Dairygold Mallow Annabella Mallow Co Cork

INCOMPLETED APPLICATION

Planning application 24/4583

Cork - Cork County Council

Proposed Development

Permission for construction of a new Biomass Plant for the generation of steam as part of the decarbonization road map for the business. The development will consist of the construction of a single-storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height 24.342m above ground level, the construction of an extension to the existing pipe bridge, new internal access road and yard to facilitate vehicle movements and associated site works. The application relates to an establishment which has an Industrial Emissions License, reference no. P403-03. A Natura Impact Statement (NIS) will accompany the application.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    5 Apr 2024

  2. Decision due

    30 May 2024

Application Details

Location
Dairygold Mallow Annabella Mallow Co Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
5 April 2024
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
30 May 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
24/4713CONDITIONAL24 Apr 2024

Permission for the construction of a new Biomass Plant for the generation of steam as part of the decarbonisation road map for the business. The development will consist of the construction of a single storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height of 27.292m above ground level, the construction of an extension to the existing pipe bridge, new internal access road and yard to facilitate vehicle movements and associated site works. The application relates to an establishment which has an Industrial Emissions Licence, Ref.No. P0403-03. A Natura Impact Statement (NIS) will accompany the application.

Annabella Mallow Co Cork

75m
07/55026CONDITIONAL5 Apr 2007

Permission for the phased demolition of buildings (11.887m2 in total) on lands of 2.80 hectares (6.92acres) in Mallow Town Centre, in the townland of Annabella, Mallow, Co. Cork.

Mallow Town Centre Annabella Mallow Co Cork

84m
18/4946CONDITIONAL17 Apr 2018

Construction of: new CIP (Cleaning in Place) Bund with 6 no. tanks containing cleaning products (Bund 38), new part six-storey part single storey Production Building (Building 50) with new product bund and 12 no. silos and 2 no. single storey valve control buildings, new tanker unloading bay (Building 51), new part six-storey, part two-storey, Intermediate Product Store/Packaging Building (Building 52) and 2 no. loading bays, new single storey Finished Product Store 1 (Building 53) and 7 no. loading bays, new single storey Finished Product Store 2 (Building 54) and 6 no. loading bays, elevated visitor and operator access walkway from new laboratories and production building to the existing dryer and evaporator buildings, Relocation of existing Truck Washing Station, associated pipe racking, silos, compactor, signage and site works, new single storey Staff Entrance to existing Production Building 18, Alterations to and change of use of the existing Engineering Workshop and Stores Building to include new offices and laboratories and 2 no new loading bays (Building 04), Demolition of existing disused Garage (Building 27) and existing storage facility and loading bays (Buildings 05 and 20), The application relates to an establishment which has an Industrial Emissions Licence (P0403-03).The EIAR and the NIS will be submitted to the Planning Authority with the Application.

Annabella West End Mallow Co. Cork

118m
17/6276CONDITIONAL1 Sept 2017

Construct a new staff car park including a new access/entrance point.The proposed works will include (1) a new staff car park with a dense bitumen macadam surface finish, lighting, storm drainage incorporating gulleys, petrol interceptors, stormwater attenuation tank and attenuated discharge to Linehan’s Stream and (2) new access from Thomas Davis Street, including associated gates. The application relates to an establishment which has an Industrial Emissions Licence (PO403-03).

Thomas Davis Street Mallow Co.Cork

120m
08/55057CONDITIONAL1 Aug 2008

Permission for change of use from existing dis-used garage to retail area, including new shopfront and associated signage. Construction of new staff facilities to facilitate change of use carrying out alterations to shopfront of existing retail area

Shortcastle Services Shortcastle Street Mallow Co. Cork.

125m
12/55009WITHDRAWN27 Jul 2012

Permission to construct a significant expansion of milk processing facility

Annabella Mallow Co. Cork.

125m
12/55010CONDITIONAL10 Aug 2012

Permission to construct a significant expansion of milk processing plant. This application includes an Environmental Impact Statement and a Natura Impact Statement.

Annabella Mallow Co. Cork.

125m
18/4616UNCONDITIONAL14 Mar 2018

Construct a significant Expansion of their Milk Processing Facility at Annabella, Mallow, Co. Cork. The Proposed Development consists of:- Alterations to the existing North Entrance / Exit, This Entrance / Exit will accommodate all Vehicles including Heavy Goods Vehicles (H.G.V.)., Alterations to the existing South Entrance/ Exit incorporating the construction of a Central Island. Alterations to the existing North Boundary fence adjoining Lower Beecher Street; Demolition of the following Buildings or Structures and associated services a) Milk Intake Unit; b) Pasteurisation and Separation Building; c) Elevated Tower (Coloured Blue and White), 22.7metres high, over the Engineering Workshop and Stores; d) Single Storey Utility Building; e) 2 Storey Office Building; f)Single Storey Milk Powder Storage Building incorporating elevated Storage Tower, 21.2metres high and Electrical Equipment Rooms and Offices; g) Packaging and Palleting Area Store; h) Security and Weighbridge Control Building and i) Covered Canopied Area North of the Engineering Workshop and Stores and removal of all associated Redundant Tankage. Construction of the following Buildings or structures and associated services;- a) Single Storey part Open sided, roofed, Milk Intake Unit; b) Part Single / Part 2 Storey Pasteurisation and Separation Building; c)Building incorporating a 6 Storey (41.3m) high Spray Dryer Unit housing 2No. Dryers; d) Evaporator Unit Building; e) Single Storey Milk Powder Storage Building; f) Packing and Palletising Area; g) Utility Building; h) 2 Storey Administration Building; i) Single Storey Security Building; j) Single Storey Weighbridge Control Building; k) 2 Surface Level Weighbridges; l)Single Storey Polisher Building; m) Open Sided Single Storey Chemical Intake Bay; n) Single Storey Transformer Building; o)suspended structural steel pipebridges; p) alterations to the 1st Floor Stores of the Engineering Workshop and Stores to form Offices.Provision of the following tankage, height listed in brackets and all services associated with the tankage: 8 No. Raw Milk Storage Tanks (19.9m); 3 No. Cream Storage Tanks(11.4m); 3 No. Pasteurised Milk Storage Tanks (19.9m); 8 No. Vegetable Oil Storage Tanks (15.9m); 2 No. Milk Ingredient Storage Tanks(19.9m); 5 No. Raw Milk Cleaning Tanks (4.6m); 4 No. Pasteuriser Milk Cleaning Tanks (4.6m); 4 No. Pasteurised Milk Cleaning Tanks (4.6m); 3 No. Bulk Chemical Storage Tanks (8.1m); 8 No. Water Condensate Tanks (15.0m); 1 No. Proc

West End Annabella Mallow Co. Cork

127m
05/55017NEW APPLICATION25 Feb 2005

Permission to demolish existing stores and to construct a two-storey dwelling

Shortcastle Mallow Co. Cork.

127m
05/55085NEW APPLICATION24 Nov 2005

to demolish existing stores and to construct a two-storey dwelling and electric entrance gates

Shortcastle Mallow

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.