Fair Street, Mallow, Co Cork
Invalid - Case ClosedPlanning application 26/0437
Cork - Cork County Council
Proposed Development
The development will consist/consists of the retention of 3 No. storage containers and the permission to redevelop the existing sports pitch at Fair Street, Mallow, Co. Cork utilising existing on-site services, to consist of: a) 2 No. playing pitches comprising 1 No. astroturf/all-weather multiuse pitch (Pitch no.
- 1)and 1 No. grassed soccer pitch (Pitch no.
- 2)and associated spectator areas; b) Astroturf / all-weather multi-use / warm-up area; c)The construction of 1 No. one-storey clubhouse building providing changing rooms, kitchen, meeting room, player and spectator welfare facilities; d) The provision of sports floodlights to serve both Pitches No. 1 & No. 2; e) Vehicular access to the proposed development will be provided via Fair Street with the extension of footpath to connect to the public footpath network; f) Provision of a community walkway with associated lighting around the perimeter of the site; g) All other ancillary site development works including fencing, landscaping, public lighting, surface car parking and bicycle parking facilities.
Application Details
- Location
- Fair Street, Mallow, Co Cork
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 February 2026
- Status
- Invalid - Case Closed
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for Retention of 3 No. storage containers and Permission to redevelop the existing sports pitch utilising existing on-site services, to consist of: a) 2 No. playing pitches comprising 1 No. astroturf/all-weather multiuse pitch (Pitch no. 1) and 1 No. grassed soccer pitch (Pitch no. 2) and associated spectator areas; b) Astroturf/all-weather multi-use/warm-up area; c) The construction of 1 No. one-storey clubhouse building providing changing rooms, kitchen, meeting room, player and spectator welfare facilities; d) The provision of sports floodlights to serve both Pitches No. 1 & No. 2; e) Vehicular access to the proposed development will be provided via Fair Street with the extension of footpath to connect to the public footpath network; f) Provision of a community walkway with associated lighting around the perimeter of the site; g) All other ancillary site development works including fencing, landscaping, public lighting, surface car parking and bicycle parking facilities.
Fair Street, Mallow, Co. Cork.
Permission for alterations and extension to existing dwelling consisting of the following; 1) retention of existing sunroom extension to the side of existing dwelling, 2) permission to demolish existing rear conservatory, for alterations to elevations and the construction of a new single storey extension to the side of existing dwelling and to incorporate a new connecting granny flat unit, 3) permission to replace the existing septic tank serving existing dwelling with a new secondary wastewater treatment unit and tertiary filter to serve same dwelling and 4) permission for construction of an new site entrance to serve existing dwelling and all associated site works and services.
Spaglen Mallow Co.Cork
permission for (a) the removal of existing tennis/basketball court and part demolition of the existing gym hall (b) the extending and refurbishment of the gym hall to enable use as a drama hall, providing dressing rooms. storage and toilets at lower ground level, a stage, auditorium, storage, toilets, waiting room and foyer at ground level and a seating balcony with projector room at mezzanine level (c) the construction of a separte single-storey building for sports equipment storage and changing facilities (d) all associated site development works including landscaping, signage and lighting
Fair Street Mallow Co. Cork.
permission for retention of domestic garage, first floor extension and rear extension to existing dwelling and to demolish existing front porch of same dwelling and to construct a new front porch in accordance with plans and documents submitted
No 16 Beechwood Park Mallow Co. Cork.
conversion of part of existing building from hostel to 2 no. apartments
Fair Street Mallow Co. Cork.
The construction of prefabricated building consisting of 5 no. classrooms, 2 no. offices, toilets and circulation space, relocation of part of existing carpark together with all other ancillary site works.
Saint Mary's Secondary School Fair Street Mallow Co. Cork
Construction of prefabricated building consisting of 5 no. classrooms, 2 no. offices, toilets and circulation space, relocation of part of existing carpark together with all other ancillary site works.
Fair Street Mallow Co. Cork
Permission for redevelopement of the existing convent and former school building at Fair Street, Mallow. This redevelopment comprises (i) the refurbishment and conservtion repair of the convent building (ii) demolition of parts of the convent, namely the three storey north-west wing, the upper two floors of the north -east wing, the single storey sacristy area, outoffices and covered walk, (iii) the erection of a new three storey extension to the rear of the convent linked to the main building (iv) erection of new outoffices to comprise garden stores, clothes drying area and bin compound. In addition it is intended to redevelop the former school building to change it's use to residential accomodation comprising 4 no. single living apartment units. The works also comprise associated site works to include landscaping, car parking, provision of a new covered walk and amenity areas, provision of vehicular access to the bungalow at the main entrance from the private entrance drive to the convent together with connections to the existing drainage and water supply services. The convent building is listed as a protected structure in Mallow Town Council Development Plan.
Convent of Mercy Fair Street Mallow Co. Cork.
The construction of new prefabricated school building incorporating 4 general classrooms, office and toilet facilities, connection of foul and surface water sewer systems, relocation of existing car parking to existing tennis court along with all ancillary site works.
Fair Street Mallow Td. Mallow Co. Cork
Permission for Retention of as built prefabricated building consisting of 5 no. classrooms, 2 no. offices, toilets and circulation space, footpaths and wheelchair ramps and existing temporary car park for a period of five years (permission previously granted for this development under planning reference number 18/5473).
Fair Street Mallow Co. Cork
The submission window has closed
Observations on this application closed on Sunday 29 March 2026, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?