← Back to search

Clogheen,, Clonakilty,, Co. Cork, P85 RD23

Awaiting Recommendation

Planning application 26/2508

Cork - Cork County Council

Proposed Development

  1. (a)
    Removal of existing temporary first floor staff facility and construction of single storey permanent staff facility in its place,
  2. (b)
    Construction of extensions to existing leisure centre building comprising of
    1. (i)
      Single storey female changing area, spa lounge area & equipment storage along with associated internal alterations and ancillary site and drainage works
    2. (ii)
      Construction of additional second storey above the existing leisure centre gym areas
    3. (iii)
      Construction of rooftop plant area above additional second storey.
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Sept 2026

  2. Decision due (upcoming)

    23 Nov 2026

Application Details

Location
Clogheen,, Clonakilty,, Co. Cork, P85 RD23
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
28 September 2026
Status
Awaiting Recommendation
Decision
Pending
Decision Due
23 November 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

17m
06/50041CONDITIONAL28 Jul 2006

for extension to existing ground floor entrance/reception area of approx 55m2 and for a 2 storey extension to existing leisure centre of 823m2 incorporating a) creche/play area b) coffee deck c) games room d) entrance lobby at ground floor level e) aerobics room f) gymnasium at first floor level for change of existing gymnasium 197m2 at first floor level to male/female changing rooms and for all associated site works

The Quality Hotel Clonakilty Cor Cork

62m
03/50003CONDITIONAL17 Feb 2003

to delete/alter conditions 1,2 and 3 of granted permission 19/02 namely construction of 4 no. apartments to be used as hotel suites

Clogheen Clonakilty Co Cork

74m
24/80CONDITIONAL23 Feb 2024

Construction of a single storey extension to the side of existing two storey cinema to create four lane Bowling Alley and all associated site works

Park Cinema Cloheen Clonakilty Co. Cork. P85 W894

80m
24/39INCOMPLETED APPLICATION29 Jan 2024

Construction of a single storey extension to the side of existing two storey cinema to create four lane Bowling Alley and all associated site works

Park Cinema Cloheen Clonakilty Co. Cork, P85 W894

108m
07/50019CONDITIONAL16 May 2007

to erect a dwellinghouse and associated site works

Clogheen Meadows Clogheen Clonakilty Co Cork

108m
05/50003REFUSED4 Feb 2005

construction of dwelling and associated site works

Clogheen Meadows Clogheen Clonakilty Co Cork

108m
06/50033REFUSED23 Jun 2006

to construct a dwelling house and associated site works

Clogheen Meadows Clogheen Clonakilty Co Cork

115m
15/165Conditional Permission30 Mar 2015

Construction of (1) a ten pin bowling alley consisting of 6 lanes, contained in a single storey building of 740 m2 (2) an outdoor Sky Trekking Centre of 0.36 hectares for aerial rope trekking with elevated platforms with a wooden climbing tower (3) An outdoor Laser Tag Course of 0.24 hectares with open wooden games structures, paving and pathways as well as associated landscaping , site works and site services

Cloheen Clonakilty Co Cork

115m
15/140INCOMPLETED APPLICATION19 Mar 2015

Construct (1) a ten-pin bowling alley consisting of 6 lanes, contained in a single storey building of 740 m2. (2) an outdoor Sky Trekking Centre, of .36 hectares, for aerial rope trekking with elevated platforms with a wooden climbing tower, (3) an outdoor Laser Tag Course, of .24 hectares, with open wooden games structures, paving and pathways, as well as associated landscaping, site works and site services

Cloheen Clonakilty Co. Cork

115m
15/120INCOMPLETED APPLICATION9 Mar 2015

Construct (1) a ten-pin bowling alley consisting of 6 lanes, contained in a single storey building of 740 m2. (2) and outdoor Sky Trekking Centre, of .36 hectares, for aerial rope trekking with elevated platforms with a wooden climbing tower, (3) an outdoor Laser Tag Course, of .24 hectares, with open wooden games structures, paving and pathways, as well as associated landscaping, site works and site services

Cloheen Clonakilty Co. Cork

Affected by this application?

Open for submissions
17days left to make a submission

Observations close on Sunday 1 November 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?