Curraglass National School, Blackpool, Curraglass, Co. Cork, P51 AX94
Grant with ConditionsPlanning application 25/6867
Cork - Cork County Council
Proposed Development
Permission for the following works at Curraglass National School :- 1) Removal of existing external lean-to open canopy attached to school building; 2) Construction of new single storey extension to existing school building to include 1 no. new mainstream classroom, 1 no. new universal toilet, ancillary accommodation and new circulation areas; 3) Minor alterations to existing elevations and floor plans of existing school building to facilitate proposed works, including the installation of new rooflights to existing roof, construction of 1 no. new window and installation of new external lean-to open canopy; 4) Removal and decommissioning of existing septic tank and installation of new wastewater treatment system and associated infiltration area; 5) Extension of the existing outdoor hard standing play areas; 6) Installation of new soakaway; 7) Decommissioning of existing oil tank and associated pipework, and installation of new enclosed (1.8m high fencing) LPG tank to serve the school and associated pipework; 8) Removal of existing external metal shelter and relocation on site of 1 no. existing storage shed; 9) All associated ancillary development works.
View the full application file on the council's planning portal →Application Timeline
Application received
18 Dec 2025
Decision due
25 Jun 2026
Decision: Grant with Conditions
25 Jun 2026
Grant issued
6 Aug 2026
Application Details
- Location
- Curraglass National School, Blackpool, Curraglass, Co. Cork, P51 AX94
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 18 December 2025
- Status
- Application Closed
- Decision
- Grant with Conditions
- Decision Date
- 25 June 2026
- Grant Date
- 6 August 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Construction of classroom extension to National School, vehicular entrance, boundary wall, septic tank and percolation area
Curraglass N.S. Blackpool Curraglass
Construction of resource room extension to school
Blackpool Curraglass
Construction of new classroom, learning support room, concrete play area, second entrance from public road to new parking area and retention of general purpose room, proprietary waste water treatment plant and all associated site works
Curraglass NS Blackpool,Curraglass Mogeely
Construction of car park to serve existing school, construction of new site boundaries including road boundary wall, provision of vehicular entrance and dishing of existing footpath at entrance, new pedestrian entrances including access gates, erection of safety barriers for the extent of the public footpath and all ancillary works
Blackpool Curraglass Conna, via Mallow Co.Cork
Construction of car park to serve existing school, construction of new site boundaries including road boundary wall, provision of vehicular entrance and dishing of existing footpath at entrance, new pedestrian entrances including access gates, erection of safety barriers for the extent of the public footpath construction of open shelter and all ancillary works.
Blackpool Curraglass Conna via Mallow Co. Cork
Bungalow
Blackpool Curraglass Mallow
Dwellinghouse
Blackpool Curraglass Mallow
Dwellinghouse
Blackpool Curraglass Mallow
The upgrading of the existing waste water treatment plant, the installation of a lined treatment wetland, the installation of a sand filter, a pump station and a 1.5km of 12 bar 32mm OD MDPE pipe to the Bride River. The existing effluent percolation system will be decommissioned and the effluent from the fish processing plant will be then discharged to the Bride River. In conjunction with the planning application Carr Fish Limited will also apply for a new Discharge License to discharge the final treated effluent to the river.
Blackpool Curraglass Mallow Co. Cork
The upgrading of the existing waste water treatment plant, the installation of a lined treatment wetland, the installation of a sand filter, a pump station and a 1.5km of 12 bar 32mm OD MDPE pipe to the Bride River. The existing effluent percolation system will be decommissioned and the effluent from the fish processing plant will be then discharged to the Bride River. In conjunction with the planning application Carr Fish Limited will also apply for a new Discharge License to discharge the final treated effluent to the river.
Curraglass Mallow Co. Cork
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?