← Back to search

Ballynoran, Ballyhea, Co. Cork

Application Withdrawn

Planning application 25/5868

Cork - Cork County Council

Proposed Development

Permission to construct a single storey dwelling house and detached garage for domestic usage and all associated site works.

View the full application file on the council's planning portal →

Application Details

Location
Ballynoran, Ballyhea, Co. Cork
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
10 September 2025
Status
Application Withdrawn
Decision
Application Withdrawn

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

4m
25/4091REFUSED28 Jan 2025

Permission to construct a single storey dwelling house and detached garage for domestic usage and all associated site works

Ballynoran Ballyhea Co.Cork

21m
20/4782INCOMPLETED APPLICATION17 Apr 2020

To construct a new dwelling and all associated site works.

Ballynoran Td. Ballyhea Co. Cork

21m
20/5003REFUSED19 May 2020

To construct a new dwelling and all associated site works.

Ballynoran TD Ballyhea Co. Cork

21m
19/6333REFUSED25 Sept 2019

To construct a dwelling and all associated site works.

Ballynoran Td. Ballyhea Co. Cork

21m
21/4955REFUSED13 Apr 2021

To construct a new dwelling and all associated site works.

Ballynoran Td. Ballyhea Co. Cork

36m
23/6533INCOMPLETED APPLICATION19 Dec 2023

Permission to construct a barbican wooden foot bridge entrance to a holiday home and garden shed. Landscaped fruit bushes, vegetable garden and a hawe, apple and plum tree boundary with low environment impact.

Prochóg Cait Ballynoran Ballyhea Co Cork

131m
03/2546CONDITIONAL28 May 2003

Bungalow

BALLYNORAN, BALLYNORAN,

138m
17/4460CONDITIONAL1 Mar 2017

Retention of extension and alterations to existing cottage and all associated site works-This application involves a protected/listed structure.

Ballynoran Ballyhea Co.Cork

296m
23/6099CONDITIONAL17 Oct 2023

The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas concrete shoes to protect possible underground archaeological features, together with electrical transformation enclosures, underground cabling, temporary construction compounds, the use of existing farm access tracks, existing site entrances, widening of 1 No. existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing with some areas of boundary development on concrete shoes to further protect possible underground archaeological features, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity and transmitting it. A Natura Impact Statement will also be submitted to the Planning authority with this application.

Fiddane, Cooliney Coolcaum, Ballynoran, Ballynadrideen Ardnageehy, Charleville Co. Cork

345m
15/4171WITHDRAWN2 Feb 2015

The removal of condition no. 20 of planning permission granted under planning reference number 14/4817. This condition is in relation to maintenance of hedging and grass margin on the opposite roadside boundary to proposed vehicular entrance

Ballynoran Ballyhea Charleville, Co Cork

The submission window has closed

Observations on this application closed on Tuesday 14 October 2025, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?