← Back to search

Ballyellis Mallow Co. Cork

CONDITIONAL

Planning application 25/4096

Cork - Cork County Council

Proposed Development

Permission to retain

  1. 1)
    alterations to garage
  2. 2)
    extensions to rear of garage
  3. 3)
    canopy to rear of dwelling,
  4. 4)
    single leaf wall connecting house and garage and all associated site works
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jan 2025

  2. Decision: CONDITIONAL

    24 Mar 2025

  3. Decision due

    25 Mar 2025

  4. Grant issued

    1 May 2025

Application Details

Location
Ballyellis Mallow Co. Cork
Applicant
N/A
Application Type
RETENTION
Planning Authority
Cork County Council

Timeline

Registration Date
29 January 2025Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
24 March 2025
Grant Date
1 May 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

444m
03/161CONDITIONAL20 Jan 2003

Renovations and extension to dwellinghouse

BALLYELLIS, BALLYELLIS,

445m
09/4459CONDITIONAL17 Feb 2009

Retention of (a) alterations to all four facades of existing dwelling and (b) detached domestic garage

Ballyellis Mallow

640m
03/5699REFUSED17 Nov 2003

Dwelling

Ballygarrett Mallow

766m
17/4964CONDITIONAL21 Apr 2017

Construction of a dwelling house and all associated site works.

Ballyellis Mallow Co. Cork

766m
23/4609CONDITIONAL31 Mar 2023

Construction of a dwelling and all associated site works.

Ballyellis Mallow Co Cork

766m
06/9724CONDITIONAL14 Aug 2006

Dwellinghouse

Ballyellis Mallow

860m
10/8496INCOMPLETED APPLICATION17 Nov 2010

Installation of a wastewater treatment plant and percolation area

Ballyellis Mallow Co Cork

867m
10/8679INCOMPLETED APPLICATION9 Dec 2010

Installation of a wastewater treatment plant and percolation area

Ballyellis Mallow Co Cork

888m
08/55085CONDITIONAL19 Dec 2008

permission for change of 9 no. houses consisting of 3 no. 4 bed house types "E", 4 no. 4 bed house types "D" and 2 no. 5 bed house types "L" previously permitted under Phase 3 plan file 55,035/06, to 8 no. houses consisting of 2 no. 4 bed new house type "E", 4 no. 4 bed new house type "D" and 2 no. 3 bed new house type "H1" and associated site works

Castlepark Residential Development St. Josephs Road Mallow Co. Cork.

923m
25/6943Grant with Conditions22 Dec 2025

The proposed development includes for the upgrade of the existing Mallow WTP to bring it into compliance with Uisce Éireann technical guidance documents with regards the coagulation, flocculation & clarification (CFC), filtration, chemical storage & dosing and residuals treatment processes. In addition, as part of the upgrade works it is proposed to increase the capacity of the WTP from 4,754m3/day to 5,042m3/ 22 hours. The development will consist/consists of the following: • Upgrade of the existing CFC process, including for the following: o Construction of a new flash mixing chamber with vertical turbine paddle; o Construction of a 3 no. cell flocculation stage and mixing process (Note: The provision of the new flash mixing and flocculation tank will require the relocation of existing outdoor chemical bulk storage tanks, the demolition of an existing storage building adjacent the main WTP building and the relocation of existing overhead lines.) • Pipework modifications to the existing rapid gravity filters. • Upgrade of the existing washwater residuals and sludge handling processes to ensure adequate treatment of residuals prior to river discharge and adequate storage for sludge on site, including: o 1no. new below ground equalization tank o 1no. new above ground settlement tank to be installed. o Re-purpose the existing sludge holding tank as a sludge balance tank. o 1no. picket fence thickener. o 1no. new sludge holding tank. o 2 no. pumping station kiosks, including: -sludge pumping station -sludge holding tank feed pumping station • Upgrade of the existing chemical storage arrangements including: o Installation of 1 no. outdoor Fluoride Bulk storage tank with integrated weather shrouded bund o Installation of 2 no. outdoor Poly Aluminium Chloride bulk storage tanks with integrated weather shrouded bunds o Installation of 2 no. outdoor Sodium Hydroxide bulk storage tanks with integrated weather shrouded bunds o Installation of 1no. outdoor Sodium Hypochlorite bulk storage tank. o Installation of 2 no. dedicated chemical delivery apron upon which chemical delivery vehicles shall park while unloading chemicals to the bulk storage tanks. The surface water network for the chemical delivery apron shall be able to be isolated during chemical deliveries and redirected towards a dedicated underground containment tank to capture any chemical spills. o Installation of 1no. indoor Orthophosphate bulk storage tank and bund. (Note, the existing chemical building to be modified including for replacement of 2 no. windows with a single and double door respectively). • Upgrade of the road layout to facilitate the proposed infrastructure upgrade for delivery of chemicals and sludge removal off-site. • Upgrade the surface water management for the proposed works, ensuring that the design complies with the requirements for sustainable drainage system (SuDS). • All ancillary site works including upgrade of the existing electrical, instrumentation, control & automation of the plant, diversion of existing overhead power lines and tree and hedgerow removal.

Mallow Water Treatment Plant, Ballyellis, Mallow, Co. Cork, P51 P489

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?