Planning application 26/2379

Cork - Cork County Council

Proposed Development

We, Inchamore Wind Designated Activity Company, intend to apply for permission for development of this site at the townlands of Inchamore (na hInse Móire), Milleeny (na Millíní) and Derreenaling (an Doirín Álainn), in Co. Cork. The development will consist of an amendment to Condition No. 6 of Planning Permission Pl. Ref. 23/5145, ACP. Ref. PL04.319216 for Inchamore Wind Farm. Permission is being sought to amend Condition No. 6 by removal of the following part of the condition which states ‘The wind farm shall not give rise to amplitude modulation, tonal or impulsive noise at noise sensitive locations’.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Sept 2026

  2. Decision due (upcoming)

    5 Nov 2026

Application Details

Location
Townlands of Inchamore (na hInse Móire),, Milleeny (na Millíní), and Derreenaling (an Doirín Álainn), in Co. Cork
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
11 September 2026
Status
Awaiting Admin Validation
Decision
Pending
Decision Due
5 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

216m
23/5145Refused7 Jun 2023

We, Inchamore Wind Designated Activity Company, intend to apply for permission for a ten-year planning permission for a renewable energy development. The entirety of the renewable energy development constitutes the provision of a five-turbine wind farm and all associated works on land in both Counties Cork and Kerry. The development for will consist of : 1) a wind farm with an operational lifespan of 35 years (from date of commissioning of the development), 2) the construction of five turbines with an overall ground to blade tip height ranging from 177m to 185m inclusive; a rotor diameter ranging of 149m to 155m inclusive; and a hub height ranging from 102.5m to 110.5m inclusive, 3)construction of permanent turbine hardstands and turbine foundations, 4) Construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing. 5) installation of a (35-year life cycle) meteorological mast with a height of 110m and a 4m lightning pole on top, such that the overall structure will be 114m, 6) development of an on-site borrow pit, 7) construction of a new permanent internal site access roads to include passing bays and all associated drainage infrastructure. 8) development of a permanent internal site drainage network and sediment control systems. 9) construction of a permanent 38 kV electrical substation including a control building with welfare facilities, all associated electrical plant and equipment, parking security fencing and gates, all associated underground cabling, wastewater holding tank, and all ancillary structures and works, 10) all associated underground electrical and communications cabling connecting the wind turbines to the on-site wind farm substation, 11) ancillary forestry felling to facilitate construction of the development, 12) all associated site development works including berms, landscaping, and soil excavation. Advisory note: A planning application is being lodged with Kerry County Council in relation to the elements of the project that are within the townland of Derryreag (Dhoire Aimhréidh) Co.Kerry, including the upgrade of the site entrance off the N22 and permanent forest track upgrade works. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS). Tá sé beartaithe againne, inchamore Wind Cuideachta Ghníomhaíochta Ainmnithe, iarratas adhéanamh ar Chead maidir le cead pleanála deich mbliana d’fhorbairt fuinnimh in-athnuaite. Is ionann an fhorbairt fuinnimh in-athnuaite ina hiomláine agus feirm ghaoithe cúig thuirbín a sholáthar ahus ne hoibreacha gaolmhara go léir ar thailte I gContaetha Chorcaí agus Chiarraí. Beigh an fhorbairt comhdhéanta de: 1) Feirm ghaoithe le saolré oibriúcháin 35 bliain (ó dháta coimisiúnaithe na forbartha), 2) Tógáil cúig thuirbín le aired iomlán ó thalamh go barr an lann le ó 177m go 185 san áireamh; trastomhas rótar ó 149m go 155m san áireamh; agus aired moil ó 102.5m go 110.5m san áireamh, 3) Tógáil cruasheatán tuirbíní, 4) Tógáil príomhshuíomh tógála sealadach amháin le hoifigí suímh shealadacha ghailmhara, limistéir pháirceála agus fálú slándála, 5) Suiteáil crann meisteareolaíochta (saolré 35 bliana) a bheidh 110 méadar ar aired agus cuaillle tintrí 4m ar a bharr, sa tslí is go mbeidh aired foriomlán se 114 méadar ag an struchtúr, 6) Forbairt sloc iasachtaí amháin ar an láthair, 7) Tógáil buanbhóithre rochtana inmheáncha nua don láithreán agus uasghrádú ar bhóithre rochtana inmheánacha láithreacha chun cúinsí pasála agus an bonneagar draenála gaolmhar go léir a áireamh. 8) Forbairt líonra inmheánach draenála suímh buan agus córais rialathe dríodair, 9) fostáisiún buan leictreach 38kV a thógáil lena n-áirítear foirgneamh rialaithe le háiseanna leasa, gach gléasra agus trealamh leictreach gaolmhar, páirceáil, fálú slándála agus geataí, gach cábla faoi thalamh a bhaineann leis, umar coinneála fuíolluisce, agus gach struchtúr agus oibreacha coi

Inchnamore / na hInse Móire Milleeny / na Millíní Derreenaling / an Doirín Álainn Co.Cork /Co.Chorcaí

1.0km
21/5127CONDITIONAL28 Apr 2021

The erection of a temporary 100m high lattice type meteorological mast for a period of 5 years. The structure will be fixed to ground anchors by stay wires and will include instruments for measuring local climate conditions and all ancillary works.

Inchamore Coolea Co. Cork

1.0km
11/4063UNCONDITIONAL18 Jan 2011

Completion of dwellinghouse permitted under Pl. Reg. No. 05/9367

Derreenaling Ballyvourney

1.0km
05/9367CONDITIONAL16 Dec 2005

Dwelling

Derreenaling Ballyvourney

1.1km
21/7318CONDITIONAL13 Dec 2021

Erecting a 30m high latticework telecommunications structure together with antennas, dishes and associated telecommunications equipment enclosed by security fencing and all associated site works with an extension to the existing access track.

Derreenaling (Td) Ballyvourney Co. Cork

1.1km
12/6032INCOMPLETED APPLICATION24 Sept 2012

Construction of 80m Temporary Meteorological Mast and associated guy wires. The lattice mast will hold anemometry equipment for wind measurement and will be located on land currently used for farming

Inchamore Coolea Co. Cork

1.1km
12/6100WITHDRAWN4 Oct 2012

Erection of an 80m temporary Meteorological Mast and associated guy wires. The lattice mast will hold anemometry equipment for wind measurement and will be located on land currently used for farming

Inchamore Coolea Co. Cork

1.3km
04/604CONDITIONAL5 Feb 2004

Dwelling, garage and treatment unit

Inchamore Coolea

1.3km
23646REFUSED6 Jun 2023

THE DEVELOPMENT IN COUNTY KERRY FORMS PART OF A RENEWABLE ENERGY DEVELOPMENT COMPRISING A FIVE-TURBINE WIND FARM AND ALL ASSOCIATED WORKS ON LANDS IN BOTH COUNTIES CORK AND KERRY. THE DEVELOPMENT IN COUNTY KERRY WILL CONSIST OF UPGRADE OF EXISTING FOREST ACCESS ROADS TO INCLUDE PASSING BAYS AND ALL ASSOCIATED DRAINAGE INFRASTRUCTURE, WORKS AT THE ENTRANCE TO AN EXISTING FOREST ROAD ACCESSED OFF THE N22 TO INCLUDE LOCALISED WIDENING OF THE FOREST ROAD AND CREATION OF A SPLAYED ENTRANCE, REMOVAL OF EXISTING VEGETATION FOR VISIBILITY SPLAYS AND REMOVAL OF STREET FURNITURE. ADVISORY NOTE: A PLANNING APPLICATION IS BEING LODGED WITH CORK COUNTY COUNICL IN RELATION TO THE ELEMENTS IN THE PROJECT THAT ARE WITHIN THE TOWNLANDS OF INCHAMORE, MILLEENY AND DERREENALING COUNTY CORK. THIS DEVELOPMENT INCLUDES FIVE WIND TURBINES, UNDERGROUND CABLING, SITE ACCESS ROADS, A BORROW PIT, A TEMPORARY SITE COMPOUND, A 38KV SUBSTATION AND ALL ASSOCIATED WORKS FOR WHICH A TEN-YEAR PLANNING PERMISSION IS BEING SOUGHT. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS)

DERRYREAG (NDOIRE AIMHRÉIDH) , CO KERRY

1.3km
16/5208CONDITIONAL19 May 2016

Permission for construction of a single storey extension with attached lean-to structure for domestic storage to rear, and porch extension to side of dwellinghouse, and Permission for retention of minor alterations to elevations (changes to doors and windows from that permitted under Planning Reg. No. 01/5772 to include: a door in place of the permitted window on rear eastern elevation, omission of window on rear elevation, inclusion of bathroom window on eastern elevation, and 1 no. larger window in place of 2 no. permitted smaller windows on western elevation. (Cead do sineadh aon stoir ar teach, le claonseantain ceangailte leis le haghaidh storala tis ar chuil, agus sineadh poirse ar taobh an ti, agus cead coinneala le haghaidh athruithe beaga ar na ingearchlonna (athruithe ar doirse agus fuinneoga o na cinn a bhi ceadaithe faoi Tag Pleanala Uimh 01/5772, a n-airitear doras in ionad an fhuinneog ceadaithe ar ingearchlo thoir cuil, fuinneog a fhagail ar lar on ingearchlo cuil, fuinneog folctha sa bhreis ar an ingearchlo thoir, agus 1 fuinneog mor in ionad 2 fuinneoga nios lu ar an ingearchlo thiar)

Inchamore Coolea Macroom Co. Cork

Affected by this application?

Open for submissions
23days left to make a submission

Observations close on Thursday 15 October 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?