← Back to search

Blackthorn House,, Cloverhill,, Gortnagross Td, Mallow, Co, Cork, P51 TC6E

Invalid - Case Closed

Planning application 26/0568

Cork - Cork County Council

Proposed Development

Fergus & Nadia Shivnen are applying for planning permission for the following works:

  1. (a)
    Retention of new field access and fencing from the local road to the west of the site
  2. (b)
    Retention of works undertaken including widening of existing field access from the public local road to the east of the dwelling, construction of new gravel driveway leading to the rear of the property including recontouring and change of site levels and repair and reconstruction of existing piped culvert.
  3. (c)
    Construction of a new timber shed for storge of tractor and all associated site works. Located at Blackthorn House, Cloverhill, Gortnagross Td, Mallow, Co, Cork P51 TC6E.
View the full application file on the council's planning portal →

Application Details

Location
Blackthorn House,, Cloverhill,, Gortnagross Td, Mallow, Co, Cork, P51 TC6E
Applicant
N/A
Application Type
Permission for Retention
Planning Authority
Cork County Council

Timeline

Registration Date
9 March 2026Other applications received that week
Status
Invalid - Case Closed
Decision
Pending

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
26/1509Refused8 Jun 2026

Permission for Retention of the following: (a) As constructed new field access to the west of the site for ease of access for farm machinery to applicants’ field for the use of cutting hay for domestic use. (b) Works undertaken including widening of existing access to the east of the dwelling, gravel driveway leading to the rear of the property, including recontouring and change of site levels and repair and reconstruction of existing culvert. Permission to construct a new timber shed for domestic use for the storage of coal/timber blocks and the storage of tractor and all associated site works.

Blackthorn House, Cloverhill, Gortnagross, Mallow, Co. Cork. P51 TC6E

48m
20/5278CONDITIONAL23 Jun 2020

Permission for retention of alterations to existing dwelling previously permitted under planning reference number 05/2979 consisting of the following: (1) increase in over all height of dwelling, (2) front entrance steps, (3) alterations made to elevations consisting of changes made to window and door opes, and bay window roofs, (4) enlarged balcony area to the rear and for permission to erect a screen to the eastern side of balcony being retained to the rear.

Gortnagross TD Mallow Co. Cork

48m
20/4068CONDITIONAL21 Jan 2020

Retention of alterations to existing dwelling previously permitted under planning reference number 05/2979 consisting of the following: (1) Increased floor area of basement with the addition of 2 No. windows to the front and 1 No. window to the side. (2) Increased floor area of first floor attic space with the addition of 3 No. dormer window to the rear and 2 No. windows to the front and 1 No. window to the side. (3) The addition of a patio door to the side of the ground floor plan with associated balcony and steps and all associated elevational treatment and all associated site works.

Gortnagross TD Mallow Co. Cork

168m
14/5948Conditional Permission15 Sept 2014

Construction of a two storey rear extension to existing dwellinghouse, new vehicular access, treatment unit and associated site works

Gortnagross Mallow

189m
03/1590CONDITIONAL7 Apr 2003

Dwellinghouse

CLOVERHILL, CLOVERHILL, GORTNAGROSS,

242m
08/6426WITHDRAWN30 Apr 2008

Dwelling, proprietary wastewater treatment system and associated site works

Gortnagross Mallow

244m
20/5629CONDITIONAL30 Jul 2020

Alterations and attic conversion to existing single storey dwelling house to include alterations to ground floor, conversion of existing first floor attic space into kitchen, dining and living space including new flue, and alterations to front, rear and side (east) elevations including 2 no. dormer structures, new roof windows, removal of chimney and relocation of solar panels to the front, new dormer structure and roof windows to the rear, and alterations to openings to the side; together with internal alterations and associated site and ancillary works.

Clover Hill Gortnagross Townland Mallow Co. Cork

288m
04/7031REFUSED16 Sept 2004

Dwellinghouse

Gortnagross Mallow

312m
07/7504WITHDRAWN3 May 2007

Single storey dwelling

Gortnagross Mallow

312m
07/5996INCOMPLETED APPLICATION13 Mar 2007

Single storey dwellinghouse

Gortnagross Mallow

The submission window has closed

Observations on this application closed on Sunday 12 April 2026, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?