Proposed Development

10 year Permission for the proposed development of a windfarm and onsite substation on a site in the townlands of Oughtiery, Curraghawaddra and Carriganish, Co. Cork and a proposed underground38kv cable running through the townlands of Ballyvongane, Beheena, Carriganish, Leadawillin, Inchaleagh, Knockacroghera, Cappanagraun, Carrigadrohid, Coolalta, Coolacareen and Caum. The Proposed Development for which permission is sought will comprise: • Six wind turbines with a blade tip height of 150 m, a rotor diameter of 136 m, a hub height of 82 m, and all associated foundations and hard-standing areas in respect of each turbine; • Upgrade of existing site entrance with access onto the L3419 local road; • Construction of one temporary construction compound with associated temporary site offices, parking areas and security fencing; • One borrow pit. All works associated with the opening, aggregate, and reinstatement of the borrow pit; • Construction of new permanent internal site access tracks and temporary site access tracks, upgrade of existing internal site access tracks, to include passing bays and all associated drainage; Construction of drainage and sediment control systems; • Construction of one permanent onsite 38 kV electrical substation compound including: o One no. control building containing worker welfare facilities; o Electrical infrastructure and grid ancillary services equipment; o Parking; o Lighting; o Fencing; o Wastewater holding tank; o Rainwater harvesting equipment; o Communications equipment and storage; o Associated electrical plant; and, o All associated infrastructure, services, and site works including landscaping. • All works associated with the connection of the proposed wind farm to the national electricity grid, which will be via 38 kV underground cable connection; • All associated underground electrical and communications cabling connecting the wind turbines to the proposed wind farm control building; • Construction of a Meteorological Mast 82 m in height, and associated foundation and hard-standing area; • Four no. watercourse crossings on the grid connection route; • All related site works and ancillary development including site drainage, security gates, fencing, permanent and temporary signage, berms, landscaping, soil excavation and biodiversity mitigation and enhancements, including hedgerow and tree planting; and • Ancillary forestry felling (permanent) to facilitate construction and operation of the proposed project. A 35-year operational life from the date of full commissioning of the entire wind farm is being sought. The proposed onsite substation and grid connection will remain permanent infrastructure and form part of the national grid network. In addition to the Proposed Development listed above, the following related development will be subject to a future planning application: A Turbine Delivery Route (TDR) along which temporary accommodation works will be required within the townlands of Ardnacrushy, Ballintaggart, Ballyveerane, Coolcour, Gurteenroe, Kilboultragh, Knocknagappul, Loughbeg, Rahalisk, Shanbally, Shannonpark, County Cork. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application is subject to Section 34D of the Planning and Development Act 2000, as amended. Where a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001, as amended, shall apply. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) prepared in respect of the construction, operation and decommissioning of the Proposed Development described above, and temporary accommodation works to facilitate the delivery of turbine components from the Port of Ringaskiddy to the planning application site.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Oct 2026

  2. Decision due (upcoming)

    23 Dec 2026

Application Details

Location
Windfarm site within the townlands of, Oughtihery, Curraghawaddra, Carriganish, Underground 38 kV cable in the townlands of Beheena, Carriganish, Leadawillin, Inchaleagh, Knockacroghera, Cappanagraun, Carrigadrohid, Coolalta, Coolacareen & Caum, Cou
Applicant
N/A
Application Type
Permission
Planning Authority
Cork County Council

Timeline

Registration Date
29 October 2026Other applications received that week
Status
Awaiting Recommendation
Decision
Pending
Decision Due
23 December 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

497m
22/5048CONDITIONAL9 May 2022

Full planning permission for the construction of new dwelling house and domestic garage, new entrance, wastewater treatment system, together with all other ancillary site works.

Carriganish Coachford Co.Cork

497m
03/2082CONDITIONAL2 May 2003

Extension to dwellinghouse

CARRIGANISH, CARRIGANISH,

522m
08/6738CONDITIONAL16 May 2008

Demolition of garage and construction of two storey extension to dwelling

Carriganish Coachford

526m
06/8369INCOMPLETED APPLICATION26 Jun 2006

Slatted house with underground tank

Carriganish Coachford

526m
06/9214CONDITIONAL25 Jul 2006

Construction of slatted house with underground tank and change of use of silage shed to cubicle and creep house

Carriganish Coachford

528m
15/6223CONDITIONAL6 Oct 2015

Permission for (a) calf shed and ancillary site works, and( b) retention of slatted house with underground tank

Carriganish Coachford Co. Cork

541m
04/2163CONDITIONAL1 Apr 2004

Alterations and extension to dwelling

Carriganish Coachford

632m
06/8397CONDITIONAL27 Jun 2006

Dwellinghouse

Carriganish Coachford

656m
23/5612CONDITIONAL9 Aug 2023

Permission for the construction of a new single storey dwelling including new waste water treatment unit, percolation area, private well, new site entrance, decommissioning of existing treatment unit & install of new waste water treatment unit & percolation area servicing existing dwelling. Permission for retention of existing domestic garage & ancillary site works.

Leades Cross Leadawillin Coachford Co Cork

690m
06/7448CONDITIONAL24 May 2006

Dwellinghouse & septic tank

Leadawillin Coachford

Affected by this application?

Open for submissions
10days left to make a submission

Observations close on Wednesday 2 December 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?