← Back to search

Annabella Mallow Co. Cork

Application Withdrawn

Planning application 24/5419

Cork - Cork County Council

Proposed Development

Permission for the construction of 3 new academy playing pitches, provision 2no. 40 foot containers to be used as changing areas, new site entrance, associated parking area and associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Jul 2024

  2. Decision due

    17 Sept 2024

Application Details

Location
Annabella Mallow Co. Cork
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
25 July 2024
Status
Application Withdrawn
Decision
Pending
Decision Due
17 September 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

121m
25/6672Application Withdrawn4 Dec 2025

Permission for the construction of new shared sports facility. The proposed development includes the provision of. (a) 7 no. playing pitches comprising 3 no. grassed rugby pitches (pitches no’s 1, 2 & 3), 2 no. grassed soccer pitches (pitches no’s 5 & 7), 1 no. astroturf/all-weather soccer pitch (pitch no. 4) and 1 no. astroturf/all-weather multi-use pitch (pitch no. 6). (b) The construction of 2 no. two-storey clubhouse buildings providing changing rooms, player and spectator welfare facilities with adjacent surface car and bicycle parking areas. (c) The provision floodlights of circa 15-21 metres in height, serving pitch no’s 1, 2, 3, 4 and 6. (d) The provision of 2 no. on-site wastewater treatment units with ancillary polishing filters to serve the proposed development. (e) The extension of the public footpath network along Kennel Hill (L-1203) to connect with the permitted footpath network in the ‘Rose Hill’ residential development permitted by An Bord Pleanála reference 312640-22, which is currently under construction. (f) The undergrounding/diversion of existing 10KV and 38KV overhead lines which traverse the site. (g) All other ancillary site development works including landscaping/compensatory planting and SuDS proposals. (h) Vehicular access to the proposed development will be provided via a shared site entrance from Kennel Hill (L-1203) with an additional pedestrian entrance to the southeast of the site also from Kennel Hill (L-1203). A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.

Annabella, Mallow, Co. Cork

136m
18/6633REFUSED5 Oct 2018

The importation of soil and stone for the raising of an agricultural field in order to improve the agricultural output of the field and the construction of a new temporary haul road

Annabella Mallow Co. Cork

144m
16/6589WITHDRAWN24 Oct 2016

Construct dwelling, entrance, proprietary treatment system and all associated site works

Annabella Mallow Co. Cork

144m
03/3411CONDITIONAL9 Jul 2003

Domestic garage/stores

ANNABELLA RURAL, ANNABELLA RURAL,

145m
16/6329INCOMPLETED APPLICATION20 Sept 2016

To construct dwelling, entrance proprietary treatment system and all associated site works.

Annabella Mallow Co. Cork

174m
07/11811CONDITIONAL19 Oct 2007

Demolition of dwelling and construction of dwellinghouse, installation of treatment unit and retention of existing vehicular entrance

Annabella Mallow

174m
07/11313INCOMPLETED APPLICATION28 Sept 2007

Demolition and construction of dwellinghouse and retention of vehicular entrance and septic tank

Annabella Mallow

174m
16/4455CONDITIONAL29 Feb 2016

Retention of domestic garage

Annabella Mallow Co. Cork

194m
19/5201CONDITIONAL13 May 2019

Retention of 2 no. domestic garages / stores ancillary to existing dwelling and all associated site works.

Annabella Td. Mallow Co. Cork

198m
17/5138CONDITIONAL10 May 2017

Construct a dwelling and all associated site works

Annabella Mallow Co. Cork

The submission window has closed

Observations on this application closed on Wednesday 28 August 2024, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?