Ballintaggart Townland, Ringaskiddy, Co. Cork, P43 X336
Awaiting RecommendationPlanning application 26/1881
Cork - Cork County Council
Proposed Development
Planning permission for the construction of a single storey Electrical Room extension over service void on the roof of the existing Blower House Building including external access stairs and ladders and ancillary site works including the demolition of site plant at their production facility at Ballintaggart Townland, Ringaskiddy, Co. Cork. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-06. As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the Third Schedule of the Major Accident Regulations will be submitted with the application.
View the full application file on the council's planning portal →Application Timeline
Application received
14 Jul 2026
Decision due (upcoming)
7 Sept 2026
Application Details
- Location
- Ballintaggart Townland, Ringaskiddy, Co. Cork, P43 X336
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 14 July 2026
- Status
- Awaiting Recommendation
- Decision
- Pending
- Decision Due
- 7 September 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of a 1 storey water treatment & electrical building and a 2 storey electrical room extension to the existing finished goods building at the production facility. The site currently operates under an Industrial Emissions (IE) license (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.
Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork
The construction of a ground floor extension to the rear of the existing Engineering Building and a one storey electrical building to the north west of the existing Engineering Building at their production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013-04. The development refers to a modification to an establishment to which the Major Accident Directive applies.
Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork
Construction of a sub-station at production facility. The proposed development is covered by an existing Industrial Emissions Licence No. P0013-04. The development refers to a modification to an establishment to which the Major Accident directive applies.
Ballintaggart and Ballybricken Ringaskiddy Co. Cork
Replacement of solvent towers and extension to tanker unloading facility and control room
API Plant Ballintaggart Ringaskiddy
The construction of a one storey extension to the north east corner of the existing Drum Pad warehouse, minor elevation changes and all associated site works at the production facility. The site currently operates under an Industrial Emissions (IE) license (P0013-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (control of major accident hazards involving dangerous substances) regulations 2015 (S.I. 209 of 2015) applies.
Ballintaggart Ballybricken Ringaskiddy Co. Cork
Construction of a small scale production unit comprising of an extension and redevelopment of existing ancillary production building 194 Cell 2 and west access stairs including construction of an additional stairs block and penthouse on the roof of the existing building.
Ballintaggart Ballybricken Ringaskiddy Co.Cork
Demolition of workshop and stores, OSP2 drum store and organic synthesis production no. 2 (OSP2 Production Building) excluding integrated sub-station.
Ballintaggart and Ballybricken Ringaskiddy
Construction of extension at ground, first, second and penthouse floor levels of the existing organic synthesis production building No.1 and an ancillary single storey shed to accommodate cylinder storage
Ballintaggart Ballybricken Ringaskiddy Co.Cork
Construction of 2 no. storage sheds adjacent to the existing Organic Synthesis Plant 4 Finished Goods Building at their production facility. The proposed development is covered by an existing Industrial Emissions Directive Licence No. P0013-04. The development refers to a modification to an establishment to which the Major Accident directive applies.
Ballintaggart and Ballybricken Townlands Ringaskiddy Co Cork
Construction of a two-storey extension at ground floor level to an existing Laboratory building at their production facility at Ballintaggart and Ballybricken townlands. The proposed extension will consist of a hydrogenation room, an electrical room, a fumehood laboratory, laboratory technology space and an associated external covered canopy with a combined floor area of 207m².
Ballintaggart and Ballybricken Townlands Ringaskiddy Co. Cork
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?