Site of former Scoil an Athar Tadhg, Carrignavar, Co. Cork, T34 N276
Awaiting Clarification F.I. ResponsePlanning application 26/0127
Cork - Cork County Council
Proposed Development
The development consists of Refurbishment works to the existing school building on the former site of Scoil an Athar Tadhg, to deliver a purpose-built special educational needs school. The works to be retained consist of; The construction of 3 no. pitched roofs and the replacement of existing flat roof areas; A rooftop plant area; Modifications to the existing window openings with the installation of windows and roof lights; A new entrance extension; Internal reconfiguration works to the former school building to provide 6 No. SEN Classrooms and associated ancillary accommodation in line with the Department of Education’s SGD-02-04 design guidance; External hard and soft landscaping to include soft play areas & sensory garden; Alterations to existing staff parking area to provide a new set-down area within curtilage and additional staff parking; Minor alterations to the existing pedestrian gate and external pathways to allow for universal access. And all associated site works
Application Details
- Location
- Site of former Scoil an Athar Tadhg, Carrignavar, Co. Cork, T34 N276
- Applicant
- N/A
- Application Type
- Permission for Retention
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 January 2026
- Status
- Awaiting Clarification F.I. Response
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Provision of temporary accommodation comprising 2 No. cabins for use as (1) a classroom suite and equipment storage in the A.S.D. unit, and (2) an additional resource room and associated site development works
Scoil and Athar Tadhg Carrignavar
The provision of temporary accommodation comprising 1no. cabin for use as a classroom suite and storage, and for associated site development works
Scoil an Athar Tadhg Carraig na bhFear Village Carrignavar Co.Cork
Demolition of existing school building and removal of existing temporary accommodation on completion with the phased construction of a new two storey 16 classroom school building including office space, special education tuition rooms, library and resource rooms, general purpose and multi purpose spaces and ancillary accommodation with a single storey bolt-on 4 classroom ASD unit and associated withdrawal rooms, central activities space and ancillary accommodation, proposed site works to include provision for 42 no. car parking spaces with access from the public road via a new vehicular entrance, including drop-off and pick-up facilities with a set down for drop-off and pick-up associated with the ASD unit along a turning circle, bicycle rack, bus shelter, formation of 2 no. ballcourts, hard surface play spaces, ASD play area, oil tank enclosure, landscaping, boundary treatment and all other associated site development works. The development will also consist of a temporary car park and entrance, play area and boundary treatment with pedestrian and vehicular access points from the main road for use during the construction phase which will be located opposite the school site and this area shall be re-instated on completion of works on the existing school site
Scoil An Athar Tadhg Laharan Carrignavar
Temporary accommodation comprising 1 no. cabin for use as 1 no. classroom and 2 no. resource rooms and for associated site development works including 1 no. additional car parking space.
Scoil an Athar Tadhg Carraig na bhFear Village Carrignavar Co. Cork
Retention of temporary accommodation comprising of 4 no. cabins for use as 2 no. classrooms, 2 no. resource rooms, an equipment store and associated site development works
Scoil an Athar Tadhg Carrignavar Carraig na bhFear
Permission for retention of a single storey extension to creche/childcare facility.
Main Street Carrignavar Co Cork
Demolition of existing school building and removal of existing temporary accommodation on completion with the phased construction of a new two storey 16 classroom school building including office space, special education tuition rooms, library and resource rooms, general purpose and multi purpose spaces and ancillary accommodation with a single storey bolt-on 4 classroom ASD unit and associated withdrawal rooms, central activities space and ancillary accommodation, proposed site works to include provision for 42 no. car parking spaces with access from the public road via a new vehicular entrance, including drop-off and pick-up facilities with a set down for drop-off and pick-up associated with the ASD unit along a turning circle, bicycle rack, bus shelter, formation of 2 no. ballcourts, hard surface play spaces, ASD play area, oil tank enclosure, landscaping, boundary treatment and all other associated site development works. The development will also consist of a temporary car park and entrance, play area and boundary treatment with pedestrian and vehicular access points from the main road for use during the construction phase which will be located opposite the school site and this area shall be re-instated on completion of works on the existing school site - Extension of duration of permission granted under Planning Reg. No. 12/5568
Scoil an Athar Tadgh and Laharan Laharan, Carrignavar Co.Cork
The development will consist of alterations to previously permitted development, Planning Reg. No. 12/5568 consisting of revised elevational treatment to all facades of the proposed 2 storey 16 classroom school building and single storey bolt-on 4 classroom ASD unit
Scoil an Athar Tadhg Carrignavar Co. Cork
The development consists of : • Works to extend the existing staff car park to the front of the existing school building by approx 565sqm to facilitate the addition of 16 number new staff car parking spaces. • Installation of a new bike shelter to house minimum 14 bicycles • Demolition works to remove approx. 47m length of existing boundary wall inclusive of 1no. double vehicular gate and 1no. pedestrian gate and removal of existing concrete median at public road edge. • Construction of a new 1200mm high boundary wall, new double swing vehicular gate, new pedestrian gate, new 2000mm wide public footpath, new carpark surface And all associated site works
Carrignavar, Cork, Co. Cork, T34 N276
Permission consisting of works to extend the existing staff car park to the front of the existing school building by approx 694.4sqm. Relocation of 4 no. existing car parking spaces, Addition of 16 number new parking spaces. Installation of a new bike shelter to house minimum 14 bicycles. Demolition works to remove approx. 47m length of existing boundary walls inclusive of 1no. double vehicular gate and 1no. pedestrian gate. Removal of existing concrete footpath and concrete median at public road edge. Construction of a new 1200mm high boundary wall with stone capping, new double swing vehicular entrance gate, new pedestrian gate, new 2000mm wide public footpath, new carpark surface and all associated site works.
North Cork Community Special School (formerly known as Scoil an Athar Tadhg), Carrignavar, Cork, Co. Cork, T34 N276
The submission window has closed
Observations on this application closed on Thursday 26 February 2026, five weeks after it was received. The authority cannot accept a late submission.