from the existing entrance road for 4 vans and 5 cars along with 4 disability parking spaces to include the provision of an electric vehicle charging point and an illuminated directional sign at the entrance to the set-down parking area. The development will include all site works including the provision of underground services and hard landscaping. The proposed development is covered by an existing Industrial Emissions (IE) Licence No. P0009-05. The development refers to a modification to an establishment to which the Major Accident Regulations applies.
Ballythomas East, Ballythomas West, Horsehill More North and Ballyvrin Lower, Dunderrow, Kinsale Co.Cork
The demolition of the existing single-storey security room and lobby attached to the front of the existing security, conference and training centre building (IE10), as well as the associated boundary wall and gates; the demolition of an existing single-storey container and an existing prefabricated building; the construction of a new single-storey extension with canopy to the front of the existing IE10 building for use as a reception and security centre, together with associated alterations to the existing IE10 security building ; modifications to security fencing and gates; footpaths; signage; provision of perimeter fence and gate; the construction of a new single-storey building (IE10B) with external roof access ladders for use as a site emergency response station, including changing facilities and parking garage. The proposed works include revisions to the existing car parking area; new pedestrian crossing; and all associated site development, drainage, landscaping and ancillary works. The development will be located on a site that currently operates under an Industrial Emissions (IE) License No. P0009-04. Under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act 2003). The new development is on a site to which the Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies.
Within existing Eli Lilly pharmaceutical complex at Ballythomas East, Ballythomas West, Horsehill More North, Ballyvrin Lower, Dunderrow, Kinsale, Co. Cork
Permission for a) A 15.3m high two storey cold storage building, comprising of cold storage warehousing and freezer storage, dock leveller, goods in and out areas with associated mechanical and electrical room on the first floor b) Single storey sub-station, c) Structural steel service racking, d) All road circulation, underground services, drainage and other associated site works. The proposed development is covered by an existing Industrial Emissions (IE) Licence No. P0009-05. The development refers to a modification to an establishment to which a Major Accident Regulation applies.
Ballythomas East Ballythomas West Horsehill More North & Ballyvrin Lower Dunderrow Kinsale Co Cork
Construction of creche with covered outdoor play areas, shed, playground and all associated site works to include access with footpath and on site turning set down
Horsehill More (South) Dunderrow Kinsale
Demolition of existing idled IE3 Production building and ancillary plant and equipment
Ballythomas East, Ballythomas West Horsehill More Dunderrow Kinsale
Permission for 7no. new motor control centre (MCC) rooms and associated development to serve 6 No. existing buildings within the facility (building no’s IE1, IE6, IE7, IE8, IE11, and IE22). The proposed MCC rooms development comprises as follows: 2 No. single storey MCC room structures of approx. 57 sq.m. each adjacent to building IE1, and local diversion of existing foul sewer adjacent to building IE1; ground floor extension of approx. 12sq.m. to building IE6 and internal alterations to part (approx. 34sq.m.) of existing ground floor of building IE6 to accommodate an MCC room of approx. 46sq.m. in total; first floor/roof level extension at building IE7 for MCC room of approx. 55.50sq.m. (including removal and replacement of approx. 15sq.m. of existing access area) to be accessed by existing external stairs; first floor / roof level extension to existing single storey gas shed adjacent to building IE8 to accommodate an MCC room of approx. 42.16sq.m., and provision of new external access stairs; first floor / roof level extension at building IE11 to accommodate an MCC room of approx. 49.50sq.m., and provision of new external access stairs; and first floor / roof level extension at building IE22 for MCC room of approx. 58.50sq.m., and provision of new external access stairs; and all ancillary access and associated site development works. The development will be located on a site that currently operates under an Industrial Emissions (IE) Licence (P0009-04) under Part IV of the Environmental Protection Agency Act 1992 (as amended). The site comprises of an establishment to which the Chemicals Act (Control of Major Accident Hazard Involving Dangerous Substances) Regulations 2015 (S.I. 209 of 2015) applies.
Eli Lilly Pharmaceutical Complex Ballythomas East, Bally Thomas West Horsehill More North and Ballyvrin Lower Dunderrow, Kinsale, Co. Cork
Residential development of 27 no. dwellinghouses comprising of 18no. detached dwellings and 9 no. terraced dwellings and associated site works, waste water treatment plant with access road, control kiosk and associated site works on a separate site and associated site works and services
Horsehill More (South) Dunderrow Kinsale
(1) A new external boiler flue of height not exceeding 21m above ground level adjacent to the existing IE04 building, (2) Construction of a new external support platform of height not exceeding 9.15m above ground level around the new boiler flue. All associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an Establishment to which the Major Accidents Directive applies.
Ballythomas East, Ballythomas West Horsehill More, Dunderrow Kinsale Co. Cork
(1) A new external boiler flue of height not exceeding 21m above ground level adjacent to the existing IE04 building, (2) Construction of a new external support platform of height not exceeding 9.15m above ground level around the new boiler flue, and all associated site development works. The proposed development is covered by the existing Integrated Pollution Control Licence (Licence Register P0009-03). The proposed development is located in an Establishment to which the Major Accidents Directive applies.
Ballythomas East, Ballythomas West Horsehill More Dunderrow Kinsale
Permission for development at Eli Lilly Kinsale pharmaceutical manufacturing campus. The proposed development will consist of: (1) Construction of a 3 storey laboratory extension to the existing laboratory/administration building (known as IE28) to comprise gross floor area of approximately 4,277sqm with height to parapet of approximately 19.62m and maximum height (roof top mechanical unit lourve) of 24.25m. (2) Re-alignment of the existing internal security fence and provision of pedestrian turnstile access. (3) All associated site development works including modification to adjacent internal site roads and site services, drainage connections, provision of hard standing areas and landscaping. The proposed development is located on a site that operates under an existing Industrial Emissions (IE) Licence (no. P0009-05) under Part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environmental Act, 2003). The proposed development is on a site which the Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 (S.I 209 of 2015) applies.
Eli Lilly Campus, Ballythomas West, Ballythomas East, Horsehill More (North) & Ballyvrin Lower, Dunderrow, Kinsale, Co. Cork.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?