← Back to search

Ballinspittle Co. Cork P17 PA03

INCOMPLETED APPLICATION

Planning application 25/5544

Cork - Cork County Council

Proposed Development

Permission for demolition of existing single storey rear porch (c.1.5m2) construction of a new timber-clad dormer extension (c.28.5m2) at first floor level to the rear. Installation of new roof-lights to the rear slope, replacement of existing windows and front door with timber sash windows and hardwood door to front (street-facing) elevation and alu clad windows/doors to rear elevation, energy retrofit of existing dwelling, including internal insulation, conversion of 2 ground floor rear windows to doors. All associated site works including landscaping, drainage and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    31 Jul 2025

  2. Decision due

    24 Sept 2025

Application Details

Location
Ballinspittle Co. Cork P17 PA03
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Cork County Council

Timeline

Registration Date
31 July 2025
Status
INCOMPLETED APPLICATION
Decision
Pending
Decision Due
24 September 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
26/0718Grant with Conditions23 Mar 2026

Permission for the demolition of existing single-storey rear porch (c.1.5m2), construction of an enlarged timber clad dormer extension ( revised from that previously permitted under Reg. Ref. 25/5697) at first floor level to the rear, including provision of a 900mm deep recessed balcony and a new external stair from balcony to rear garden; installation of new roof-lights to the rear slope; replacement of existing windows and front door with timber sash windows and hardwood door to the front (street facing) elevation; aluminium clad windows/doors to rear elevation; energy retrofit of the existing dwelling including internal insulation; conversion of two ground floor rear windows to doors; and all associated site works and internal reconfiguration including landscaping, drainage and services.

Ballinspittle, Kinsale, Co. Cork, P17PA03

0m
25/5697Conditional Permission25 Aug 2025

Permission for demolition of existing single storey rear porch (c1.5m2), construction of a new timber-clad dormer extension (c.28.5m2) at first floor level to rear, installation of new roof lights to the rear slope, replacement of existing windows and front door with timber sash windows and hardwood door to front (street facing) elevation and alu clad windows/doors to rear elevation, energy retrofit of existing dwelling, including internal insulation, conversion of 2 ground floor rear windows to doors. All associated site works including landscaping, drainage and services.

Ballinspittle Co Cork P17 PA03

0m
26/0439Invalid - Prepare Letters23 Feb 2026

Permission for demolition of existing single-storey rear porch (c.1.5m2), construction of an enlarged timber clad dormer extension (revised from that previously permitted under reg ref. 25/5697) at first floor level to the rear, including the provision of a 900mm deep recessed balcony and new external stair from balcony to rear garden, installation of new roof-lights to the rear slope, replacement of existing windows and front door timber sash windows and hardwood door to front (street-facing) elevation, and alu-clad windows/doors to rear elevation, energy retrofit of existing dwelling, including internal insulation, conversion of 2 ground floor rear windows to doors, and all associated site works and internal reconfiguration including landscaping, drainage and services.

Ballinspittle, Kinsale, Cork, P17PA03

11m
18/4818CONDITIONAL4 Apr 2018

Subdivision of existing ground and first floor living quarters into two apartments, incorporating internal changes, construction of a single storey extension to proposed apartment, and two detached storerooms (domestic use) to the rear, addition of two windows, two doors to facades install new personnel door to existing gate, internal alterations and additions of toilet and kitchenette to unused ground floor retail and all associated site works.

Ballinspittle Co. Cork .

11m
08/8262WITHDRAWN5 Aug 2008

Demolition of dwellinghouse with associated ground floor retail unit and construction of two storey dwellinghouse and 2 storey building with ground floor retail unit with 1 no. duplex apartment over and associated site works

Ballinspittle Village Ballinspittle

11m
08/8042INCOMPLETED APPLICATION23 Jul 2008

Demolition and construction of two storey dwellinghouse and construction of two storey building incorporating 1 no. duplex apartment over ground floor retail unit and associated site works

Ballinspittle Village Ballinspittle

21m
08/7818CONDITIONAL11 Jul 2008

Retention of change of use of garage to hair salon and associated site works

Garrylucas Ballinspittle

35m
06/13029CONDITIONAL6 Dec 2006

Demolition of existing dwelling, garage and keg house and construction of 2 no. town houses

Ballinspittle

35m
06/11808INCOMPLETED APPLICATION27 Oct 2006

Demolition of garage, dwellings and keg house and construction of 3 no. townhouses

Adjacent to Nashs Bar Ballinspittle

35m
04/3288WITHDRAWN12 May 2004

Demolish garage and construct two storey structure with commercial unit on ground floor and apartment overhead

Nash's Pub Ballinspittle

The submission window has closed

Observations on this application closed on Wednesday 3 September 2025, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?