← Back to search

Flats Ballymakeery Co.Cork

CONDITIONAL

Planning application 24/4830

Cork - Cork County Council

Proposed Development

Permission for: 1) Demolition of existing single-storey garage at the side elevation, 2) Construction of a single-storey extension to the rear, 3) Internal alterations to existing bungalow and all ancillary site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 May 2024

  2. Decision: CONDITIONAL

    26 Jun 2024

  3. Decision due

    2 Jul 2024

  4. Grant issued

    1 Aug 2024

Application Details

Location
Flats Ballymakeery Co.Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
8 May 2024
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 June 2024
Grant Date
1 August 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

40m
24/4043INCOMPLETED APPLICATION15 Jan 2024

Ionad Cúram Leanaí, Naíolann, Naionra, Club Bricfeasta, Iarscoil, Ionad Tacaíochta Teaghlaigh, Oifig, Leithris, áiseanna súgracdh lasmuigh / The construction of a new family centre to include playschool, creche, nursery, afterschool room, kitchen/dining, office, stores, toilets and all other ancillary accommodation, new one-way entrance roadway, soft and hard play areas, set down area, public lighting, boundary fencing together with all other ancillary site works. Extension of Duration to Permission granted under Pl. Ref. No. 19/4089.

Cluain Réidh Flats Balie Mhic Íre / Ballymakeera Co Chorcai

40m
19/4089CONDITIONAL21 Jan 2019

The construction of new family centre to include playschool, crèche, nursery, afterschool room, kitchen / dining, office, stores, toilets and all other ancillary accommodation, new one-way entrance roadway, soft and hard play areas, set down area, public lighting, boundary fencing together with all other ancillary site works.

Cluain Reidh Flats Ballymakeera Co. Cork

41m
18/7316INCOMPLETED APPLICATION14 Dec 2018

The construction of new family centre to include playschool, creche, nursery, afterschool room, kitchen / dining, office, stores, toilets and all other ancillary accommodation, new one-way entrance roadway, soft and hard play areas, set down area, public lighting, boundary fencing together with all other ancillary site works.

Cluain Reidh Flats Ballymakeera Co. Cork

79m
03/415REFUSED5 Feb 2003

2 no. dwellings

FLATS, FLATS,

82m
21/7057CONDITIONAL12 Nov 2021

Alterations to Astro turf pitch playing area as previously granted under Planning Reg. No. 18/7008. This application includes for the following: (1) Increase in the Astro turf playing pitch size to 45m x 40m (previously 45m x 30m) (2) 4 no. 12m high floodlighting poles, each with 4 no. floodlights i.e. 16 in total (3) 10m high perimeter fencing to the Astro turf pitch playing area (4) 12m high ball stopping nets behind the east and west goals (5) Construction of a single storey maintenance shed and bike rack (6) Surface water drainage and all ancillary siteworks (7) Relocation of the flood water storage cells from underneath the Astro turf playing area to underneath the car park area of the creche which has been granted planning permission (Ref.19/4089).

Cluain Reidh Flats Ballymakeera Co. Cork

86m
24/6085CONDITIONAL4 Nov 2024

Is éard atá i gceist san fhorbairt ná; 1.24 Aonaid Chónaithe a thógáil ina n-áirítear: a.8 dteach leathscoite le 3 sheomra codlata b.16 theach leathscoite le 4 sheomra codlata 2. Slí isteach d’fheithiclí agus coisithe a sholáthar, chomh maith le colbha íseal ar bhóthar Chluain Réidh. 3. Oibreacha draenála bréanuisce agus uisce dromchla agus gach a bhaineann leo a sholáthar, réitigh draenála inbhuanaithe agus na hoibreacha láithreáin agus na seirbhísí coimhdeacha go léir a sholáthar. 4. Soláthar spáis oscailte chomhroinnte, spás oscailte priobháideach, an suíomh a thírdhreachtú agus cóireáil teorann, soilsiú poiblí, páirceáil do chónaitheoirí agus cuairteoirí, páirceáil rothair, naisc choisithe, rothair agus feithiclí tríd na fobartha agus gach obair fobartha láithreáin ghaolmhar eile. The development will consist of the following: 1. The construction of 24 no. residential units comprising of: a. 8 no. 3-bed semi-detached houses b. 16 no. 4-bed semi-detached houses 2. Provision of a new vehicle and pedestrian entrance and drop kerb from the Cluain Réidh roadway. 3. Provision of all associated surface water and foul drainage services, sustainable drainage solutions (SuDS), and all associated site works and ancillary services. 4. Provision of communal open space, private open space, site landscaping and boundary treatments, public lighting, resident and visitor car parking, bicycle parking, pedestrian, cycle, and vehicular links throughout the development, and all other associated site development works.

Cluain Réidh Flats Ballymakeery Co. Cork

101m
18/6750INCOMPLETED APPLICATION17 Oct 2018

Construction of new 45m x 30m multipurpose astroturf playing pitch, 10m high floodlighting, boundary fencing, access roadway, surface water drainage together with all other ancillary site works

Cluain Reidh Flats Ballymakeera Co. Cork

102m
18/7008CONDITIONAL16 Nov 2018

The construction of new 45m x 30m multipurpose astroturf playing pitch, 10m high floodlighting consisting of 4 no. 10m poles each with 2 no. floodlights 8 in total, boundary fencing, access roadway, bike rack, surface water drainage together with all other ancillary site works.

Cluain Reidh Flats Ballymakeera Co. Cork

112m
18/5158CONDITIONAL9 May 2018

To construct 25 No. dwellinghouses (16 previously permitted under planning reference number 05/6890), consisting of 16 No. 4 bedroom semi detached houses, 8 No 3 bedroom semi detached houses, 1 No. 4 bedroom detached, public open space, extension to existing estate driveway and footpaths, extension of public lighting, foul and surface water sewers, attenuation system together with permission for 2 No. temporary construction entrances separate to the existing main entrance.

Cluain Reidh Housing Development Flats Ballymakeera Co. Cork

134m
07/10480CONDITIONAL23 Aug 2007

Construction of creche facility incorporating parking, secure recreational area, solar panels and biomass boiler house

Flats Ballymakeera

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?