Barryscourt and Rossmore Carrigtwohill Co Cork
INCOMPLETED APPLICATIONPlanning application 24/4678
Cork - Cork County Council
Proposed Development
Permission for:
- 1)Provision of a 10,526 square metre defined recycling area in the quarry floor
- 2)Processing of up to 19,500 tonnes of waste concrete annually using a mobile crushing and screening plant
- 3)Stock piling of waste concrete prior to processing
- 4)Stockpiling of recycled aggregates prior to transport off-site for use in construction works.
Application Timeline
Application received
19 Apr 2024
Decision due
13 Jun 2024
Application Details
- Location
- Barryscourt and Rossmore Carrigtwohill Co Cork
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 19 April 2024Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- Pending
- Decision Due
- 13 June 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of 2 no. new ESB substation & distribution room buildings and the decommissioning of an existing ESB substation and all associated site works.
Rossmore Quarry Rossmore Townland Carrigtohill County Cork
Construction of vehicular entrance to service and maintain septic tank serving existing dwelling
The Bungalow Rossmore Carrigtwohill
The development consists of the continued use of the existing asphalt plant, the existing storage shed (837 sq. metres), and associated infrastructure and structures permitted under P. Ref. S/02/5476 (ABP Ref. PL04.203762); P. Ref. 14/04061; and P. Ref. 14/06489 (ABP Ref. PL04.244651) within an application area of 1.605 Hectares.
Rossmore Carrigtwohill Co. Cork
An increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under Planning Reg. Nos. 18/06874, 19/5050 and 20/04589), from 100 no. days per annum to 150 no. days per annum, within an application area of 1.605 Hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
The development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref’s 18/06874 and 19/5050), from 60 no. days per annum to 100 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
Development will consist of an increase in the number of days during which operations outside of normal working hours can take place at the existing permitted asphalt plant (permitted under planning reg. ref. 18/6874), from 40 no. days per annum to 60 no. days per annum, within an application area of 1.605 hectares. The proposed development will not result in any change in current output rates.
Rossmore Carrigtwohill Co. Cork
The application site comprises an existing asphalt plant (permitted as part of overall quarry development under Cork County Council Planning Ref. No. 02/5476, and An Bórd Pleanála Ref. No. PL04.203762) The proposed development seeks to provide for the extension of opening hours of asphalt plant to allow operations on site between 0600 hours and 1900 hours Mondays to Fridays and between 0700 hours and 1600 hours on Saturdays; occasional operations outside of normal working hours up to a maximum of 40no. days per annum. The proposed development will not result in any increase in the permitted output rate of existing quarry, which will be maintained at a rate of 250000 tonnes per annum
Rossmore Carrigtwohill Co.Cork
Dwelling
ROSSMORE, ROSSMORE,
Domestic workshop with attic space to rear of existing dwellinghouse
Rossmore Carrigtwohill
Retention of alterations to extension to dwelling
Rossmore Carrigtwohill
The submission window has closed
Observations on this application closed on Thursday 23 May 2024, five weeks after it was received. The authority cannot accept a late submission.