Application Timeline

  1. Application received

    30 Dec 2025

  2. Decision due

    7 Apr 2026

  3. Decision: Grant with Conditions

    7 Apr 2026

  4. Grant issued

    12 May 2026

Application Details

Location
Baltydaniel West, Mallow, Co. Cork.
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
30 December 2025Other applications received that week
Status
Application Closed
Decision
Grant with Conditions
Decision Date
7 April 2026
Grant Date
12 May 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

230m
09/6027REFUSED19 Jun 2009

Demolition of existing old dwelling and construction of bungalow

Baltydaniel West Mallow

710m
12/6204CONDITIONAL23 Oct 2012

Retention of extension to existing bungalow consisting of lounge on the ground floor and attic accommodation and retention of pitch roof to garage, boiler house and garage modified to include bathroom

Dromdowney Upper Mallow

735m
17/4193CONDITIONAL1 Feb 2017

The construction of new waste water treatment plant including (a) Control building, (b) over-ground glass lined steel SBR (Sequential Batch Reactor Wastewater Treatment process) tank, (c) overground precast concrete sludge holding tank, (d) underground balance tanks, (e) underground pump sump, (f) compound fencing and gates, (g) relocation of existing containerised kiosk (to be used for the storage of equipment and bunded containers of liquid additives for use in treatment process) (h) de-commissioning of existing wastewater treatment plant and (i) all ancillary works associated with the proposed development to serve their existing manufacturing plant

Baltydaniel West and Baltydaniel East Mallow Co.Cork

752m
26/1191Grant with Conditions7 May 2026

Permission for a change to condition number 11 of planning reference 24/6313, which required the northern site entrance to be blocked up. Permission is now being sought to keep the northern site entrance and to close the southern site entrance.

Baltydaniel East and Baltydaniel West, Mallow, Co. Cork. P51 WF9D

752m
24/6313Conditional Permission5 Dec 2024

1) Permission for retention of the existing dwelling as constructed (change of layout and design from that previously granted under reference number 75/925). 2) Permission for retention of the attached lean-to storage area to side of dwelling. 3) Permission for decommissioning of the existing septic tank and installation of a new wastewater treatment system. 4) Permission for retention of the existing site boundaries (change to the site boundary granted under reference 75/925).

Baltydaniel East & Baltydaniel West Mallow Co.Cork

804m
03/5899CONDITIONAL12 Nov 2003

Dormer dwelling

Copsetown Mallow Co. Cork

824m
14/5680INCOMPLETED APPLICATION6 Aug 2014

Extension to an existing dwelling and associated site works

Dromsligo Mallow

827m
04/3000CONDITIONAL4 May 2004

Dwellinghouse

Baltydaniel East Mallow

827m
05/4842INCOMPLETED APPLICATION8 Jul 2005

Dormer dwelling

Baltydaniel East Mallow

828m
17/5503CONDITIONAL14 Jun 2017

Demolition of milking parlour and construction of new agricultural shed. To include milking parlour, loose house with slatted tank and feeding passage and all associated site works.

Dromdowney Upper Mallow Co. Cork

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?