Páiric Liam Úi Riain, Rostellan, Co.Cork, P25 P6F8
Invalid - Case ClosedPlanning application 26/1666
Cork - Cork County Council
Proposed Development
The construction of a new all-weather 4G astro Training Pitch including perimeter fencing and 8 no. light poles, and all associated site works, all within the curtilage of Protected Structures
Application Details
- Location
- Páiric Liam Úi Riain, Rostellan, Co.Cork, P25 P6F8
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 23 June 2026
- Status
- Invalid - Case Closed
- Decision
- Pending
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the construction of a new all-weather 4G astro Training Pitch including perimeter fencing and 8 no. light poles, and all associated site works, all within the curtilage of Protected Structures
Páiric Liam Úi Riain,, Rostellan,, Midleton, Co.Cork, P25 P6F8
Upgrading of pitch floodlighting including 6 no. light poles and metal halide floodlighting arrays
Rostellan Aghada
Permission for Retention of an existing single storey detached portacabin being used as meetings rooms; and Planning Permission for the construction of a Sauna Facility including a sauna, changing rooms and staff check-in hut, all to be single storey detached units, and all enclosed by a 2.8m high perimeter timber fence, and all associated site works, all within the curtilage of Protected Structures
Páiric Liam Úi Riain,, Rostellan,, Co.Cork, P25 P6F8
Two-storey extension to rear of existing dwelling
16 Ballynafarsid Midleton
Conversion of first floor of existing surgery to one bed apartment
Ballynafarsid Rostellan
Construction of ground floor porch extension and conversion of first floor of surgery to 1 no. apartment
Ballynafarsid Rostellan
Permission to subdivide existing commercial/residential building so as to provide a semi-detached two storey dwelling in part there of and maintain (1) reduced sized commercial unit at ground floor and (2) reduced sized apartment at first floor. Carry out sundry alterations to existing elevations to include (1) alterations to dwelling entrance and provision of elongated window adjacent. (2) replace existing hardwood windows and doors with coloured pvc units and (3) include new entrance and stair access to reduced first floor apartment.
Ballynafarsid Rostellan Aghada Co. Cork
Alterations, ground floor and 1st floor extension to dwelling
15 Farsid Ballynafarsid Midleton
Two storey extension at rear of dwelling house incorporating roof-lights and refurbishment of the existing dwelling
13 Ballynafarsid Rostellan
Permission for : 1) The construction of a new first floor extension to accommodate meeting rooms and a multi-functional open space, 2) Changes to the existing elevations to incorporate new windows, 3) All associated site works; all to the existing detached two-storey high indoor hall and club dressing rooms building within the curtilage of Protected Structures.
Páiric Liam Úi Riain Rostellan Co Cork
The submission window has closed
Observations on this application closed on Monday 27 July 2026, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?