← Back to search

Ballybraher Ballycotton Co Cork

CONDITIONAL

Planning application 25/4826

Cork - Cork County Council

Proposed Development

Permission for the construction of a new site entrance to the existing detached dormer dwelling and all associated site works.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    1 May 2025

  2. Decision: CONDITIONAL

    24 Jun 2025

  3. Decision due

    25 Jun 2025

  4. Grant issued

    29 Jul 2025

Application Details

Location
Ballybraher Ballycotton Co Cork
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
1 May 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
24 June 2025
Grant Date
29 July 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

44m
05/7236CONDITIONAL5 Oct 2005

Dwelling (change of plan)

Ballybraher Ballycotton

84m
25/4833CONDITIONAL2 May 2025

Permission for the construction of a new two storey detached dwelling with a new wastewater treatment unit, and all associated site works

Ballybraher Ballycotton Co.Cork

94m
06/6755CONDITIONAL28 Apr 2006

Construction of extension and retention of dwelling (change of layout)

Bear Na Ban Ballybraher Ballycotton

98m
07/13129REFUSED17 Dec 2007

Erection of 15m support pole carrying 3 no. radio aerials and relocation of 2 no. radio link dishes from existing exchange building to new support pole for use by Emergency Services with associated equipment for new National Digital Radio Service

Eircom Exchange Ballybraher Ballycotton

222m
17/7389INCOMPLETED APPLICATION21 Dec 2017

Alterations to existing permission, Planning Ref No. 16/7306, to include relocation of foul drainage system, repositioning of dwelling house and garage to suit revision of site boundaries and all associated site works.

Ballybraher Ballycotton Co. Cork

222m
18/5082CONDITIONAL1 May 2018

Construction of dwellinghouse, foul drainage system and all associated site works (change of house type, removal of garage, revised layout and revised boundaries from that permitted under Planning Reg. No. 16/7306)

Ballybraher Ballycotton Co. Cork

236m
16/7306CONDITIONAL23 Dec 2016

The construction of a split level detached dwelling ‘dormer style with mezzanine’, new detached garage single storey building, modifications to road boundary ditch, new entrance and driveway, installation of a new site treatment unit and percolation area and all other associated site works

Ballybraher Ballycotton Co.Cork

252m
21/5988CONDITIONAL16 Jul 2021

a)the construction of a ground floor extension to the side of existing dwellinghouse, b) the construction of porch extension to the front of the existing dwelling house, c) installation of rooflights to the rear elevation of the existing dwellinghouse, d) alterations to existing windows on South and West elevations, e) installation of new on site wastewater treatment system and all associated site works

Ballybraher Ballycotton Co. Cork

260m
25/4071CONDITIONAL23 Jan 2025

Permission for construction of a single storey extension to the side (east) of the existing dwelling house, elevational change to existing side (east) window and all associated site works

Ceol na Mara Ballybraher Ballycotton Co.Cork

261m
18/4156CONDITIONAL22 Jan 2018

Construction of dwelling house, garage, foul drainage system, modifications to road boundary ditch, new entrance and driveway and all associated site works.

Ballybraher Ballycotton Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?