Market Green, Knockgriffin, Midleton, Co. Cork
Awaiting RecommendationPlanning application 26/2308
Cork - Cork County Council
Proposed Development
Cork Co-Operative Marts Limited are applying for planning permission for the construction of 27 no. residential units comprising of 13 no. 2 bed apartments and 14 no. 3 bed apartments in a scheme at Market Green, Knockgriffin, Midleton, Co. Cork. The development constitutes a second phase of the development to the south permitted under planning reference 17/5516. The development also includes the change of use of a portion [384m2] of the commercial car park to the east to accommodate the residential development [rear of Block A]. The proposed development also includes the reconfiguration of the existing commercial car park [permitted under 21/07085 and 04/5959] to the east for improved access and to facilitate parking for the scheme. The proposed development also includes associated car parking, drainage works, landscaping and boundary treatments, pedestrian crossing, surface treatments and all ancillary site development works. The two no vehicular access points to the site are from the south off the internal Market Green spine/distributor road.
Application Timeline
Application received
4 Sept 2026
Decision due (upcoming)
29 Oct 2026
Application Details
- Location
- Market Green, Knockgriffin, Midleton, Co. Cork
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- Cork County Council
Timeline
- Registration Date
- 4 September 2026
- Status
- Awaiting Recommendation
- Decision
- Pending
- Decision Due
- 29 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The construction of 26 no. residential units and 1 no. childcare facility [218m2] across 4 no. 1-3 storey blocks. The residential element comprises of 12 no. 2 bed ground floor apartments and 14 no. 3 bed duplex apartments in a scheme at Market Green, Knockgriffin, Midleton, Co. Cork. The development constitutes a second phase of the development to the south permitted under planning reference 17/5516. The development also includes the incorporation of part of the existing commercial car park to the east to be used as part of the private open space for the residential development [to the rear of block A]. The proposed development also includes the reconfiguration of the existing commercial car park to the east for improved access and to facilitate parking for the childcare facility [resulting in the reduction of 8 no. car parking spaces]. The proposed development also includes associated car parking, drainage works, landscaping and boundary treatments, pedestrian crossing, bin storage, surface treatments and all ancillary site development works including two no. vehicular access points to the south.
Market Green Knockgriffin Midleton Co. Cork
Construction of a new car showroom building consisting of a car showroom facility and a attached car workshop facility behind this. Permission is also sought for a new vehicular /pedestrian entrance from the public road, signage, new railing boundary at public foorpath, car parking, bike stands, landscaping, access road and all associated ancillary site works.
Market Green Knockgriffin Midleton Co.Cork
Extension to industrial unit, 2 no. signs, boundary wall and retention of fencing, alterations to elevation, lean to sheds and signage
KNOCKGRIFFIN, KNOCKGRIFFIN,
Construction of 3 no. pre-fabricated modular units for use as 3 no. classrooms and all associated site works
Market Green Knockgriffin Midleton
Construction of 3no. Pre-fabricated modular units for use as 3no. classrooms and all associated site works
Market Green Knockgriffin Midleton Co.Cork
Construction, in phases, of a modular pre-fabricated single storey school comprising 10 no. classrooms, support rooms, toilets, associated site works and connection to services
Market Green Knockgriffin Midleton Co. Cork
Change of use/site zoning & construction, in phases, of a modular pre-fabricated single storey school comprising 10no. classrooms, support room, toilets, associated site works and connection to services
Market Green Knockgriffin Midleton Co. Cork
Construction of a modular pre-fabricated single storey extension to existing school, comprising 3 no. classrooms and link corridor, alterations to existing rear classroom to include a resource room. store room and toilets, and all associated site works
Market Green Knockgriffin Midleton
Construction of 3 no. pre-fabricated modular units for use as 2 no. classrooms and 1 no. resource room within the existing school grounds and all associated site works
Market Green Knockgriffin Midleton Co. Cork
Construction of 3 no. pre-fabricated modular units for use as 3 no. classrooms within the existing school grounds and all associated site works
Market Green Knockgriffin Midleton
The submission window has closed
Observations on this application closed on Thursday 8 October 2026, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?