Hamilton High School, Allen Squrare, Bandon, P72 C983
Invalid - Case ClosedPlanning application 26/0788
Cork - Cork County Council
Proposed Development
Planning permission for the construction of a new single storey school building (238m2), soft play area (100 m2), and all associated site works. The Development for which permission is sought is located within the curtilage of Protected Structures ( Ref. No. 955 & 962)
View the full application file on the council's planning portal →Application Details
- Location
- Hamilton High School, Allen Squrare, Bandon, P72 C983
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 30 March 2026
- Status
- Invalid - Case Closed
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Planning permission for the construction of a new single storey school building (238m2), soft play area (100 m2), the proposed relocation of the existing play-area, and all associated site works at Hamilton High School, Allen Square, Bandon, Co. Cork. The Development for which permission is sought is located within the curtilage of Protected Structures ( Ref. No. 955 & 962).
Hamilton High School, Allen Squrare, Bandon, Co. Cork, P72 C983
A new 20 meter long and 5 meter high hurling wall to the North of the existing school, along with all associated site works within the site curtilage of the existing school, also within the curtilage of existing protected structures together at Hamilton High School.
Hamilton High School Allen Square Coolfadda Bandon, Co. Cork
Permission for a new 49m2 pre-fabricated first floor classroom unit, placed over the existing pre-fabricated classroom on site, granted under Planning Reg. No. 19/5355, along with new galvanised steel access stairs and all associated site works within the site curtilage of the existing school, also within the curtilage of exiting protected structures.
Hamilton High School Allen Square Coolfadda Bandon, Co. Cork
To erect a 49sq.m pre-fabricated unit to the western side of the existing school within the site curtilage of the existing school, also within the curtilage of existing protected structures together with all associated site works.
Hamilton High School Allen Square Coolfadda Bandon, Co. Cork
A) The existing all-weather playing surface measuring 60.00m. x 22.50m. B) The existing 2.40m. high mesh perimeter fencing with high level sports netting serving the all-weather playing surface. C) The existing concrete access path serving the all-weather playing surface. D) All ancillary works. The development for which permission for retention is sought is located within the curtilage of protected structures (REF No. 955 and 962).
Hamilton High School Allen Square Coolfadda, Bandon Co. Cork
A) The existing all-weather playing surface measuring 60.00m x 22.50m, B) The existing 2.40m high mesh perimeter fencing with high level sports netting serving the all-weather playing surface, C) The existing concrete access path serving the all-weather playing surface, and D) All ancillary works. The development for which permission for retention is sought is located within the curtilage of Protected Structures (Ref.No. 955 and 962).
Hamilton High School Allen Square Coolfadda Bandon Co Cork
Permission for the construction of a 539.14sq.m stand-alone school sports hall (incl 35.04sqm first floor mezzanine storage space) to serve the existing secondary school, connection to existing services, and all ancillary works. The development for which permission is sought is located within the curtilage of protected structures (ref no. 955 and 962)
Hamilton High School Allen Square, Coolfadda Bandon Co.Cork
Planning permission for the construction of a new single storey school building (238m2), soft play area (100 m2), the proposed relocation of the existing play-area, and all associated site works at Hamilton High School, Allen Square, Bandon, Co. Cork. The Development for which permission is sought is located within the curtilage of Protected Structures ( Ref. No. 955 & 962)
Hamilton High School, Allen Sqaure, Bandon, Co.Cork, P72 C983
Construction of new stand-alone single storey classroom block, comprising 5 no. classrooms within the site curtilage of the existing school, and all associated site works
Hamilton High School Allen Square Coolfadda Bandon, Co.Cork
Alterations and two storey extension to dwellinghouse and demolition of garage
High Garth Allen Square Coolfadda Bandon
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?