← Back to search

Carrigane Road Carrigtohill Carrigtwohill Co Cork

INCOMPLETED APPLICATION

Planning application 24/5785

Cork - Cork County Council

Proposed Development

Permission to demolish an existing single storey semi-detached dwelling and associated outbuildings and for the construction of an 8 house residential development consisting of the following:- 1 no. detached 4 bedroom 2 storey dwelling, 2 no. semi-detached 4 bed 2 storey dwellings, 2 no. semi-detached 3-bed 2 storey units, and 3 no. 3 bed two storey terraced dwellings, the construction of a new vehicular access into the site from the L-3617-0 local roadway known as Carrigane Road, to construct all associated site development works to service the site including connection to local public services such as public lighting, and Uisce Eireann water main, to lay foul water and storm water sewer systems on the site, and to connect the foul water sewer to the existing foul water sewer located in the adjoining lands known as Fota Rock Estate.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    20 Sept 2024

  2. Decision due

    14 Nov 2024

Application Details

Location
Carrigane Road Carrigtohill Carrigtwohill Co Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
20 September 2024
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
14 November 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
24/6129CONDITIONAL11 Nov 2024

Permission to demolish an existing single storey semi-detached dwelling and associated outbuildings and for the construction of an 8 house residential development consisting of the following:- 1 no. detached 4 bedroom 2 storey dwelling, 2 no. semi-detached 4 bed 2 storey dwellings, 2 no. semi-detached 3 bed 2 storey units, and 3 no. 3 bed two storey terraced dwellings, the construction of a new vehicular access into the site from the L-3617-0 local roadway known as the Carrigane Road, to construct all associated site development works to service the site including connection to local public services such as public lighting, and to Uisce Eireann water main, to lay foul water and storm water sewer systems on the site and to connect the foul water sewer to the existing foul water sewer located in the adjoining lands known as Fota Rock Estate.

Carrigane Road Carrigtohill Carrigtwohill Co Cork

25m
08/5021CONDITIONAL27 Feb 2008

First floor extension to dwellinghouse

No.14, Ash road Fota Rock Carrigtohill

35m
08/5058CONDITIONAL27 Feb 2008

First floor extension to dwellinghouse

No.13, Ash Road Fota Rock Carrigtohill

64m
05/6803CONDITIONAL19 Sept 2005

Dormer dwelling (change of plan)

Carrigtohill

64m
11/4369UNCONDITIONAL25 Feb 2011

Completion of dormer dwelling permitted under Planning Reg. No. 05/6803

Carrigane Carrigtwohill

83m
10/5817CONDITIONAL20 Jul 2010

Construction of first floor extension to side of existing dwellinghouse

27 Ash Road Fota Rock Carrigtohill

87m
17/4514INCOMPLETED APPLICATION6 Mar 2017

Construction of a detached two storey dwelling, construction of a detached single storey garage, modifications to existing driveway and all other associated site works.

'Aspen' Carrigane Road Carrigtwohill Co. Cork

87m
17/4913CONDITIONAL18 Apr 2017

Construction of a detached two storey dwelling, construction of a detached single storey garage, modifications to existing driveway and all associated site works

'Aspen' Carrigane Road Carrigtwohill Co.Cork

94m
09/8068CONDITIONAL23 Dec 2009

Alterations and first floor extension to front and side of dwellinghouse and ancillary works

No.2, Rocklands Carrigane Road Part of Terry's-Land Carrigtohill

94m
09/7406INCOMPLETED APPLICATION22 Oct 2009

Alterations and construction of first floor extension to front and side of dwellinghouse and ancillary works

2 Rocklands Carrigane Road Terry's-Land Carrigtohill

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?